ML13072A678: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:MN No. 13-005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING  
{{#Wiki_filter:MN No. 13-005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 13, 2013 Licensee:             Entergy Nuclear Operations, Inc.
 
Facility:             Pilgrim Nuclear Power Station Docket No:           50-293 Date/Time:           Tuesday, April 2, 2013 5:00 p.m. to 6:30 p.m Location:             Plymouth Town Hall 11 Lincoln Street Plymouth, MA 02360 Purpose:             The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRCs assessment of safety performance at Pilgrim for 2012, as described in the annual assessment letter dated March 5, 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.
March 13, 2013  
NRC Attendees:       R. Bellamy, Chief, Division of Reactor Projects, Branch 5 M. Schneider, Senior Resident Inspector T. Setzer, Senior Project Engineer B. Smith, Resident Inspector S. Campbell, Office Assistant Public Participation: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss Entergys performance at Pilgrim Nuclear Power Station during calendar year 2012. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Pilgrim.
 
Meeting Contact:     Ronald R. Bellamy Ph.D., Chief, Projects Branch 5 610-337-5200 E-mail: Ronald.Bellamy@nrc.gov The NRCs annual assessment letter regarding Pilgrim performance during 2012 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML13060A340. ADAMS is accessible from the NRC website at:
Licensee: Entergy Nuclear Operations, Inc.
 
Facility:   Pilgrim Nuclear Power Station  
 
Docket No: 50-293  
 
Date/Time: Tuesday, April 2, 2013   5:00 p.m. to 6:30 p.m  
 
Location: Plymouth Town Hall 11 Lincoln Street Plymouth, MA 02360  
 
Purpose: The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Pilgrim for 2012, as described in the annual assessment letter dated March 5, 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.
NRC Attendees: R. Bellamy, Chief, Division of Reactor Projects, Branch 5 M. Schneider, Senior Resident Inspector T. Setzer, Senior Project Engineer B. Smith, Resident Inspector S. Campbell, Office Assistant  
 
Public Participation: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss Entergy's  performance at Pilgrim Nuclear Power Station during calendar year 2012. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Pilgrim.
Meeting Contact: Ronald R. Bellamy Ph.D., Chief, Projects Branch 5 610-337-5200 E-mail: Ronald.Bellamy@nrc.gov The NRC's annual assessment letter regarding P ilgrim performance during 2012 can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML13060A340. ADAMS is accessible from the NRC website at:
http://www.nrc.gov/reading-rm/adams.html.
http://www.nrc.gov/reading-rm/adams.html.
2  Additional information relative to the NRC' s annual assessment process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's website at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html , and contains information regarding visitors and security. 
The NRC provides reasonable accommodation to indivi duals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinat ions on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by other NRC personnel at this meeting should be made known by March 26, 2013, via telephone to the NRC meeting contact.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances. Please confirm the meeting schedule on the NRC website under public meetings.


            /RA Steven Shaffer Acting for/     Approved by:             Ronald R. Bellamy Ph.D., Chief       Projects Branch 5       Division of Reactor Projects cc: Distribution via ListServ  
2 Additional information relative to the NRCs annual assessment process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRCs website at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by other NRC personnel at this meeting should be made known by March 26, 2013, via telephone to the NRC meeting contact.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
Please confirm the meeting schedule on the NRC website under public meetings.
                                              /RA Steven Shaffer Acting for/
Approved by:
Ronald R. Bellamy Ph.D., Chief Projects Branch 5 Division of Reactor Projects cc: Distribution via ListServ


ML13072A678 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP   NAME SShaffer/ SS RBellamy/SS for   DATE 03/ 13/13 03/13/13}}
ML13072A678 Non-Sensitive                             Publicly Available SUNSI Review Sensitive                                Non-Publicly Available OFFICE           RI/DRP             RI/DRP NAME             SShaffer/ SS       RBellamy/SS for DATE             03/ 13/13           03/13/13}}

Revision as of 20:49, 4 November 2019

Notice of Public Meeting, April 2, 2013
ML13072A678
Person / Time
Site: Pilgrim
Issue date: 03/13/2013
From: Bellamy R
NRC/RGN-I/DRP/PB5
To:
BELLAMY, RR
References
MN 13-005
Download: ML13072A678 (3)


Text

MN No.13-005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 13, 2013 Licensee: Entergy Nuclear Operations, Inc.

Facility: Pilgrim Nuclear Power Station Docket No: 50-293 Date/Time: Tuesday, April 2, 2013 5:00 p.m. to 6:30 p.m Location: Plymouth Town Hall 11 Lincoln Street Plymouth, MA 02360 Purpose: The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRCs assessment of safety performance at Pilgrim for 2012, as described in the annual assessment letter dated March 5, 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.

NRC Attendees: R. Bellamy, Chief, Division of Reactor Projects, Branch 5 M. Schneider, Senior Resident Inspector T. Setzer, Senior Project Engineer B. Smith, Resident Inspector S. Campbell, Office Assistant Public Participation: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss Entergys performance at Pilgrim Nuclear Power Station during calendar year 2012. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Pilgrim.

Meeting Contact: Ronald R. Bellamy Ph.D., Chief, Projects Branch 5 610-337-5200 E-mail: Ronald.Bellamy@nrc.gov The NRCs annual assessment letter regarding Pilgrim performance during 2012 can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession Number ML13060A340. ADAMS is accessible from the NRC website at:

http://www.nrc.gov/reading-rm/adams.html.

2 Additional information relative to the NRCs annual assessment process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRCs website at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by March 26, 2013, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

/RA Steven Shaffer Acting for/

Approved by:

Ronald R. Bellamy Ph.D., Chief Projects Branch 5 Division of Reactor Projects cc: Distribution via ListServ

ML13072A678 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SShaffer/ SS RBellamy/SS for DATE 03/ 13/13 03/13/13