MONTHYEARHNP-11-001, Request for License Amendment, Measurement Uncertainty Recapture Power Uprate2011-04-28028 April 2011 Request for License Amendment, Measurement Uncertainty Recapture Power Uprate Project stage: Request ML11165A1862011-06-10010 June 2011 NRR E-mail Capture - FW: Acceptance Review for Harris 1 Measurment Uncertainity Recapture (Mur) TAC ME6169 Project stage: Acceptance Review ML11206A4962011-06-29029 June 2011 NRR E-mail Capture - Draft RAI Questions to Support Harris Mur Review (ME6169) Project stage: Draft RAI ML11181A0162011-07-0101 July 2011 Acceptance for Review of Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Acceptance Review ML11213A0002011-07-29029 July 2011 NRR E-mail Capture - Measurement Uncertainty Recapture Power Uprate - Mur RAI (HP-HPB)(ME6169) Project stage: RAI HNP-11-073, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-08-0303 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI ML11213A1792011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11214A0792011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11214A1742011-08-0505 August 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI HNP-11-076, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-08-15015 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI HNP-11-034, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2011-08-16016 August 2011 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule Project stage: Request HNP-11-079, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment2011-08-31031 August 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Project stage: Response to RAI ML11256A0262011-09-0606 September 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI HNP-11-082, Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request2011-09-0707 September 2011 Response to Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate License Amendment Request Project stage: Response to RAI ML11272A0652011-09-28028 September 2011 NRR E-mail Capture - Additional Mur RAI (Emcb Part 2)(ME6169) Project stage: RAI ML11271A1652011-09-28028 September 2011 NRR E-mail Capture - Additional Mur RAI (EEB)(ME6169) Project stage: RAI ML1127300822011-09-30030 September 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1872011-09-30030 September 2011 NRR E-mail Capture - Mur RAI (Cvib)( ME6169) Project stage: RAI ML11276A1052011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1022011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11278A1702011-10-14014 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML11276A1072011-10-18018 October 2011 Request for Additional Information Regarding Measurement Uncertainty Recapture Project stage: RAI HNP-11-095, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI 9)2011-10-21021 October 2011 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Response to Request for Additional Information (RAI #9) Project stage: Response to RAI HNP-11-107, Supplement to Request for License Amendment Measurement Uncertainty Recapture Power Update2011-11-28028 November 2011 Supplement to Request for License Amendment Measurement Uncertainty Recapture Power Update Project stage: Supplement HNP-11-097, Request for License Amendment - Measurement Uncertainty Recapture Power Uprate Supplemental Information2011-12-20020 December 2011 Request for License Amendment - Measurement Uncertainty Recapture Power Uprate Supplemental Information Project stage: Supplement HNP-12-002, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Supplemental Information2012-02-0909 February 2012 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Supplemental Information Project stage: Supplement HNP-12-044, Response to Request for Additional Information on License Amendment Request - Measurement Uncertainty Recapture Power Uprate2012-03-26026 March 2012 Response to Request for Additional Information on License Amendment Request - Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI HNP-12-069, Request for License Amendment Measurement Uncertainty Recapture Power Uprate Comments Re Amendment 1392012-06-0505 June 2012 Request for License Amendment Measurement Uncertainty Recapture Power Uprate Comments Re Amendment 139 Project stage: Request ML12157A2812012-06-11011 June 2012 Correction to Issuance of Amendment No. 139 Measurement Uncertainty Recapture Power Uprate Project stage: Approval 2011-08-16
