| | number = ML13004A336 | | | number = ML13004A336 |
| | issue date = 01/04/2013 | | | issue date = 01/04/2013 |
| | title = Indian Point Nuclear Generating, Units 2 and 3, Response to Notices of Violation, NRC Inspection Report 05000247-12-009 and 05000286-12-008 | | | title = Response to Notices of Violation, NRC Inspection Report 05000247-12-009 and 05000286-12-008 |
| | author name = Rogge J F | | | author name = Rogge J |
| | author affiliation = NRC/RGN-I/DRS/EB3 | | | author affiliation = NRC/RGN-I/DRS/EB3 |
| | addressee name = Ventosa J | | | addressee name = Ventosa J |
Line 17: |
Line 17: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATESNUCLEAR REGULATORY COiIIiJIISSIONREGION I21OO RENAISSANCE BOULEVARD, SUITE 1OOKING OF PRUSSIA. PENNSYLVANIA 1940S2713January 4, 20L3Mr. John Ventosa, Site Vice PresidentEntergy Nuclear Operations, Inc.lndian Point Energy Center450 Broadway, GSBP.O. Box 249Buchanan, NY 1051 1-0249 | | {{#Wiki_filter:UNITED STATES |
| | NUCLEAR REGULATORY COiIIiJIISSION |
| | REGION I |
| | 21OO RENAISSANCE BOULEVARD, SUITE 1OO |
| | KING OF PRUSSIA. PENNSYLVANIA 1940S2713 |
| | January 4, 20L3 |
| | Mr. John Ventosa, Site Vice President |
| | Entergy Nuclear Operations, Inc. |
| | lndian Point Energy Center |
| | 450 Broadway, GSB |
| | P.O. Box 249 |
| | Buchanan, NY 1051 1-0249 |
| | SUBJECT: INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3 |
| | RESPONSE TO NOTICES OF VIOLATION |
| | N RC I N S p E CTr O N RE pO RT 05000247 I 20 1 2009 AN D 0500 0286t201 2008 |
| | Dear Mr. Ventosa: |
| | Thank you for your letters of September 17,2012 (ML12268A057) and December 7,2012 |
| | (Ml-12354A415), in response to the Notices of Violation that were issued in U.S. Nuclear |
| | Regulatory Commission (NRC) lnspection Report 0500A24712012009 and 0500028612012008, |
| | dated August 16,2012 (ML12229A128), regarding the use of unapproved operator manual |
| | actions to mitigate safe shutdown equipment malfunctions caused by fire-induced single |
| | spurious actuations in Title 10 of the Code of Federal Regulations (10 CFR) Part 50 Appendix |
| | R, Section lll.G.2., Fire Areas. We reviewed your responses and find they meet the |
| | requirements of 10 CFR2.201, "Notice of Violation." We will review the implementation of your |
| | corrective actions during a future inspection to determine that full compliance has been |
| | achieved and will be maintained. |
| | Also, in a related matter, we noted that you have included in your December 7,2012letter, a |
| | status of corrective actions for fire-induced multiple spurious operation (MSO) issues. |
| | The industry resolution of MSOs was described in NRC Enforcement Guidance |
| | Memorandum 09- 002, Enforcement Discretion for Fire lnduced Circuit Faults, dated May 14, |
| | 2009 (ML090300446). As discussed in your December 7 ,2012letter, enforcement discretion |
| | for multiple fire induced circuit fault related non-compliances ended on November 2,2012, after |
| | which time, such non-compliances were to be dispositioned in accordance with the NRC |
| | Enforcement Policy. The NRC has determined that the violations issued to Entergy on |
| | August 16,2012, pertaining to single spurious actuations, subsumes the MSO non-compliances |
| | at lndian Point Units 2 and 3. Accordingly, we will also review the implementation of your MSO |
| | corrective actions during a future inspection to determine that these are resolved. |
| | ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be |
| | available electronically for public inspection in the NRC Public Document Room or from the |
|
| |
|
| SUBJECT: INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3RESPONSE TO NOTICES OF VIOLATIONN RC I N S p E CTr O N RE pO RT 05000247 I 20 1 2009 AN D 0500 0286t201 2008
| | J. Ventosa |
| | Publicly Available Records (PARS) component of the NRC's document system (ADAMS). |
| | ADAMS is accessible from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html |
| | (the Public Electronic Reading Room). |
| | John F. Rogge, Chief |
| | Engineering Branch 3 |
| | Division of Reactor Safety |
| | Docket Nos: 50-247 ,50-286 |
| | License Nos: DPR-26. DPR-64 |
| | cc: Distribution via ListServ |
|
| |
|
| ==Dear Mr. Ventosa:==
| |
