ML12047A156: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 02/16/2012 | | issue date = 02/16/2012 | ||
| title = Information Request to Support Upcoming Problem Identification and Resolution Inspection at Dresden Nuclear Power Station | | title = Information Request to Support Upcoming Problem Identification and Resolution Inspection at Dresden Nuclear Power Station | ||
| author name = Cameron J | | author name = Cameron J | ||
| author affiliation = NRC/RGN-III/DRP/B6 | | author affiliation = NRC/RGN-III/DRP/B6 | ||
| addressee name = Pacilio M | | addressee name = Pacilio M | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000237, 05000249 | | docket = 05000237, 05000249 | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 16, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | ||
-4352 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Line 23: | Line 22: | ||
==Dear Mr. Pacilio:== | ==Dear Mr. Pacilio:== | ||
This letter is to request information to support our biennial Problem Identification and Resolution (PI&R) inspection beginning April 2, | This letter is to request information to support our biennial Problem Identification and Resolution (PI&R) inspection beginning April 2, 2012, at the Dresden Nuclear Power Station. This inspection will be performed in accordance with the U. S. Nuclear Regulatory Commission (NRC) Baseline Inspection Procedure 71152. | ||
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection. | Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection. | ||
The documents requested are copies of performance reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The documents should be ready for NRC review by March 19, | The documents requested are copies of performance reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The documents should be ready for NRC review by March 19, 2012. Mr. Bob Orlikowski, the Lead Inspector, will contact your staff to determine the best method of providing the requested information. | ||
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Orlikowski at 630-829-9753 or Robert.orlikowski@nrc.gov. | |||
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. | |||
M. Pacilio The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | |||
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
/RA/ | |||
M. Pacilio The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. In accordance with 10 CFR 2.790 of the | Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-237, 50-249 License Nos. DPR-19, DPR-25 | ||
-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely, | |||
Docket Nos. 50-237, 50-249 License Nos. DPR | |||
-19, DPR-25 | |||
==Enclosure:== | ==Enclosure:== | ||
Requested Information to Support PI&R Inspection cc w/encl: Distribution via ListServ | |||
Requested Information for a Problem Identification and Resolution (PI&R) Inspection Please provide the information on a compact disc (one for each team member), if possible. Unless otherwise specified, the time frame for requested information is 2 years. | |||
: 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to: 1) corrective action process; 2) operating experience program; 3) employee concerns program; | |||
: 4) self-assessment program; 5) maintenance rule program and implementing procedures; | |||
Requested Information for a Problem Identification and Resolution (PI&R) Inspection Please provide the information on a compact disc (one for each team member), if possible. Unless otherwise specified, the time frame for requested information is 2 years. 1. Copies of the corporate and site level procedures and sub | : 6) operability determination process; 7) Degraded/non-conforming condition process (e.g., | ||
-tier procedures associated with the corrective action program. | RIS 2005-20); 8) System Health process or equivalent equipment reliability improvement programs; 9) Operational Decision Making (ODMI) process. | ||
This should include procedures related to | : 2. A listing of the top 10 risk-significant systems, components, and operator manual actions. | ||
: 1) corrective action process; 2) operating experience program; 3) employee concerns program; 4) self-assessment program; 5) maintenance rule program and implementing procedures; | |||
: 6) operability determination process; 7) | |||
Degraded/non | |||
-conforming condition process (e.g., RIS 2005-20); 8) System Health process or equivalent equipment reliability improvement programs; 9) Operational Decision Making (ODMI) process. | |||
: 2. A listing of the top 10 risk | |||
-significant systems, components, and operator manual actions. | |||
: 3. Scheduled date/time/location of all meetings associated with implementation of the corrective action program, such as Action report (AR) screening meetings, corrective action review board meetings, etc. | : 3. Scheduled date/time/location of all meetings associated with implementation of the corrective action program, such as Action report (AR) screening meetings, corrective action review board meetings, etc. | ||
: 4. List of all ARs generated sorted by priority, with the following information: number; priority; title; date initiated; and status (open or closed). | : 4. List of all ARs generated sorted by priority, with the following information: number; priority; title; date initiated; and status (open or closed). The ARs should be grouped by the initiating department (operations, maintenance, engineering, radiation protection, emergency preparedness, and security). | ||