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter IR 05000400/20243012023-05-15015 May 2023 Notification of Licensed Operator Initial Examination 05000400/2024301 IR 05000400/20230012023-05-10010 May 2023 Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000400/20220032022-11-10010 November 2022 Integrated Inspection Report 05000400/2022003 IR 05000400/20223012022-11-0202 November 2022 NRC Operator License Examination Report 05000400/2022301 ML22271A6202022-09-29029 September 2022 Notification of Shearon Harris Nuclear Power Plant Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000400/2023010 ML22258A1262022-09-14014 September 2022 NRC Operator Licensing Examination Approval 05000400/2022301 ML22242A0022022-09-12012 September 2022 Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition ML22227A0682022-09-0202 September 2022 Alternative to Certain Inservice Testing Requirements in the American Society of Mechanical Engineers Code for Operation and Maintenance for Certain Target Rock Solenoid Valves IR 05000400/20220052022-08-24024 August 2022 Updated Inspection Plan for Shearon Harris Nuclear Power Plant (Report 05000400/2022005) IR 05000400/20224032022-08-23023 August 2022 Security Baseline Inspection Report 05000400/2022403 ML22126A0082022-08-0909 August 2022 Issuance of Amendment No. 194 Revise Technical Specifications Related to Reactor Protection System Instrumentation P7 IR 05000400/20220022022-08-0505 August 2022 Integrated Inspection Report 05000400/2022002 ML22161B0332022-07-28028 July 2022 Issuance of Amendment No. 193 Regarding Revision of Surveillance Requirements to Remove Shutdown Limitation IR 05000400/20220112022-07-20020 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000400 2022011 IR 05000400/20224022022-06-30030 June 2022 Material Control and Accounting Program Inspection Report 05000400/2022402 (OUO Removed) IR 05000400/20220102022-06-13013 June 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000400/2022010 ML22138A4012022-05-26026 May 2022 Project Manager Reassignment ML22101A2822022-05-0606 May 2022 Regulatory Audit Summary Related to the Review of License Amendment Regarding Revising the Flood Hazard Protection Scheme IR 05000400/20220012022-05-0404 May 2022 Integrated Inspection Report 05000400/2022001 IR 05000400/20224012022-03-24024 March 2022 Security Baseline Inspection Report 05000400/2022401 ML22020A0072022-03-10010 March 2022 Issuance of Amendment No. 192 Regarding Removal of Extraneous Content and Requirements from the Renewed Facility Operating License and Technical Specifications ML22010A2812022-03-0404 March 2022 Issuance of Amendments to Adopt TSTF-577, Rev. 1 Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0161 IR 05000400/20210062022-03-0202 March 2022 Annual Assessment Letter for Shearon Harris Nuclear Power Plant (Report No. 05000400/2021006) ML21351A4722022-02-10010 February 2022 Issuance of Amendment No. 190 Regarding Revision to Containment Spray Nozzle Test Frequency IR 05000400/20210042022-02-0404 February 2022 Integrated Inspection Report 05000400/2021004 ML22034A5352022-02-0202 February 2022 Notification of Licensed Operator Initial Examination 05000400/2022301 2024-01-30
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20555-0001 October 14, 2011 Mr. William Jefferson, Jr.
Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P. O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR PLANT, UNIT 1-REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NO. ME6169)
Dear Mr. Jefferson:
By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11124A180), as supplemented on June 23,2011 (ADAMS Accession No. ML11179A052), Carolina Power & Light Company requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant, Unit 1 from 2,900 megawatts thermal (MWt) to 2,948 MWt. an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly.
The NRC staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). It is requested that your response be provided by October 28.
2011. as discussed with your staff on September 29,2011. If more time is needed to respond to the enclosed RAI, your request for additional time should include a basis for the need for an extension.
Please feel free to contact me at 301-415-2020 or bye-mail at brenda.mozafari@nrc.gov if you have any questions on this issue or require ad . ional time to submit your response.
If..-
enda Mozafari, enior Project Manager lant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
RAI cc w/encl: Distribution via Listserv
SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO.1 REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE TAC NO. ME6169 By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11124A180), as supplemented on June 23 and September 6, 2011 (ADAMS Accession Nos. ML11179A052 and ML11256A026, respectively), Carolina Power &
Light Company (the licensee) requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant (HNP), Unit 1 from 2,900 megawatts thermal (MWt) to 2,948 MWt, an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly.
The NRC staff is reviewing your submittal and determined that additional information is needed to complete its review.
