(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML11278A170 | | | number = ML11278A170 |
| | issue date = 10/14/2011 | | | issue date = 10/14/2011 |
| | title = Shearon Harris Nuclear Plant, Unit 1 - Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate (TAC No. ME6169) | | | title = Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate |
| | author name = Mozafari B L | | | author name = Mozafari B |
| | author affiliation = NRC/NRR/DORL/LPLII-2 | | | author affiliation = NRC/NRR/DORL/LPLII-2 |
| | addressee name = Jefferson W | | | addressee name = Jefferson W |
Line 9: |
Line 9: |
| | docket = 05000400 | | | docket = 05000400 |
| | license number = NPF-063 | | | license number = NPF-063 |
| | contact person = Mozafari B L | | | contact person = Mozafari B |
| | case reference number = TAC ME6169 | | | case reference number = TAC ME6169 |
| | document type = Letter, Request for Additional Information (RAI) | | | document type = Letter, Request for Additional Information (RAI) |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 14, 2011 Mr. William Jefferson, Jr. Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 SHEARON HARRIS NUCLEAR PLAN, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NO. ME6169) | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 14, 2011 Mr. William Jefferson, Jr. |
| | Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 |
| | |
| | ==SUBJECT:== |
| | SHEARON HARRIS NUCLEAR PLAN, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NO. ME6169) |
|
| |
|
| ==Dear Mr. Jefferson:== | | ==Dear Mr. Jefferson:== |
|
| |
|
| By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 11124A180), as supplemented on June 23, 2011 (ADAMS Accession No. ML 11179A052), Carolina Power & Light Company requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant, Unit 1 from 2,900 megawatts thermal (MWt) to 2,948 MWt, an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly. | | By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11124A180), as supplemented on June 23, 2011 (ADAMS Accession No. ML11179A052), Carolina Power & Light Company requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant, Unit 1 from 2,900 megawatts thermal (MWt) to 2,948 MWt, an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly. |
| The NRC staff has reviewed your letter dated August 31,2011, which was in response to the NRC staff's August 4, 2011, request for additional information (RAI), and has determined that clarification of the additional information is needed. The specific questions are found in the enclosed RAI. It is requested that your response be provided by October 21, 2011, as discussed with your staff on September 28, 2011, via e-mail. If more time is needed to respond to the enclosed RAI, your request for additional time should include a basis for the need for an extension. | | The NRC staff has reviewed your letter dated August 31,2011, which was in response to the NRC staff's August 4, 2011, request for additional information (RAI), and has determined that clarification of the additional information is needed. The specific questions are found in the enclosed RAI. It is requested that your response be provided by October 21, 2011, as discussed with your staff on September 28, 2011, via e-mail. If more time is needed to respond to the enclosed RAI, your request for additional time should include a basis for the need for an extension. |
| Please feel free to contact me at 301-415-2020 or bye-mail at Brenda.Mozafari@nrc.gov if you have any questions on this issue or require a it nal time to submit your response. | | Please feel free to contact me at 301-415-2020 or bye-mail at Brenda.Mozafari@nrc.gov if you have any questions on this issue or require a it nal time to submit your response. |
| renda Mozafa I, Senior Project Manager lant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50400 | | renda Mozafa I, Senior Project Manager lant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50400 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| | RAI cc w/encl: Distribution via Listserv |
| | |
| | SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO.1 REQUEST FOR ADDITIONAL INFORMATION (RA!) REGARDING MEASUREMENT UNCERTAINTY RECAPTURE (MUR) POWER UPRATE TAC NO. ME6169 The Nuclear Regulatory Commission (NRC) staff has reviewed the additional information provided by the licensee in letter dated August 31, 2011 (Agencywide Documents Access and Management System Accession No. NIL11255A 132). Based on the NRC staff's review of the licensee's response, the staff requests the following additional information: |
| | : 1. In response to the staffs RAI number 9, the licensee stated in the last paragraph that the existing isophase bus will require increased cooling to accommodate the increase in Megawatt Electric (MWe). The licensee further stated that the plant will implement a modification to the isophase bus duct cooling during the planned spring 2012 refueling. |
