ML13004A336: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML13004A336
| number = ML13004A336
| issue date = 01/04/2013
| issue date = 01/04/2013
| title = Indian Point Nuclear Generating, Units 2 and 3, Response to Notices of Violation, NRC Inspection Report 05000247-12-009 and 05000286-12-008
| title = Response to Notices of Violation, NRC Inspection Report 05000247-12-009 and 05000286-12-008
| author name = Rogge J F
| author name = Rogge J
| author affiliation = NRC/RGN-I/DRS/EB3
| author affiliation = NRC/RGN-I/DRS/EB3
| addressee name = Ventosa J
| addressee name = Ventosa J
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY  
{{#Wiki_filter:UNITED STATES
COiIIiJIISSION
                                  NUCLEAR REGULATORY COiIIiJIISSION
REGION I 21OO RENAISSANCE  
                                                  REGION I
BOULEVARD, SUITE 1OO KING OF PRUSSIA. PENNSYLVANIA  
                                  21OO RENAISSANCE BOULEVARD,     SUITE 1OO
1940S2713 January 4, 20L3 Mr. John Ventosa, Site Vice President Entergy Nuclear Operations, Inc.lndian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 1051 1-0249 SUBJECT: INDIAN POINT NUCLEAR GENERATING  
                                KING OF PRUSSIA. PENNSYLVANIA 1940S2713
UNIT NOS. 2 AND 3 RESPONSE TO NOTICES OF VIOLATION N RC I N S p E CTr O N RE pO RT 05000247 I 20 1 2009 AN D 0500 0286t201 2008 Dear Mr. Ventosa: Thank you for your letters of September  
                                              January 4,   20L3
17,2012 (ML12268A057)  
Mr. John Ventosa, Site Vice President
and December 7,2012 (Ml-12354A415), in response to the Notices of Violation  
Entergy Nuclear Operations, Inc.
that were issued in U.S. Nuclear Regulatory  
lndian Point Energy Center
Commission (NRC) lnspection  
450 Broadway, GSB
Report 0500A24712012009  
P.O. Box 249
and 0500028612012008, dated August 16,2012 (ML12229A128), regarding  
Buchanan, NY 1051 1-0249
the use of unapproved  
SUBJECT:         INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3
operator manual actions to mitigate safe shutdown equipment  
                RESPONSE TO NOTICES OF VIOLATION
malfunctions  
                N RC I N S p E CTr O N RE pO RT 05000247 I 20 1 2009 AN D 0500 0286t201 2008
caused by fire-induced  
Dear Mr. Ventosa:
single spurious actuations  
Thank you for your letters of September 17,2012 (ML12268A057) and December 7,2012
in Title 10 of the Code of Federal Regulations  
(Ml-12354A415), in response to the Notices of Violation that were issued in U.S. Nuclear
(10 CFR) Part 50 Appendix R, Section lll.G.2., Fire Areas. We reviewed your responses  
Regulatory Commission (NRC) lnspection Report 0500A24712012009 and 0500028612012008,
and find they meet the requirements  
dated August 16,2012 (ML12229A128), regarding the use of unapproved operator manual
of 10 CFR2.201, "Notice of Violation." We will review the implementation  
actions to mitigate safe shutdown equipment malfunctions caused by fire-induced single
of your corrective  
spurious actuations in Title 10 of the Code of Federal Regulations (10 CFR) Part 50 Appendix
actions during a future inspection  
R, Section lll.G.2., Fire Areas. We reviewed your responses and find they meet the
to determine  
requirements of 10 CFR2.201, "Notice of Violation." We will review the implementation of your
that full compliance  
corrective actions during a future inspection to determine that full compliance has been
has been achieved and will be maintained.
achieved and will be maintained.
Also, in a related matter, we noted that you have included in your December 7,2012letter, a status of corrective  
Also, in a related matter, we noted that you have included in your December 7,2012letter, a
actions for fire-induced  
status of corrective actions for fire-induced multiple spurious operation (MSO) issues.
multiple spurious operation (MSO) issues.The industry resolution  
The industry resolution of MSOs was described in NRC Enforcement Guidance
of MSOs was described  
Memorandum 09- 002, Enforcement Discretion for Fire lnduced Circuit Faults, dated May 14,
in NRC Enforcement  
2009 (ML090300446). As discussed in your December 7 ,2012letter, enforcement discretion
Guidance Memorandum  
for multiple fire induced circuit fault related non-compliances ended on November 2,2012, after
09- 002, Enforcement  
which time, such non-compliances were to be dispositioned in accordance with the NRC
Discretion  
Enforcement Policy. The NRC has determined that the violations issued to Entergy on
for Fire lnduced Circuit Faults, dated May 14, 2009 (ML090300446).  
August 16,2012, pertaining to single spurious actuations, subsumes the MSO non-compliances
As discussed  
at lndian Point Units 2 and 3. Accordingly, we will also review the implementation of your MSO
in your December 7 ,2012letter, enforcement  
corrective actions during a future inspection to determine that these are resolved.
discretion
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
for multiple fire induced circuit fault related non-compliances  
available electronically for public inspection in the NRC Public Document Room or from the
ended on November 2,2012, after which time, such non-compliances  
 