| Thank you for your letters of September 17,2012 (ML12268A057) and December 7,2012(Ml-12354A415), in response to the Notices of Violation that were issued in U.S. NuclearRegulatory Commission (NRC) lnspection Report 0500A24712012009 and 0500028612012008,dated August 16,2012 (ML12229A128), regarding the use of unapproved operator manualactions to mitigate safe shutdown equipment malfunctions caused by fire-induced singlespurious actuations in Title 10 of the Code of Federal Regulations (10 CFR) Part 50 AppendixR, Section lll.G.2., Fire Areas. We reviewed your responses and find they meet therequirements of 10 CFR2.201, "Notice of Violation." We will review the implementation of yourcorrective actions during a future inspection to determine that full compliance has beenachieved and will be maintained.Also, in a related matter, we noted that you have included in your December 7,2012letter, astatus of corrective actions for fire-induced multiple spurious operation (MSO) issues.The industry resolution of MSOs was described in NRC Enforcement GuidanceMemorandum 09- 002, Enforcement Discretion for Fire lnduced Circuit Faults, dated May 14,2009 (ML090300446). As discussed in your December 7 ,2012letter, enforcement discretionfor multiple fire induced circuit fault related non-compliances ended on November 2,2012, afterwhich time, such non-compliances were to be dispositioned in accordance with the NRCEnforcement Policy. The NRC has determined that the violations issued to Entergy onAugust 16,2012, pertaining to single spurious actuations, subsumes the MSO non-compliancesat lndian Point Units 2 and 3. Accordingly, we will also review the implementation of your MSOcorrective actions during a future inspection to determine that these are resolved.ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the J. VentosaPublicly Available Records (PARS) component of the NRC's document system (ADAMS).ADAMS is accessible from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html(the Public Electronic Reading Room).Docket Nos: 50-247 ,50-286License Nos: DPR-26. DPR-64cc: Distribution via ListServJohn F. Rogge, ChiefEngineering Branch 3Division of Reactor Safety J. VentosaPublicly Available Records (PARS) component of the NRC's document system (ADAMS).ADAMS is accessible from the NRC Web Site at http://www.nrc.qov/reading-rm/adams.html(the Public Electronic Reading Room).
| |
|
| |
|
| Sincerely,IRAIJohn F. Rogge, ChiefEngineering Branch 3Division of Reactor SafetyDocket Nos: 50-247.50-286License Nos: DPR-26. DPR-64cc: Distribution via ListServDOCUMENT NAME: G:\DRS\Engineering Branch 3\IPEC OMA Inspection\NOV Response Acknowledge'docxADAMS ACCESSION NUMBER: ML1 3004A336X SUNSlReviewX Non-Sensitiven SensitiveX Publicly Availablen Non-PubliclyAvailableOFFICERI/DRSRI/ORARI/DRSNAMEDOrrMMclaughlinJRoggeDATE12t281121t2t131t2t13OFFICIAL RECORD COPY J. VentosaDistribution w/encl: (via E-mail)W. Dean, RAD. Lew, DRAD. Roberts, DRPP. Wilson, DRPC. Miller, DRSJ. Clifford, DRSC. Santos. Rl OEDOM. Gray, DRPB. Bickett, DRPS. McCarver, Acting RlA. Rao, DRPA. Ayegbusi, Acting SRID. Hochmuth, AARidsN rrPMl ndianPoint ResourceRidsNrrDorlLpll -1 ResourceROPreport ResourceD. Orr. DRSJ. Rogge, DRSM. Mclaughlin, ORA
| | ML1 3004A336 |
| | X Non-Sensitive X Publicly Available |
| | X SUNSlReview |
| | n Non-PubliclyAvailable |
| | n Sensitive |
| | OFFICE RI/DRS RI/ORA RI/DRS |
| | NAME DOrr MMclaughlin JRogge |
| | DATE 12t28112 1t2t13 1t2t13 |
| | |
| | J. Ventosa |
| | Distribution w/encl: (via E-mail) |
| | W. Dean, RA |
| | D. Lew, DRA |
| | D. Roberts, DRP |
| | P. Wilson, DRP |
| | C. Miller, DRS |
| | J. Clifford, DRS |
| | C. Santos. Rl OEDO |
| | M. Gray, DRP |
| | B. Bickett, DRP |
| | S. McCarver, Acting Rl |
| | A. Rao, DRP |
| | A. Ayegbusi, Acting SRI |
| | D. Hochmuth, AA |
| | RidsN rrPMl ndianPoint Resource |
| | RidsNrrDorlLpll -1 Resource |
| | ROPreport Resource |
| | D. Orr. DRS |
| | J. Rogge, DRS |
| | M. Mclaughlin, ORA |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 and 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] |
See also: IR 05000247/2012009
Text
UNITED STATES
NUCLEAR REGULATORY COiIIiJIISSION
REGION I
21OO RENAISSANCE BOULEVARD, SUITE 1OO
KING OF PRUSSIA. PENNSYLVANIA 1940S2713
January 4, 20L3
Mr. John Ventosa, Site Vice President
Entergy Nuclear Operations, Inc.
