| number = ML13004A336 | | number = ML13004A336 | ||
| issue date = 01/04/2013 | | issue date = 01/04/2013 | ||
| title = | | title = Response to Notices of Violation, NRC Inspection Report 05000247-12-009 and 05000286-12-008 | ||
| author name = Rogge J | | author name = Rogge J | ||
| author affiliation = NRC/RGN-I/DRS/EB3 | | author affiliation = NRC/RGN-I/DRS/EB3 | ||
| addressee name = Ventosa J | | addressee name = Ventosa J | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY | {{#Wiki_filter:UNITED STATES | ||
COiIIiJIISSION | NUCLEAR REGULATORY COiIIiJIISSION | ||
REGION I 21OO RENAISSANCE | REGION I | ||
BOULEVARD, SUITE 1OO KING OF PRUSSIA. PENNSYLVANIA | 21OO RENAISSANCE BOULEVARD, SUITE 1OO | ||
KING OF PRUSSIA. PENNSYLVANIA 1940S2713 | |||
UNIT NOS. 2 AND 3 RESPONSE TO NOTICES OF VIOLATION N RC I N S p E CTr O N RE pO RT 05000247 I 20 1 2009 AN D 0500 0286t201 2008 Dear Mr. Ventosa: Thank you for your letters of September | January 4, 20L3 | ||
17,2012 (ML12268A057) | Mr. John Ventosa, Site Vice President | ||
and December 7,2012 (Ml-12354A415), in response to the Notices of Violation | Entergy Nuclear Operations, Inc. | ||
that were issued in U.S. Nuclear Regulatory | lndian Point Energy Center | ||
Commission (NRC) lnspection | 450 Broadway, GSB | ||
Report 0500A24712012009 | P.O. Box 249 | ||
and 0500028612012008, dated August 16,2012 (ML12229A128), regarding | Buchanan, NY 1051 1-0249 | ||
the use of unapproved | SUBJECT: INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 | ||
operator manual actions to mitigate safe shutdown equipment | RESPONSE TO NOTICES OF VIOLATION | ||
malfunctions | N RC I N S p E CTr O N RE pO RT 05000247 I 20 1 2009 AN D 0500 0286t201 2008 | ||
caused by fire-induced | Dear Mr. Ventosa: | ||
Thank you for your letters of September 17,2012 (ML12268A057) and December 7,2012 | |||
in Title 10 of the Code of Federal Regulations | (Ml-12354A415), in response to the Notices of Violation that were issued in U.S. Nuclear | ||
(10 CFR) Part 50 Appendix R, Section lll.G.2., Fire Areas. We reviewed your responses | Regulatory Commission (NRC) lnspection Report 0500A24712012009 and 0500028612012008, | ||
and find they meet the requirements | dated August 16,2012 (ML12229A128), regarding the use of unapproved operator manual | ||
of 10 CFR2.201, "Notice of Violation." We will review the implementation | actions to mitigate safe shutdown equipment malfunctions caused by fire-induced single | ||
of your corrective | spurious actuations in Title 10 of the Code of Federal Regulations (10 CFR) Part 50 Appendix | ||
actions during a future inspection | R, Section lll.G.2., Fire Areas. We reviewed your responses and find they meet the | ||
to determine | requirements of 10 CFR2.201, "Notice of Violation." We will review the implementation of your | ||
that full compliance | corrective actions during a future inspection to determine that full compliance has been | ||
has been achieved and will be maintained. | achieved and will be maintained. | ||
Also, in a related matter, we noted that you have included in your December 7,2012letter, a status of corrective | Also, in a related matter, we noted that you have included in your December 7,2012letter, a | ||
actions for fire-induced | status of corrective actions for fire-induced multiple spurious operation (MSO) issues. | ||
multiple spurious operation (MSO) issues.The industry resolution | The industry resolution of MSOs was described in NRC Enforcement Guidance | ||
of MSOs was described | Memorandum 09- 002, Enforcement Discretion for Fire lnduced Circuit Faults, dated May 14, | ||
in NRC Enforcement | 2009 (ML090300446). As discussed in your December 7 ,2012letter, enforcement discretion | ||
for multiple fire induced circuit fault related non-compliances ended on November 2,2012, after | |||