The ARs should be grouped by the initiating department (operations, maintenance, engineering, radiation protection, emergency preparedness, and security). | |||
: 5. Listing of the total number of ARs generated annually, sorted by the above departments. | : 5. Listing of the total number of ARs generated annually, sorted by the above departments. | ||
: 6. A list of ARs generated as a result of identified trends. | : 6. A list of ARs generated as a result of identified trends. The list should be sorted by priority and have the following information: number, title, date initiated, status, and initiating department. | ||
The list should be sorted by priority and have the following information: | : 7. A list of outstanding corrective actions, sorted by priority, with a brief description, initiating date and due date. Please also identify and list any associated due date extensions. | ||
number, title, date initiated, status | : 8. List of control room deficiencies and operator work-arounds, sorted by priority, with a brief description and corresponding AR and/or work order number. | ||
, and initiating department. | |||
: 7. A list of outstanding corrective actions, sorted by priority, with a brief description, initiating date and due date. | |||
Please also identify and list any associated due date extensions. | |||
: 8. List of control room deficiencies and operator work | |||
-arounds, sorted by priority, with a brief description and corresponding AR and/or work order number. | |||
: 9. A chronological list of all nuclear quality assurance audits and department/station self-assessments. | : 9. A chronological list of all nuclear quality assurance audits and department/station self-assessments. | ||
: 10. All assessments or evaluations (internal or external) regarding station or department safety-culture. 11. A list of all operability determinations and ODMIs performed since April | : 10. All assessments or evaluations (internal or external) regarding station or department safety-culture. | ||
: 11. A list of all operability determinations and ODMIs performed since April 2010, with the following information: date initiated, initiating AR and status (open or closed). | |||
: 12. A copy of all root, apparent, and common cause evaluations. | : 12. A copy of all root, apparent, and common cause evaluations. | ||
: 13. A list of maintenance preventable functional failures (MPFFs) of risk | : 13. A list of maintenance preventable functional failures (MPFFs) of risk-significant systems (include actions completed and current status). A list of current Maintenance Rule a(1) systems and a list of those systems that entered a(1) within the last 2 years, but which were returned to a(2) status. Include a copy of the current system health report for those systems now in a(1). | ||
-significant systems (include actions completed and current status). | : 14. Copy of the latest corrective action program statistics such as the number initiated by department, human performance errors by department, backlog, corrective action timeliness and others as may be available. | ||
A list of current Maintenance Rule a(1) systems and a list of those systems that entered a(1) within the last 2 years, but which were returned to a(2) status. | |||
Include a copy of the current system health report for those systems now in a(1). 14. Copy of the latest corrective action program statistics such as the number initiated by department, human performance errors by department, backlog, corrective action timeliness and others as may be available. | |||
: 15. Any performance indicators associated with backlog of corrective maintenance items. | : 15. Any performance indicators associated with backlog of corrective maintenance items. | ||
: 16. List of industry operating experience evaluated by the site. | : 16. List of industry operating experience evaluated by the site. Additionally, list of all NRC generic communications (information notices, generic letters, etc.) evaluated by the site for applicability to the station regardless of the determination of applicability. | ||
Additionally, list of all NRC generic communications (information notices, generic letters, etc.) evaluated by the site for applicability to the station regardless of the determination of applicability. | : 17. A list of condition reports issued since April 2010 where the NRC was the identifying organization. This list should include non-cited and minor violations, and findings, regardless of whether there was an associated violation. Please provide the AR number, title, date initiated, and status. | ||
: 17. A list of condition reports issued since April 2010 where the NRC was the identifying organization. | |||
This list should include non | |||
-cited and minor violations, and findings, regardless of whether there was an associated violation. | |||
Please provide the AR number , title, date initiated | |||
, and status. | |||
: 18. A chronological list of all Licensee Event Reports, with a brief description of the affected components or systems. | : 18. A chronological list of all Licensee Event Reports, with a brief description of the affected components or systems. | ||