lndian Point Energy Center
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 1051 1-0249
SUBJECT: INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 AND 3
RESPONSE TO NOTICES OF VIOLATION
N RC I N S p E CTr O N RE pO RT 05000247 I 20 1 2009 AN D 0500 0286t201 2008
Dear Mr. Ventosa:
Thank you for your letters of September 17,2012 (ML12268A057) and December 7,2012
(Ml-12354A415), in response to the Notices of Violation that were issued in U.S. Nuclear
Regulatory Commission (NRC) lnspection Report 0500A24712012009 and 0500028612012008,
dated August 16,2012 (ML12229A128), regarding the use of unapproved operator manual
actions to mitigate safe shutdown equipment malfunctions caused by fire-induced single
spurious actuations in Title 10 of the Code of Federal Regulations (10 CFR) Part 50 Appendix
R, Section lll.G.2., Fire Areas. We reviewed your responses and find they meet the
requirements of 10 CFR2.201, "Notice of Violation." We will review the implementation of your
corrective actions during a future inspection to determine that full compliance has been
achieved and will be maintained.
Also, in a related matter, we noted that you have included in your December 7,2012letter, a
status of corrective actions for fire-induced multiple spurious operation (MSO) issues.
The industry resolution of MSOs was described in NRC Enforcement Guidance
Memorandum 09- 002, Enforcement Discretion for Fire lnduced Circuit Faults, dated May 14,
2009 (ML090300446). As discussed in your December 7 ,2012letter, enforcement discretion
for multiple fire induced circuit fault related non-compliances ended on November 2,2012, after
which time, such non-compliances were to be dispositioned in accordance with the NRC
Enforcement Policy. The NRC has determined that the violations issued to Entergy on
August 16,2012, pertaining to single spurious actuations, subsumes the MSO non-compliances
at lndian Point Units 2 and 3. Accordingly, we will also review the implementation of your MSO
corrective actions during a future inspection to determine that these are resolved.
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the
J. Ventosa
Publicly Available Records (PARS) component of the NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web Site at http://www.nrc.qov/readinq-rm/adams.html
(the Public Electronic Reading Room).
John F. Rogge, Chief
Engineering Branch 3
Division of Reactor Safety
Docket Nos: 50-247 ,50-286
License Nos: DPR-26. DPR-64
cc: Distribution via ListServ
ML1 3004A336
X Non-Sensitive X Publicly Available
X SUNSlReview
n Non-PubliclyAvailable
n Sensitive
OFFICE RI/DRS RI/ORA RI/DRS
NAME DOrr MMclaughlin JRogge
DATE 12t28112 1t2t13 1t2t13
J. Ventosa
Distribution w/encl: (via E-mail)
W. Dean, RA
D. Lew, DRA
D. Roberts, DRP
P. Wilson, DRP
C. Miller, DRS
J. Clifford, DRS
C. Santos. Rl OEDO
M. Gray, DRP
B. Bickett, DRP
S. McCarver, Acting Rl
A. Rao, DRP
A. Ayegbusi, Acting SRI
D. Hochmuth, AA
RidsN rrPMl ndianPoint Resource
RidsNrrDorlLpll -1 Resource
ROPreport Resource
D. Orr. DRS
J. Rogge, DRS
M. Mclaughlin, ORA