| | Provide the proposed isophase bus duct ampere rating at the increased cooling, and demonstrate that the rating is adequate for the increased MWe and Mega Volt Ampere Reactive at MUR power uprate conditions (corresponding to 1136.5 Mega Volt Ampere at 0.9547 power factor as provided in response the staff's RAI number 4). |
| | : 2. In response to the staff's RAI number 2, the licensee stated that a software error was found that could result in an increase in the containment pressure and temperature for the loss-of-coolant accident (LOCA), and that the environmental qualification (EQ) evaluations have been performed to show that the EQ program's existing test limits provide sufficient margin to address the increases that result from correcting mass and energy releases for the LOCA conditions. |
| | Provide containment pressure and temperature profiles for the LOCA conditions before and after incorporation of the corrections necessary due the software error. Also, superimpose the bounding equipment EQ profiles to demonstrate adequate margin continues to exist. |
| | : 3. In response to the staff's RAI Number 2, under the discussion of Radiation Environments to support Equipment Qualification, Accident and Normal Conditions, the licensee stated that the normal operation doses inside the containment reflect the increase in specific activity of Nitrogen-16 (N-16) and are based on a core power level of 2900 megawatts thermal, averaged over the 60-year plant life. |
| | Describe the relationship between the rise in core power level and the rise in N-16 concentration. Also, describe the relationship between N-16 concentration and the normal operation radiation level considered for the qualification of electrical equipment inside containment. |
| | Enclosure |
| | |
| | October 14, 2011 Mr. William Jefferson, Jr. |
| | Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 |
|
| |
|
| RAI cc w/encl: Distribution via Listserv SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO.1 REQUEST FOR ADDITIONAL INFORMATION (RA!) REGARDING MEASUREMENT UNCERTAINTY RECAPTURE (MUR) POWER UPRATE TAC NO. ME6169 The Nuclear Regulatory Commission (NRC) staff has reviewed the additional information provided by the licensee in letter dated August 31, 2011 (Agencywide Documents Access and Management System Accession No. NIL 11255A 132). Based on the NRC staff's review of the licensee's response, the staff requests the following additional information: In response to the staffs RAI number 9, the licensee stated in the last paragraph that the existing isophase bus will require increased cooling to accommodate the increase in Megawatt Electric (MWe). The licensee further stated that the plant will implement a modification to the isophase bus duct cooling during the planned spring 2012 refueling.
| | ==SUBJECT:== |
| Provide the proposed isophase bus duct ampere rating at the increased cooling, and demonstrate that the rating is adequate for the increased MWe and Mega Volt Ampere Reactive at MUR power uprate conditions (corresponding to 1136.5 Mega Volt Ampere at 0.9547 power factor as provided in response the staff's RAI number 4). In response to the staff's RAI number 2, the licensee stated that a software error was found that could result in an increase in the containment pressure and temperature for the loss-of-coolant accident (LOCA), and that the environmental qualification (EQ) evaluations have been performed to show that the EQ program's existing test limits provide sufficient margin to address the increases that result from correcting mass and energy releases for the LOCA conditions.
| | SHEARON HARRIS NUCLEAR PLAN, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NO. ME6169) |
| Provide containment pressure and temperature profiles for the LOCA conditions before and after incorporation of the corrections necessary due the software error. Also, superimpose the bounding equipment EQ profiles to demonstrate adequate margin continues to exist. In response to the staff's RAI Number 2, under the discussion of Radiation Environments to support Equipment Qualification, Accident and Normal Conditions, the licensee stated that the normal operation doses inside the containment reflect the increase in specific activity of Nitrogen-16 (N-16) and are based on a core power level of 2900 megawatts thermal, averaged over the 60-year plant life. Describe the relationship between the rise in core power level and the rise in N-16 concentration.
| |
| Also, describe the relationship between N-16 concentration and the normal operation radiation level considered for the qualification of electrical equipment inside containment.