09- 002, Enforcement | which time, such non-compliances were to be dispositioned in accordance with the NRC | ||
Discretion | Enforcement Policy. The NRC has determined that the violations issued to Entergy on | ||
for Fire lnduced Circuit Faults, dated May 14, 2009 (ML090300446). | August 16,2012, pertaining to single spurious actuations, subsumes the MSO non-compliances | ||
As discussed | at lndian Point Units 2 and 3. Accordingly, we will also review the implementation of your MSO | ||
in your December 7 ,2012letter, enforcement | corrective actions during a future inspection to determine that these are resolved. | ||
discretion | ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | ||
for multiple fire induced circuit fault related non-compliances | available electronically for public inspection in the NRC Public Document Room or from the | ||
ended on November 2,2012, after which time, such non-compliances | |||
were to be dispositioned | J. Ventosa | ||
in accordance | Publicly Available Records (PARS) component of the NRC's document system (ADAMS). | ||
with the NRC Enforcement | ADAMS is accessible from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html | ||
Policy. The NRC has determined | (the Public Electronic Reading Room). | ||
that the violations | John F. Rogge, Chief | ||
issued to Entergy on August 16,2012, pertaining | Engineering Branch 3 | ||
to single spurious actuations, subsumes the MSO non-compliances | Division of Reactor Safety | ||
at lndian Point Units 2 and 3. Accordingly, we will also review the implementation | Docket Nos: 50-247 ,50-286 | ||
of your MSO corrective | License Nos: DPR-26. DPR-64 | ||
actions during a future inspection | cc: Distribution via ListServ | ||
to determine | |||
that these are resolved.ln accordance | |||
with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available | ML1 3004A336 | ||
electronically | X Non-Sensitive X Publicly Available | ||
for public inspection | X SUNSlReview | ||
in the NRC Public Document Room or from the | n Non-PubliclyAvailable | ||
J. Ventosa Publicly Available | n Sensitive | ||
Records (PARS) component | OFFICE RI/DRS RI/ORA RI/DRS | ||
of the NRC's document system (ADAMS).ADAMS is accessible | NAME DOrr MMclaughlin JRogge | ||
from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic | DATE 12t28112 1t2t13 1t2t13 | ||
Reading Room). | |||
J. Ventosa | |||
Branch 3 Division of Reactor Safety | Distribution w/encl: (via E-mail) | ||
W. Dean, RA | |||
D. Lew, DRA | |||
D. Roberts, DRP | |||
P. Wilson, DRP | |||
C. Miller, DRS | |||
J. Clifford, DRS | |||
License Nos: DPR-26. DPR-64 cc: Distribution | C. Santos. Rl OEDO | ||
via ListServ | M. Gray, DRP | ||
B. Bickett, DRP | |||
S. McCarver, Acting Rl | |||
A. Rao, DRP | |||
A. Ayegbusi, Acting SRI | |||
X Non-Sensitive | D. Hochmuth, AA | ||
RidsN rrPMl ndianPoint Resource | |||
OFFICE RI/DRS RI/ORA RI/DRS NAME DOrr MMclaughlin | RidsNrrDorlLpll -1 Resource | ||
ROPreport Resource | |||
J. Ventosa Distribution | D. Orr. DRS | ||
w/encl: (via E-mail)W. Dean, RA D. Lew, DRA D. Roberts, DRP P. Wilson, DRP C. Miller, DRS J. Clifford, DRS C. Santos. Rl OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, Acting Rl A. Rao, DRP A. Ayegbusi, Acting SRI D. Hochmuth, AA RidsN rrPMl ndianPoint | J. Rogge, DRS | ||
M. Mclaughlin, ORA | |||
-1 Resource ROPreport | |||
}} | }} |
Latest revision as of 16:44, 11 November 2019
ML13004A336 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 01/04/2013 |
From: | Rogge J Engineering Region 1 Branch 3 |
To: | Ventosa J Entergy Nuclear Operations |
References | |
IR-12-009, IR-12-008 | |
Download: ML13004A336 (4) | |
See also: IR 05000247/2012009
Text
UNITED STATES
NUCLEAR REGULATORY COiIIiJIISSION
REGION I
21OO RENAISSANCE BOULEVARD, SUITE 1OO
KING OF PRUSSIA. PENNSYLVANIA 1940S2713
January 4, 20L3
Mr. John Ventosa, Site Vice President
Entergy Nuclear Operations, Inc.