: 19. A chronological list of ARs, system audits, 50.59 screenings or evaluations, operability evaluations and ODMIs, maintenance rule, root or apparent cause evaluations, and permanent or temporary modifications associated with the Units 2 and 3 Low Pressure Coolant Injection systems since April | : 19. A chronological list of ARs, system audits, 50.59 screenings or evaluations, operability evaluations and ODMIs, maintenance rule, root or apparent cause evaluations, and permanent or temporary modifications associated with the Units 2 and 3 Low Pressure Coolant Injection systems since April 2007. Please indicate the status of the associated documents (i.e., open or closed) in the listing. | ||
: 20. A list of open temporary modifications. | |||
: 21. A list of the current maintenance backlog. Include the date initiated, a brief description, and a priority for each item sorted by system. | : 21. A list of the current maintenance backlog. Include the date initiated, a brief description, and a priority for each item sorted by system. | ||
: 22. A list of the current engineering backlog. Include the date initiated, a brief description, and priority of each item. | : 22. A list of the current engineering backlog. Include the date initiated, a brief description, and priority of each item. | ||
: 23. A list of the procedural change request backlog. Include the date initiated, a brief description, and priority of each item. | : 23. A list of the procedural change request backlog. Include the date initiated, a brief description, and priority of each item. | ||
Documents requested to be available as printed copies on-site during the inspection | Documents requested to be available as printed copies on-site during the inspection: | ||
: | : a. Updated Final Safety Analysis Report. | ||
: b. Technical Specifications. | |||
: c. The QA manual. | |||
: d. A list of issues brought to the ECP/Ombudsman and the actions taken for resolution. | |||
Ombudsman and the actions taken for resolution | : e. The latest organization chart and phone listing. | ||
: f. Self-assessments and associated condition reports generated in preparation for this inspection. | : f. Self-assessments and associated condition reports generated in preparation for this inspection. | ||
M. Pacilio The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. In accordance with 10 CFR 2.790 of the | M. Pacilio The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number. | ||
-rm/adams.html (the Public Electronic Reading Room). | In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Sincerely, | Sincerely, | ||
-19, DPR-25 | /RA/ | ||
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-237, 50-249 License Nos. DPR-19, DPR-25 | |||
==Enclosure:== | ==Enclosure:== | ||
Requested Information to Support PI&R Inspection cc w/encl: | Requested Information to Support PI&R Inspection cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\DRPIII\Dres\2012 Dresden PIR Information Request.docx X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME ROrlikowski:dtp JCameron DATE 02/16/12 02/16/12 OFFICIAL RECORD COPY | ||
DOCUMENT NAME: | |||
G:\DRPIII\Dres\2012 Dresden PIR Information Request.docx X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence | |||
Letter to M. Pacilio from J. Cameron dated February 16, 2012. | Letter to M. Pacilio from J. Cameron dated February 16, 2012. | ||
==SUBJECT:== | ==SUBJECT:== | ||
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT DRESDEN NUCLEAR POWER STATION DISTRIBUTION | INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT DRESDEN NUCLEAR POWER STATION DISTRIBUTION: | ||
Breeda Reilly RidsNrrDorlLpl3-2 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Charles Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports.Resource@nrc.gov}} | |||
-2 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Charles Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports.Resource@nrc.gov}} |
Latest revision as of 09:08, 12 November 2019
ML12047A156 | |
Person / Time | |
---|---|
Site: | Dresden |
Issue date: | 02/16/2012 |
From: | Jamnes Cameron NRC/RGN-III/DRP/B6 |
To: | Pacilio M Exelon Generation Co, Exelon Nuclear |
References | |
Download: ML12047A156 (7) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 February 16, 2012 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT DRESDEN NUCLEAR POWER STATION
Dear Mr. Pacilio:
This letter is to request information to support our biennial Problem Identification and Resolution (PI&R) inspection beginning April 2, 2012, at the Dresden Nuclear Power Station. This inspection will be performed in accordance with the U. S. Nuclear Regulatory Commission (NRC) Baseline Inspection Procedure 71152.
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.
The documents requested are copies of performance reports and lists of information necessary to ensure the inspection team is adequately prepared for the inspection. The documents should be ready for NRC review by March 19, 2012. Mr. Bob Orlikowski, the Lead Inspector, will contact your staff to determine the best method of providing the requested information.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call or e-mail Mr. Orlikowski at 630-829-9753 or Robert.orlikowski@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.
M. Pacilio The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-237, 50-249 License Nos. DPR-19, DPR-25
Enclosure:
Requested Information to Support PI&R Inspection cc w/encl: Distribution via ListServ
Requested Information for a Problem Identification and Resolution (PI&R) Inspection Please provide the information on a compact disc (one for each team member), if possible. Unless otherwise specified, the time frame for requested information is 2 years.