| |
| Enclosure October 14, 2011 Mr. William Jefferson, Jr. Vice President Carolina Power &Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165 SHEARON HARRIS NUCLEAR PLAN, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NO. ME6169)
| |
|
| |
|
| ==Dear Mr. Jefferson:== | | ==Dear Mr. Jefferson:== |
|
| |
|
| By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 11124A180). | | By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11124A180). as supplemented on June 23,2011 (ADAMS Accession No. ML11179A052), Carolina Power & Light Company requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant. Unit 1 from 2,900 megawatts- thermal (MWt) to 2,948 MWt. an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly. |
| as supplemented on June 23,2011 (ADAMS Accession No. ML 11179A052), Carolina Power & Light Company requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant. Unit 1 from 2,900 megawatts-thermal (MWt) to 2,948 MWt. an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly. | |
| The NRC staff has reviewed your letter dated August 31, 2011, which was in response to the NRC staff's August 4. 2011, request for additional information (RAI). and has determined that clarification of the additional information is needed. The specific questions are found in the enclosed RAI. It is requested that your response be provided by October 21, 2011, as discussed with your staff on September 28, 2011. via e-mail. If more time is needed to respond to the enclosed RAI, your request for additional time should include a basis for the need for an extension. | | The NRC staff has reviewed your letter dated August 31, 2011, which was in response to the NRC staff's August 4. 2011, request for additional information (RAI). and has determined that clarification of the additional information is needed. The specific questions are found in the enclosed RAI. It is requested that your response be provided by October 21, 2011, as discussed with your staff on September 28, 2011. via e-mail. If more time is needed to respond to the enclosed RAI, your request for additional time should include a basis for the need for an extension. |
| Please feel free to contact me at 301-415-2020 or bye-mail at Brenda.Mozafari@nrc.gov if you have any questions on this issue or require additional time to submit your response. | | Please feel free to contact me at 301-415-2020 or bye-mail at Brenda.Mozafari@nrc.gov if you have any questions on this issue or require additional time to submit your response. |
| Sincerely, IRA by JPaige fori Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 | | Sincerely, IRA by JPaige fori Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
| RAI cc w/encl: Distribution via Listserv DISTRIBUTION: | | RAI cc w/encl: Distribution via Listserv DISTRIBUTION: |
| PUBLIC LPL2-2 RIF RidsNrrDorlLpl2-2 RidsNrrDeEeeb RidsNrrLACSola RidsNrrPMShearonHarris RidsOgcRp RidsNrrDorlDpr RidsRgn2MailCenter RidsAcrsAcnw_MailCTR S 1 0 ADAM Accession No. ML 11278A 7 *B symemo OFFICE LPL2-2/PM LPL2-2/LA DE/EEEB/BC (A) LPL2-2BC LPL2-2/PM NAME BMozafari CSoia RMathew' DBroaddus BMozafari (FSaba for) (JPaige for) DATE 10/06/11 10/06/11 09/27/11 10/13/11 10/14/11 OFFICIAL AGENCY RECORD COpy}} | | PUBLIC LPL2-2 RIF RidsNrrDorlLpl2-2 RidsNrrDeEeeb RidsNrrLACSola RidsNrrPMShearonHarris RidsOgcRp RidsNrrDorlDpr RidsRgn2MailCenter RidsAcrsAcnw_MailCTR ADAM S Accession No. ML11278A170 *Bsymemo OFFICE LPL2-2/PM LPL2-2/LA DE/EEEB/BC (A) LPL2-2BC LPL2-2/PM NAME BMozafari CSoia RMathew' DBroaddus BMozafari (FSaba for) (JPaige for) |
| | DATE 10/06/11 10/06/11 09/27/11 10/13/11 10/14/11 OFFICIAL AGENCY RECORD COpy}} |
Letter Sequence RAI |
---|
TAC:ME6169, Clarify Application of Setpoint Methodology for LSSS Functions (Approved, Closed) |
|
MONTHYEARHNP-11-001, Request for License Amendment, Measurement Uncertainty Recapture Power Uprate2011-04-28028 April 2011 Request for License Amendment, Measurement Uncertainty Recapture Power Uprate Project stage: Request ML11165A1862011-06-10010 June 2011 NRR E-mail Capture - FW: Acceptance Review for Harris 1 Measurment Uncertainity Recapture (Mur) TAC ME6169 Project stage: Acceptance Review ML11206A4962011-06-29029 June 2011 NRR E-mail Capture - Draft RAI Questions to Support Harris Mur Review (ME6169) Project stage: Draft RAI ML11181A0162011-07-0101 July 2011 Acceptance for Review of Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Acceptance Review ML11213A0002011-07-29029 July 2011 NRR E-mail Capture - Measurement Uncertainty Recapture Power Uprate - Mur RAI (HP-HPB)(ME6169) Project stage: RAI HNP-11-073, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-08-0303 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI ML11213A1792011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11214A0792011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11214A1742011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI HNP-11-076, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-08-15015 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI HNP-11-034, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2011-08-16016 August 2011 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Project stage: Request HNP-11-079, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment2011-08-31031 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Project stage: Response to RAI ML11256A0262011-09-0606 September 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI HNP-11-082, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-09-0707 September 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI ML11272A0652011-09-28028 September 2011 NRR E-mail Capture - Additional Mur RAI (Emcb Part 2)(ME6169) Project stage: RAI ML11271A1652011-09-28028 September 2011 NRR E-mail Capture - Additional Mur RAI (EEB)(ME6169) Project stage: RAI ML1127300822011-09-30030 September 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1872011-09-30030 September 2011 NRR E-mail Capture - Mur RAI (Cvib)( ME6169) Project stage: RAI ML11276A1052011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1022011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11278A1702011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1072011-10-18018 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Project stage: RAI HNP-11-095, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI 9)2011-10-21021 October 2011 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI #9) Project stage: Response to RAI HNP-11-107, Supplement to Request for License Amendment Measurement Uncertainty Recapture Power Update2011-11-28028 November 2011 Supplement to Request for License Amendment Measurement Uncertainty Recapture Power Update Project stage: Supplement HNP-11-097, Request for License Amendment - Measurement Uncertainty Recapture Power Uprate Supplemental Information2011-12-20020 December 2011 Request for License Amendment - Measurement Uncertainty Recapture Power Uprate Supplemental Information Project stage: Supplement HNP-12-002, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Supplemental Information2012-02-0909 February 2012 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Supplemental Information Project stage: Supplement HNP-12-044, Response to Request for Additional Information on License Amendment Request - Measurement Uncertainty Recapture Power Uprate2012-03-26026 March 2012 Response to Request for Additional Information on License Amendment Request - Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI HNP-12-069, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Comments Re Amendment 1392012-06-0505 June 2012 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Comments Re Amendment 139 Project stage: Request ML12157A2812012-06-11011 June 2012 Correction to Issuance of Amendment No. 139 Measurement Uncertainty Recapture Power Uprate Project stage: Approval 2011-08-16
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20243012024-02-21021 February 2024 – NRC Operator Licensing Examination Approval 05000400/2024301 IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter IR 05000400/20230012023-05-10010 May 2023 Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000400/20220032022-11-10010 November 2022 Integrated Inspection Report 05000400/2022003 IR 05000400/20223012022-11-0202 November 2022 NRC Operator License Examination Report 05000400/2022301 ML22271A6202022-09-29029 September 2022 Notification of Shearon Harris Nuclear Power Plant Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2023010 ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition 2024-09-10