- 1. Table Matrix-1 of NRC RS-001, Revision 0, "Review Standard for Extended Power Uprates," provides the staffs basis for evaluating the potential for extended power uprates to induce aging effects on reactor vessel (RV) internals. Depending on the magnitude of the projected RV internals fluence, Table Matrix-1 may be applicable to the MUR application. In the Notes to Table Matrix-1, the staff states that guidance on the neutron irradiation-related threshold for irradiation-assisted stress corrosion cracking for pressurized water reactor RV internal components are given in BAW-2248A, "Demonstration of the Management of Aging Effects for the Reactor Vessel Internals,"
and WCAP-14577, Revision 1-A, "License Renewal Evaluation: Aging Management for Reactor Internals." The "Notes" to Table Matrix-1 state that for thermal and neutron embrittlement of cast austenitic stainless steel, stress corrosion cracking, and void swelling, licensees will need to provide plant-specific degradation management programs or participate in industry programs to investigate degradation effects and determine appropriate management programs. The BAW-2248A report and the WCAP-14577, Revision 1-A have been superseded by the MRP-227 report, "Pressurized Water Reactor (PWR) Internals Inspection and Evaluation Guidelines,"
which summarized the industry's most current recommended inspection and evaluation guidelines for RV internals. The safety evaluation dated June 22, 2011, lists the limitations and conditions imposed by the staff on use of the MRP-227 report. Please confirm the establishment of an inspection plan to manage the age-related degradation in the HNP, Unit 1 RV internals, or whether participation is planned in the industry's initiatives on age-related degradation of PWR RV internals, including submittal of a plant-specific program consistent with the MRP-227 report guidelines. For the former case, discuss your management of the above-mentioned aging effects on RV internals and demonstrate that the management is appropriate to ensure integrity and operability of RV internals to the end of license.
Enclosure
- 2
- 2. Enclosure 2,Section IV.1.C.v, "Effect on Upper Shelf Energy Calculation," states that all RV materials have Charpy upper shelf energy (USE) greater than the 50 ft-Ib acceptance criteria of 10 CFR Part 50, Appendix G, including the power uprate. Provide the specific Charpy USE value calculated for the limiting beltline material for 55 effective full power years neutron fluence, including the power uprate.
October 14, 2011 Mr. William Jefferson, Jr.
Vice President Carolina Power & Light Company Shearon Harris Nuclear Plant P.O. Box 165, Mail Zone 1 New Hill, NC 27562-0165
SUBJECT:
SHEARON HARRIS NUCLEAR PLANT, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE (TAC NO. ME6169)
Dear Mr. Jefferson:
By letter dated April 28, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML11124A180), as supplemented on June 23, 2011 (ADAMS Accession No. ML11179A052), Carolina Power & Light Company requested approval from the U.S. Nuclear Regulatory Commission (NRC) to increase the core thermal power level of Shearon Harris Nuclear Power Plant, Unit 1 from 2,900 megawatts thermal (MWt) to 2,948 MWt, an increase of approximately 1.66 percent over the present licensed power level and to change the power plant technical specifications accordingly.
The NRC staff is reviewing your submittal and has determined that additional information is needed to complete its review. The specific questions are found in the enclosed request for additional information (RAI). It is requested that your response be provided by October 28, 2011, as discussed with your staff on September 29, 2011. If more time is needed to respond to the enclosed RAI, your request for additional time should include a basis for the need for an extension.
Please feel free to contact me at 301-415-2020 or bye-mail at brenda.mozafari@nrc.gov if you have any questions on this issue or require additional time to submit your response.
Sincerely, IRA by JPaige fori Brenda Mozafari, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-400
Enclosure:
RAI cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL2-2 RfF RidsNrrDorlLpl2-2 RidsNrrDeEvib RidsNrrLACSola RidsNrrPMShearonHarris RidsOgcRp RidsNrrDorlDpr RidsRgn2MailCenter RidsAcrsAcnw_MailCTR C. Fairbanks, NRR ADAMS Accession No. ML11276A105 "By memo OFFICE LPL2-2/PM LPL2-2/LA NRRfDE/EVIB* LPL2-2BC LPL2-2/PM NAME BMozafari CSoia MMitchell DBroaddus BMozafari (SSheng for) (FSaba for) (JPaige for)