Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate
ML11276A105
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/14/2011
From: Mozafari B
Plant Licensing Branch II
To: Jefferson W
Carolina Power & Light Co
Mozafari B
References
TAC ME6169
Download: ML11276A105 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 October 14, 2011 Mr. William Jefferson, Jr.

Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR PLANT, UNIT 1-REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NO. ME6169)

Dear Mr. Jefferson:

By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11124A180), as supplemented on June 23,2011 (ADAMS Accession No. ML11179A052), Carolina Power & Light Company requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant, Unit 1 from 2,900 megawatts thermal (MWt) to 2,948 MWt. an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly.

The NRC staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). It is requested that your response be provided by October 28.

2011. as discussed with your staff on September 29,2011. If more time is needed to respond to the enclosed RAI, your request for additional time should include a basis for the need for an extension.

Please feel free to contact me at 301-415-2020 or bye-mail at brenda.mozafari@nrc.gov if you have any questions on this issue or require ad . ional time to submit your response.

If..-

enda Mozafari, enior Project Manager lant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

RAI cc w/encl: Distribution via Listserv

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO.1 REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE TAC NO. ME6169 By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11124A180), as supplemented on June 23 and September 6, 2011 (ADAMS Accession Nos. ML11179A052 and ML11256A026, respectively), Carolina Power &

Light Company (the licensee) requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant (HNP), Unit 1 from 2,900 megawatts thermal (MWt) to 2,948 MWt, an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly.

The NRC staff is reviewing your submittal and determined that additional information is needed to complete its review.

1. Table Matrix-1 of NRC RS-001, Revision 0, "Review Standard for Extended Power Uprates," provides the staffs basis for evaluating the potential for extended power uprates to induce aging effects on reactor vessel (RV) internals. Depending on the magnitude of the projected RV internals fluence, Table Matrix-1 may be applicable to the MUR application. In the Notes to Table Matrix-1, the staff states that guidance on the neutron irradiation-related threshold for irradiation-assisted stress corrosion cracking for pressurized water reactor RV internal components are given in BAW-2248A, "Demonstration of the Management of Aging Effects for the Reactor Vessel Internals,"

and WCAP-14577, Revision 1-A, "License Renewal Evaluation: Aging Management for Reactor Internals." The "Notes" to Table Matrix-1 state that for thermal and neutron embrittlement of cast austenitic stainless steel, stress corrosion cracking, and void swelling, licensees will need to provide plant-specific degradation management programs or participate in industry programs to investigate degradation effects and determine appropriate management programs. The BAW-2248A report and the WCAP-14577, Revision 1-A have been superseded by the MRP-227 report, "Pressurized Water Reactor (PWR) Internals Inspection and Evaluation Guidelines,"

which summarized the industry's most current recommended inspection and evaluation guidelines for RV internals. The safety evaluation dated June 22, 2011, lists the limitations and conditions imposed by the staff on use of the MRP-227 report. Please confirm the establishment of an inspection plan to manage the age-related degradation in the HNP, Unit 1 RV internals, or whether participation is planned in the industry's initiatives on age-related degradation of PWR RV internals, including submittal of a plant-specific program consistent with the MRP-227 report guidelines. For the former case, discuss your management of the above-mentioned aging effects on RV internals and demonstrate that the management is appropriate to ensure integrity and operability of RV internals to the end of license.

Enclosure

- 2

2. Enclosure 2,Section IV.1.C.v, "Effect on Upper Shelf Energy Calculation," states that all RV materials have Charpy upper shelf energy (USE) greater than the 50 ft-Ib acceptance criteria of 10 CFR Part 50, Appendix G, including the power uprate. Provide the specific Charpy USE value calculated for the limiting beltline material for 55 effective full power years neutron fluence, including the power uprate.

October 14, 2011 Mr. William Jefferson, Jr.

Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NO. ME6169)

Dear Mr. Jefferson:

By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11124A180), as supplemented on June 23, 2011 (ADAMS Accession No. ML11179A052), Carolina Power & Light Company requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant, Unit 1 from 2,900 megawatts thermal (MWt) to 2,948 MWt, an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly.

The NRC staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). It is requested that your response be provided by October 28, 2011, as discussed with your staff on September 29, 2011. If more time is needed to respond to the enclosed RAI, your request for additional time should include a basis for the need for an extension.

Please feel free to contact me at 301-415-2020 or bye-mail at brenda.mozafari@nrc.gov if you have any questions on this issue or require additional time to submit your response.

Sincerely, IRA by JPaige fori Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400

Enclosure:

RAI cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC LPL2-2 RfF RidsNrrDorlLpl2-2 RidsNrrDeEvib RidsNrrLACSola RidsNrrPMShearonHarris RidsOgcRp RidsNrrDorlDpr RidsRgn2MailCenter RidsAcrsAcnw_MailCTR C. Fairbanks, NRR ADAMS Accession No. ML11276A105 "By memo OFFICE LPL2-2/PM LPL2-2/LA NRRfDE/EVIB* LPL2-2BC LPL2-2/PM NAME BMozafari CSoia MMitchell DBroaddus BMozafari (SSheng for) (FSaba for) (JPaige for)

DATE 10/06/11 10/06/11 09/30/11 10/13/11 10/14/11 OFFICIAL AGENCY RECORD