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24101A0522024-04-10010 April 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - ITS Alignments LAR (L-2023-LLA-0078) ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) ML24025A1592024-01-25025 January 2024 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information - Rvi AMP and Inspection Plan (L-2023-LLL-0016) ML23151A3482023-05-30030 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) ML23142A2732023-05-22022 May 2023 Duke Fleet - Request for Additional Information Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) ML23082A0432023-03-23023 March 2023 002 Radiation Safety Baseline Inspection Information Request Final ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22115A1412022-04-25025 April 2022 NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information ML21354A8612021-12-15015 December 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet Request RA-19-0352 - Alternative for RPV Closure Stud Exams (L-2020-LLR-0156) ML21258A3652021-09-15015 September 2021 Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2021011) and Request for Information (RFI) ML21172A2432021-06-21021 June 2021 NRR E-mail Capture - Request for Additional Information - Harris RA-20-0252 - LAR to Remove Extraneous Requirements from OL and TS (L-2021-LLA-0027) ML21036A1142021-02-0505 February 2021 NRR E-mail Capture - Request for Additional Information - Harris - Relief Request RA-20-0312 - SW Pinhole Leak (L-2020-LLR-0143) ML21049A2632021-02-0404 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Energy Fleet License Amendment Request to Revise Emergency Plan ML21032A0492021-02-0101 February 2021 NRR E-mail Capture - Request for Additional Information - Duke Fleet RA-20-0263 - Use of Later ASME B&Pv, XI for Repair - Replacement (L-2020-LLR-0124) ML20323A4072020-11-18018 November 2020 NRR E-mail Capture - Request for Additional Information - Brunswick License Exemption Request from 10CFR73 Annual Force on Force Exercise Requirements (EPIC L-2020-LLE-0180) ML20297A3072020-10-13013 October 2020 NRR E-mail Capture - Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - RCS Flowrate Reduction/Lbloca LAR ML20274A0462020-09-29029 September 2020 Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Revision 2 ML20247J3822020-09-0303 September 2020 Request for Additional Information - Shearon Harris Nuclear Power Plant, Unit 1 - Revise TS Related to Accident Monitoring and RFO Instrumentation ML19331A4002019-11-27027 November 2019 Request for Additional Information Regarding Licensing Action to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML19204A2682019-07-23023 July 2019 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information for the Escw System TS AOT Extension and Removal of an Expired Note in TS Risk Informed LAR (L-2019-LLA-0025) ML19136A2712019-05-28028 May 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding License Amendment Request to Modify the Departure from Nucleate Boiling Ratio Safety Limit to Address Transition to New Fuel Type ML19060A0912019-03-18018 March 2019 Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML19011A1372019-01-10010 January 2019 NRR E-mail Capture - Duke Energy Fleet RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML19007A3422018-12-21021 December 2018 NRR E-mail Capture - Duke Energy Fleet Draft RAIs - Relief Request 18-GO-001 - Proposed Alternative for Depth Sizing Qualification Examination of Welds (L-2018-LLR-0117) ML18332A4392018-11-28028 November 2018 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information for EAL Scheme Changes ML18337A1272018-11-28028 November 2018 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Request for Additional Information Regarding the Rts/Esfas Trip Setpoints Modification LAR ML18264A0282018-10-0909 October 2018 RAI Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization Aad Treatment of Structures, Systems and Components for Nuclear Power Reactors ML18145A1812018-06-18018 June 2018 Request for Additional Information, License Amendment Request to Revise Updated Final Safety Analysis Report to Incorporate Tornado Missile Risk Evaluator Methodology Into Licensing Basis RA-18-0011, Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools2018-05-30030 May 2018 Response to Request for Supplemental Information Regarding Duke Energy'S Response to GL 2016-01 Monitoring of Neutron-Absorbing Materials in Spent Fuel Pools ML18116A1052018-04-25025 April 2018 NRR E-mail Capture - Harris/Robinson RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) ML18108A7602018-04-18018 April 2018 NRR E-mail Capture - Harris/Robinson Draft RAIs - Change Technical Specifications to Support Performance of Core Reload Design and Safety Analyses (L-2017-LLA-0356) ML18058B2242018-02-26026 February 2018 Emailed Radiation Safety RFI ML18005A5482018-01-0808 January 2018 Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (CAC No. MF9996; EPID L-2017-LLA-0303) ML17345A8772017-12-11011 December 2017 NRR E-mail Capture - Harris and Robinson Supplemental RAI - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) ML17339A0722017-12-0404 December 2017 NRR E-mail Capture - Subject: Harris and Robinson Draft Supplemental RAIs - LAR to Adopt DPC-NE-3009-P, Revision 0, Thermal-Hydraulic Models for Transient Analysis, (L-2016-LLA-0012) ML17289A3062017-10-23023 October 2017 Shearon Harris Nuclear Plant, Unit 1 - Request for Additional Information Regarding License Amendment Request Proposing Changes to Emergency Diesel Generator Technical Specifications Surveillance Requirements (CAC No. MF9828; EPID L-2017-LLA-0244) ML17250B0172017-09-18018 September 2017 Shearon Harris, Unit 1 - Request for Additional Information Re: License Amendment Request Proposing New Set of Fission Gas Gap Release Fractions for High Burnup Fuel Rods that Exceed the LHGR Limit Detailed in RG 1.183, Table 3 (CAC No. MF9740) ML17241A0182017-08-30030 August 2017 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Spent Fuel Storage Pool Criticality Analyses ML17192A4842017-07-11011 July 2017 NRR E-mail Capture - Duke Energy Fleet RAIs Alternative for Reactor Pressure Vessel Flange Threads Examination (MF9513 to MF9521) ML17123A1332017-05-0909 May 2017 Shearon Harris Nuclear Plant, Unit 1 - Request for Additional Information Re: License Amendment Request to Relocate Specific TS Parameters to the COLR, Remove Reference to a Plant Procedure as it Pertains to the COLR in TSs, etc. (CAC No. MF8894) ML17109A2912017-04-19019 April 2017 NRR E-mail Capture - Shearon Harris Nuclear Power Plant, Unit 1 Final Request for Additional Information Concerning LAR to Adopt TSTF-339, TSTF-5 and Other Administrative Changes ML16363A0112016-12-27027 December 2016 Notification of Shearon Harris Nuclear Power Plant Design Basis Assurance Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2017007 ML16335A0462016-12-0606 December 2016 Shearon Harris Nuclear Power Plant, Unit 1 - Request for Additional Information Regarding License Amendment Request to Modify Diesel Fuel Oil Testing Surveillance Requirements (CAC No. MF7775) ML16288A0782016-10-26026 October 2016 Shearon Harris Nuclear Power Plant, Unit 1, and H.B. Robinson Steam Electric Plant, Unit No. 2 - Redacted, Request for Additional Information Re: Request to Adopt DPC-NF-2010 and DPC-NF-2011 Nuclear Design Methodology (CAC Nos. MF7693 and MF7694) ML16288A0042016-10-26026 October 2016 Shearon Harris Nuclear Plant, Unit 1 - Request For Additional Information Regarding License Amendment Request To Relocate The Explosive Gas Mixture And Liquid Holdup Tanks Technical Specifications Requirements (CAC No. MF8067) ML16223A4172016-08-0808 August 2016 Notification of Inspection and Request for Information ML16209A2642016-08-0202 August 2016 Shearon Harris Nuclear Plant, Unit 1 - Second Request For Additional Information Regarding License Amendment Request For A Temporary Change To Technical Specifications For The 'A' Emergency Service Water Pump Replacement (CAC No. MF7017) ML16028A1972016-02-0808 February 2016 Request for Additional Information Regarding License Amendment Request for a Temporary Change to Technical Specifications for the 'A' Emergency Service Water Pump Replacement ML15344A0302015-12-17017 December 2015 Request for Additional Information Application to Revise Technical Specifications for Methodology Report DPC-NE-2005-P, Revision 5, Thermal Hydraulic Statistical Core Design Methodology (MF5872/MF5873) 2024-07-31
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October 14, 2011 Mr. William Jefferson, Jr.
Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR PLAN, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NO. ME6169)
Dear Mr. Jefferson:
By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11124A180), as supplemented on June 23, 2011 (ADAMS Accession No. ML11179A052), Carolina Power & Light Company requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant, Unit 1 from 2,900 megawatts thermal (MWt) to 2,948 MWt, an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly.
The NRC staff has reviewed your letter dated August 31,2011, which was in response to the NRC staff's August 4, 2011, request for additional information (RAI), and has determined that clarification of the additional information is needed. The specific questions are found in the enclosed RAI. It is requested that your response be provided by October 21, 2011, as discussed with your staff on September 28, 2011, via e-mail. If more time is needed to respond to the enclosed RAI, your request for additional time should include a basis for the need for an extension.