- 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to: 1) corrective action process; 2) operating experience program; 3) employee concerns program;
- 4) self-assessment program; 5) maintenance rule program and implementing procedures;
- 6) operability determination process; 7) Degraded/non-conforming condition process (e.g.,
RIS 2005-20); 8) System Health process or equivalent equipment reliability improvement programs; 9) Operational Decision Making (ODMI) process.
- 2. A listing of the top 10 risk-significant systems, components, and operator manual actions.
- 3. Scheduled date/time/location of all meetings associated with implementation of the corrective action program, such as Action report (AR) screening meetings, corrective action review board meetings, etc.
- 4. List of all ARs generated sorted by priority, with the following information: number; priority; title; date initiated; and status (open or closed). The ARs should be grouped by the initiating department (operations, maintenance, engineering, radiation protection, emergency preparedness, and security).
- 5. Listing of the total number of ARs generated annually, sorted by the above departments.
- 6. A list of ARs generated as a result of identified trends. The list should be sorted by priority and have the following information: number, title, date initiated, status, and initiating department.
- 7. A list of outstanding corrective actions, sorted by priority, with a brief description, initiating date and due date. Please also identify and list any associated due date extensions.
- 8. List of control room deficiencies and operator work-arounds, sorted by priority, with a brief description and corresponding AR and/or work order number.
- 9. A chronological list of all nuclear quality assurance audits and department/station self-assessments.
- 10. All assessments or evaluations (internal or external) regarding station or department safety-culture.
- 11. A list of all operability determinations and ODMIs performed since April 2010, with the following information: date initiated, initiating AR and status (open or closed).
- 12. A copy of all root, apparent, and common cause evaluations.
- 13. A list of maintenance preventable functional failures (MPFFs) of risk-significant systems (include actions completed and current status). A list of current Maintenance Rule a(1) systems and a list of those systems that entered a(1) within the last 2 years, but which were returned to a(2) status. Include a copy of the current system health report for those systems now in a(1).
- 14. Copy of the latest corrective action program statistics such as the number initiated by department, human performance errors by department, backlog, corrective action timeliness and others as may be available.
- 15. Any performance indicators associated with backlog of corrective maintenance items.
- 16. List of industry operating experience evaluated by the site. Additionally, list of all NRC generic communications (information notices, generic letters, etc.) evaluated by the site for applicability to the station regardless of the determination of applicability.
- 17. A list of condition reports issued since April 2010 where the NRC was the identifying organization. This list should include non-cited and minor violations, and findings, regardless of whether there was an associated violation. Please provide the AR number, title, date initiated, and status.
- 18. A chronological list of all Licensee Event Reports, with a brief description of the affected components or systems.
- 19. A chronological list of ARs, system audits, 50.59 screenings or evaluations, operability evaluations and ODMIs, maintenance rule, root or apparent cause evaluations, and permanent or temporary modifications associated with the Units 2 and 3 Low Pressure Coolant Injection systems since April 2007. Please indicate the status of the associated documents (i.e., open or closed) in the listing.
- 20. A list of open temporary modifications.
- 21. A list of the current maintenance backlog. Include the date initiated, a brief description, and a priority for each item sorted by system.
- 22. A list of the current engineering backlog. Include the date initiated, a brief description, and priority of each item.
- 23. A list of the procedural change request backlog. Include the date initiated, a brief description, and priority of each item.
Documents requested to be available as printed copies on-site during the inspection:
- b. Technical Specifications.
- c. The QA manual.
- d. A list of issues brought to the ECP/Ombudsman and the actions taken for resolution.
- e. The latest organization chart and phone listing.
- f. Self-assessments and associated condition reports generated in preparation for this inspection.
M. Pacilio The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Jamnes L. Cameron, Chief Branch 6 Division of Reactor Projects Docket Nos. 50-237, 50-249 License Nos. DPR-19, DPR-25
Enclosure:
Requested Information to Support PI&R Inspection cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\DRPIII\Dres\2012 Dresden PIR Information Request.docx X Publicly Available G Non-Publicly Available G Sensitive X Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME ROrlikowski:dtp JCameron DATE 02/16/12 02/16/12 OFFICIAL RECORD COPY
Letter to M. Pacilio from J. Cameron dated February 16, 2012.
SUBJECT:
INFORMATION REQUEST TO SUPPORT UPCOMING PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION AT DRESDEN NUCLEAR POWER STATION DISTRIBUTION:
Breeda Reilly RidsNrrDorlLpl3-2 RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Charles Casto Cynthia Pederson Jennifer Uhle Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports.Resource@nrc.gov