lndian Point Energy Center
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 1051 1-0249
SUBJECT: INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3
RESPONSE TO NOTICES OF VIOLATION
N RC I N S p E CTr O N RE pO RT 05000247 I 20 1 2009 AN D 0500 0286t201 2008
Dear Mr. Ventosa:
Thank you for your letters of September 17,2012 (ML12268A057) and December 7,2012
(Ml-12354A415), in response to the Notices of Violation that were issued in U.S. Nuclear
Regulatory Commission (NRC) lnspection Report 0500A24712012009 and 0500028612012008,
dated August 16,2012 (ML12229A128), regarding the use of unapproved operator manual
actions to mitigate safe shutdown equipment malfunctions caused by fire-induced single
spurious actuations in Title 10 of the Code of Federal Regulations (10 CFR) Part 50 Appendix
R, Section lll.G.2., Fire Areas. We reviewed your responses and find they meet the
requirements of 10 CFR2.201, "Notice of Violation." We will review the implementation of your
corrective actions during a future inspection to determine that full compliance has been
achieved and will be maintained.
Also, in a related matter, we noted that you have included in your December 7,2012letter, a
status of corrective actions for fire-induced multiple spurious operation (MSO) issues.
The industry resolution of MSOs was described in NRC Enforcement Guidance
Memorandum 09- 002, Enforcement Discretion for Fire lnduced Circuit Faults, dated May 14,
2009 (ML090300446). As discussed in your December 7 ,2012letter, enforcement discretion
for multiple fire induced circuit fault related non-compliances ended on November 2,2012, after
which time, such non-compliances were to be dispositioned in accordance with the NRC
Enforcement Policy. The NRC has determined that the violations issued to Entergy on
August 16,2012, pertaining to single spurious actuations, subsumes the MSO non-compliances
at lndian Point Units 2 and 3. Accordingly, we will also review the implementation of your MSO
corrective actions during a future inspection to determine that these are resolved.
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
J. Ventosa
Publicly Available Records (PARS) component of the NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html
(the Public Electronic Reading Room).
John F. Rogge, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos: 50-247 ,50-286
cc: Distribution via ListServ
ML1 3004A336
X Non-Sensitive X Publicly Available
X SUNSlReview
n Non-PubliclyAvailable
n Sensitive
OFFICE RI/DRS RI/ORA RI/DRS
NAME DOrr MMclaughlin JRogge
DATE 12t28112 1t2t13 1t2t13
J. Ventosa
Distribution w/encl: (via E-mail)
W. Dean, RA
D. Lew, DRA
D. Roberts, DRP
P. Wilson, DRP
C. Miller, DRS
J. Clifford, DRS
C. Santos. Rl OEDO
M. Gray, DRP
B. Bickett, DRP
S. McCarver, Acting Rl
A. Rao, DRP
A. Ayegbusi, Acting SRI
D. Hochmuth, AA
RidsN rrPMl ndianPoint Resource
RidsNrrDorlLpll -1 Resource
ROPreport Resource
D. Orr. DRS
J. Rogge, DRS
M. Mclaughlin, ORA