Please feel free to contact me at 301-415-2020 or bye-mail at Brenda.Mozafari@nrc.gov if you have any questions on this issue or require a it nal time to submit your response.
renda Mozafa I, Senior Project Manager lant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50400
Enclosure:
RAI cc w/encl: Distribution via Listserv
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO.1 REQUEST FOR ADDITIONAL INFORMATION (RA!) REGARDING MEASUREMENT UNCERTAINTY RECAPTURE (MUR) POWER UPRATE TAC NO. ME6169 The Nuclear Regulatory Commission (NRC) staff has reviewed the additional information provided by the licensee in letter dated August 31, 2011 (Agencywide Documents Access and Management System Accession No. NIL11255A 132). Based on the NRC staff's review of the licensee's response, the staff requests the following additional information:
- 1. In response to the staffs RAI number 9, the licensee stated in the last paragraph that the existing isophase bus will require increased cooling to accommodate the increase in Megawatt Electric (MWe). The licensee further stated that the plant will implement a modification to the isophase bus duct cooling during the planned spring 2012 refueling.
Provide the proposed isophase bus duct ampere rating at the increased cooling, and demonstrate that the rating is adequate for the increased MWe and Mega Volt Ampere Reactive at MUR power uprate conditions (corresponding to 1136.5 Mega Volt Ampere at 0.9547 power factor as provided in response the staff's RAI number 4).
- 2. In response to the staff's RAI number 2, the licensee stated that a software error was found that could result in an increase in the containment pressure and temperature for the loss-of-coolant accident (LOCA), and that the environmental qualification (EQ) evaluations have been performed to show that the EQ program's existing test limits provide sufficient margin to address the increases that result from correcting mass and energy releases for the LOCA conditions.
Provide containment pressure and temperature profiles for the LOCA conditions before and after incorporation of the corrections necessary due the software error. Also, superimpose the bounding equipment EQ profiles to demonstrate adequate margin continues to exist.
- 3. In response to the staff's RAI Number 2, under the discussion of Radiation Environments to support Equipment Qualification, Accident and Normal Conditions, the licensee stated that the normal operation doses inside the containment reflect the increase in specific activity of Nitrogen-16 (N-16) and are based on a core power level of 2900 megawatts thermal, averaged over the 60-year plant life.
Describe the relationship between the rise in core power level and the rise in N-16 concentration. Also, describe the relationship between N-16 concentration and the normal operation radiation level considered for the qualification of electrical equipment inside containment.
Enclosure
October 14, 2011 Mr. William Jefferson, Jr.
Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR PLAN, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NO. ME6169)
Dear Mr. Jefferson:
By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11124A180). as supplemented on June 23,2011 (ADAMS Accession No. ML11179A052), Carolina Power & Light Company requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant. Unit 1 from 2,900 megawatts- thermal (MWt) to 2,948 MWt. an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly.
The NRC staff has reviewed your letter dated August 31, 2011, which was in response to the NRC staff's August 4. 2011, request for additional information (RAI). and has determined that clarification of the additional information is needed. The specific questions are found in the enclosed RAI. It is requested that your response be provided by October 21, 2011, as discussed with your staff on September 28, 2011. via e-mail. If more time is needed to respond to the enclosed RAI, your request for additional time should include a basis for the need for an extension.
Please feel free to contact me at 301-415-2020 or bye-mail at Brenda.Mozafari@nrc.gov if you have any questions on this issue or require additional time to submit your response.
Sincerely, IRA by JPaige fori Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
RAI cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 RIF RidsNrrDorlLpl2-2 RidsNrrDeEeeb RidsNrrLACSola RidsNrrPMShearonHarris RidsOgcRp RidsNrrDorlDpr RidsRgn2MailCenter RidsAcrsAcnw_MailCTR ADAM S Accession No. ML11278A170 *Bsymemo OFFICE LPL2-2/PM LPL2-2/LA DE/EEEB/BC (A) LPL2-2BC LPL2-2/PM NAME BMozafari CSoia RMathew' DBroaddus BMozafari (FSaba for) (JPaige for)
DATE 10/06/11 10/06/11 09/27/11 10/13/11 10/14/11 OFFICIAL AGENCY RECORD COpy