Text
UNITED STATES
NUCLEAR REGULATORY COiIIiJIISSION
REGION I
21OO RENAISSANCE BOULEVARD, SUITE 1OO
KING OF PRUSSIA. PENNSYLVANIA 1940S2713
January 4, 20L3
Mr. John Ventosa, Site Vice President
Entergy Nuclear Operations, Inc.
lndian Point Energy Center
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 1051 1-0249
SUBJECT: INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3
RESPONSE TO NOTICES OF VIOLATION
N RC I N S p E CTr O N RE pO RT 05000247 I 20 1 2009 AN D 0500 0286t201 2008
Dear Mr. Ventosa:
Thank you for your letters of September 17,2012 (ML12268A057) and December 7,2012
(Ml-12354A415), in response to the Notices of Violation that were issued in U.S. Nuclear
Regulatory Commission (NRC) lnspection Report 0500A24712012009 and 0500028612012008,
dated August 16,2012 (ML12229A128), regarding the use of unapproved operator manual
actions to mitigate safe shutdown equipment malfunctions caused by fire-induced single
spurious actuations in Title 10 of the Code of Federal Regulations (10 CFR) Part 50 Appendix
R, Section lll.G.2., Fire Areas. We reviewed your responses and find they meet the
requirements of 10 CFR2.201, "Notice of Violation." We will review the implementation of your
corrective actions during a future inspection to determine that full compliance has been
achieved and will be maintained.
Also, in a related matter, we noted that you have included in your December 7,2012letter, a
status of corrective actions for fire-induced multiple spurious operation (MSO) issues.
The industry resolution of MSOs was described in NRC Enforcement Guidance
Memorandum 09- 002, Enforcement Discretion for Fire lnduced Circuit Faults, dated May 14,
2009 (ML090300446). As discussed in your December 7 ,2012letter, enforcement discretion
for multiple fire induced circuit fault related non-compliances ended on November 2,2012, after
which time, such non-compliances were to be dispositioned in accordance with the NRC
Enforcement Policy. The NRC has determined that the violations issued to Entergy on
August 16,2012, pertaining to single spurious actuations, subsumes the MSO non-compliances
at lndian Point Units 2 and 3. Accordingly, we will also review the implementation of your MSO
corrective actions during a future inspection to determine that these are resolved.
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
J. Ventosa
Publicly Available Records (PARS) component of the NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html
(the Public Electronic Reading Room).
Docket Nos: 50-247 ,50-286
cc: Distribution via ListServ
John F. Rogge, Chief
Engineering Branch 3
Division of Reactor Safety
ML1 3004A336
X SUNSlReview
X
Non-Sensitive
n
Sensitive
X
Publicly Available
n
Non-PubliclyAvailable
OFFICE
RI/DRS
RI/ORA
RI/DRS
NAME
DOrr
MMclaughlin
JRogge
DATE
12t28112
1t2t13
1t2t13
J. Ventosa
Distribution w/encl: (via E-mail)
W. Dean, RA
D. Lew, DRA
D. Roberts, DRP
P. Wilson, DRP
C. Miller, DRS
J. Clifford, DRS
C. Santos. Rl OEDO
M. Gray, DRP
B. Bickett, DRP
S. McCarver, Acting Rl
A. Rao, DRP
A. Ayegbusi, Acting SRI
D. Hochmuth, AA
RidsN rrPMl ndianPoint Resource
RidsNrrDorlLpll -1 Resource
ROPreport Resource
D. Orr. DRS
J. Rogge, DRS
M. Mclaughlin, ORA