were to be dispositioned  
J. Ventosa
in accordance  
Publicly Available Records (PARS) component of the NRC's document system (ADAMS).
with the NRC Enforcement  
ADAMS is accessible from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html
Policy. The NRC has determined  
(the Public Electronic Reading Room).
that the violations  
                                        John F. Rogge, Chief
issued to Entergy on August 16,2012, pertaining  
                                        Engineering Branch 3
to single spurious actuations, subsumes the MSO non-compliances
                                        Division of Reactor Safety
at lndian Point Units 2 and 3. Accordingly, we will also review the implementation  
Docket Nos: 50-247 ,50-286
of your MSO corrective  
License Nos: DPR-26. DPR-64
actions during a future inspection  
cc: Distribution via ListServ
to determine  
 
that these are resolved.ln accordance  
 
with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available  
ML1 3004A336
electronically  
                                      X   Non-Sensitive                         X Publicly Available
for public inspection  
  X  SUNSlReview
in the NRC Public Document Room or from the  
                                                                                  n Non-PubliclyAvailable
J. Ventosa Publicly Available  
                                      n    Sensitive
Records (PARS) component  
OFFICE         RI/DRS               RI/ORA                 RI/DRS
of the NRC's document system (ADAMS).ADAMS is accessible  
NAME           DOrr                 MMclaughlin           JRogge
from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic  
DATE           12t28112             1t2t13                 1t2t13
Reading Room).Docket Nos: 50-247 ,50-286 License Nos: DPR-26. DPR-64 cc: Distribution
                                         
via ListServ John F. Rogge, Chief Engineering  
J. Ventosa
Branch 3 Division of Reactor Safety  
Distribution w/encl: (via E-mail)
J. Ventosa Publicly Available
W. Dean, RA
Records (PARS) component
D. Lew, DRA
of the NRC's document system (ADAMS).ADAMS is accessible
D. Roberts, DRP
from the NRC Web Site at http://www.nrc.qov/reading-rm/adams.html (the Public Electronic
P. Wilson, DRP
Reading Room).Sincerely, IRAI John F. Rogge, Chief Engineering
C. Miller, DRS
Branch 3 Division of Reactor Safety Docket Nos: 50-247.50-286
J. Clifford, DRS
License Nos: DPR-26. DPR-64 cc: Distribution  
C. Santos. Rl OEDO
via ListServ DOCUMENT NAME: G:\DRS\Engineering
M. Gray, DRP
Branch 3\IPEC OMA Inspection\NOV
B. Bickett, DRP
Response Acknowledge'docx
S. McCarver, Acting Rl
ADAMS ACCESSION
A. Rao, DRP
NUMBER: ML1 3004A336 X SUNSlReview
A. Ayegbusi, Acting SRI
X Non-Sensitive
D. Hochmuth, AA
n Sensitive X Publicly Available n Non-PubliclyAvailable
RidsN rrPMl ndianPoint Resource
OFFICE RI/DRS RI/ORA RI/DRS NAME DOrr MMclaughlin
RidsNrrDorlLpll -1 Resource
JRogge DATE 12t28112 1t2t13 1t2t13 OFFICIAL RECORD COPY
ROPreport Resource
J. Ventosa Distribution  
D. Orr. DRS
w/encl: (via E-mail)W. Dean, RA D. Lew, DRA D. Roberts, DRP P. Wilson, DRP C. Miller, DRS J. Clifford, DRS C. Santos. Rl OEDO M. Gray, DRP B. Bickett, DRP S. McCarver, Acting Rl A. Rao, DRP A. Ayegbusi, Acting SRI D. Hochmuth, AA RidsN rrPMl ndianPoint  
J. Rogge, DRS
Resource RidsNrrDorlLpll  
M. Mclaughlin, ORA
-1 Resource ROPreport  
Resource D. Orr. DRS J. Rogge, DRS M. Mclaughlin, ORA
}}
}}

Latest revision as of 16:44, 11 November 2019

Response to Notices of Violation, NRC Inspection Report 05000247-12-009 and 05000286-12-008
ML13004A336
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/04/2013
From: Rogge J
Engineering Region 1 Branch 3
To: Ventosa J
Entergy Nuclear Operations
References
IR-12-009, IR-12-008
Download: ML13004A336 (4)


See also: IR 05000247/2012009

Text

UNITED STATES

NUCLEAR REGULATORY COiIIiJIISSION

REGION I

21OO RENAISSANCE BOULEVARD, SUITE 1OO

KING OF PRUSSIA. PENNSYLVANIA 1940S2713

January 4, 20L3

Mr. John Ventosa, Site Vice President

Entergy Nuclear Operations, Inc.

lndian Point Energy Center

450 Broadway, GSB

P.O. Box 249

Buchanan, NY 1051 1-0249

SUBJECT: INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3

RESPONSE TO NOTICES OF VIOLATION

N RC I N S p E CTr O N RE pO RT 05000247 I 20 1 2009 AN D 0500 0286t201 2008

Dear Mr. Ventosa:

Thank you for your letters of September 17,2012 (ML12268A057) and December 7,2012

(Ml-12354A415), in response to the Notices of Violation that were issued in U.S. Nuclear

Regulatory Commission (NRC) lnspection Report 0500A24712012009 and 0500028612012008,

dated August 16,2012 (ML12229A128), regarding the use of unapproved operator manual

actions to mitigate safe shutdown equipment malfunctions caused by fire-induced single

spurious actuations in Title 10 of the Code of Federal Regulations (10 CFR) Part 50 Appendix

R, Section lll.G.2., Fire Areas. We reviewed your responses and find they meet the

requirements of 10 CFR2.201, "Notice of Violation." We will review the implementation of your

corrective actions during a future inspection to determine that full compliance has been

achieved and will be maintained.

Also, in a related matter, we noted that you have included in your December 7,2012letter, a

status of corrective actions for fire-induced multiple spurious operation (MSO) issues.

The industry resolution of MSOs was described in NRC Enforcement Guidance

Memorandum 09- 002, Enforcement Discretion for Fire lnduced Circuit Faults, dated May 14,

2009 (ML090300446). As discussed in your December 7 ,2012letter, enforcement discretion

for multiple fire induced circuit fault related non-compliances ended on November 2,2012, after

which time, such non-compliances were to be dispositioned in accordance with the NRC

Enforcement Policy. The NRC has determined that the violations issued to Entergy on

August 16,2012, pertaining to single spurious actuations, subsumes the MSO non-compliances

at lndian Point Units 2 and 3. Accordingly, we will also review the implementation of your MSO

corrective actions during a future inspection to determine that these are resolved.

ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

J. Ventosa

Publicly Available Records (PARS) component of the NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html

(the Public Electronic Reading Room).

John F. Rogge, Chief

Engineering Branch 3

Division of Reactor Safety

Docket Nos: 50-247 ,50-286

License Nos: DPR-26. DPR-64

cc: Distribution via ListServ

ML1 3004A336

X Non-Sensitive X Publicly Available

X SUNSlReview

n Non-PubliclyAvailable

n Sensitive

OFFICE RI/DRS RI/ORA RI/DRS

NAME DOrr MMclaughlin JRogge

DATE 12t28112 1t2t13 1t2t13

J. Ventosa

Distribution w/encl: (via E-mail)

W. Dean, RA

D. Lew, DRA

D. Roberts, DRP

P. Wilson, DRP

C. Miller, DRS

J. Clifford, DRS

C. Santos. Rl OEDO

M. Gray, DRP

B. Bickett, DRP

S. McCarver, Acting Rl

A. Rao, DRP

A. Ayegbusi, Acting SRI

D. Hochmuth, AA

RidsN rrPMl ndianPoint Resource

RidsNrrDorlLpll -1 Resource

ROPreport Resource

D. Orr. DRS

J. Rogge, DRS

M. Mclaughlin, ORA