IR 05000458/2013406: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML13276A836 | | number = ML13276A836 | ||
| issue date = 09/30/2013 | | issue date = 09/30/2013 | ||
| title = | | title = Temporary Instruction 2515/186, Inspection of Procedures and Process for Responding to Potential Aircraft Threats, Inspection Report Number 05000458/2013406 | ||
| author name = Gaddy V | | author name = Gaddy V | ||
| author affiliation = NRC/RGN-IV/DRS | | author affiliation = NRC/RGN-IV/DRS | ||
| addressee name = Olson E | | addressee name = Olson E | ||
| addressee affiliation = Entergy Operations, Inc | | addressee affiliation = Entergy Operations, Inc | ||
| docket = 05000458 | | docket = 05000458 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ber 30, 2013 | ||
SUBJECT: RIVER BEND STATION - TEMPORARY INSTRUCTION 2515/186, "INSPECTION OF PROCEDURES AND PROCESS FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS," INSPECTION REPORT NUMBER 05000458/2013406 | ==SUBJECT:== | ||
RIVER BEND STATION - TEMPORARY INSTRUCTION 2515/186, | |||
"INSPECTION OF PROCEDURES AND PROCESS FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS," INSPECTION REPORT NUMBER 05000458/2013406 | |||
==Dear Mr. Olson:== | ==Dear Mr. Olson:== | ||
On September 5, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Waterford Steam Electric Station, Unit 3, using Temporary Instruction 2515/186, | On September 5, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Waterford Steam Electric Station, Unit 3, using Temporary Instruction 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. The enclosed inspection report documents the results of the inspection, which were preliminarily discussed on June 5, 2013, with you and other members of your staff. After discussing the results with the Office of Nuclear Security and Incident Response (NSIR) and the Office of Nuclear Reactor Regulation (NRR), | ||
an exit meeting was conducted via telephone on September 5, 2013. | an exit meeting was conducted via telephone on September 5, 2013. | ||
The objective of this inspection was to assess the implementation procedures and processes of River Bend Station, that are required by Title 10 of the Code of Federal Regulations (CFR) 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States, will be used to evaluate the U.S. nuclear | The objective of this inspection was to assess the implementation procedures and processes of River Bend Station, that are required by Title 10 of the Code of Federal Regulations (CFR) 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States, will be used to evaluate the U.S. nuclear industrys readiness to safely respond to similar events. | ||
The inspection examined activities conducted under your license as they relate to the implementation of 10 CFR 50.54(hh)(1), your compliance with the | These results will also help the NRC to determine if additional regulatory actions are warranted. | ||
The inspection examined activities conducted under your license as they relate to the implementation of 10 CFR 50.54(hh)(1), your compliance with the Commissions rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. Based on results of this inspection, no NRC-identified or self-revealing findings were identified. | |||
However, three observations were identified by the inspectors for your future consideration. | |||
The observations were of very low safety significance and were determined not to be violations of regulatory requirements. | The observations were of very low safety significance and were determined not to be violations of regulatory requirements. | ||
Line 34: | Line 40: | ||
If you contest any finding or the subject in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Grand Gulf Nuclear Station. | If you contest any finding or the subject in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Grand Gulf Nuclear Station. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). | ||
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | ||
Line 40: | Line 46: | ||
Should you have any questions regarding this inspection, we will be pleased to discuss the issues with you. | Should you have any questions regarding this inspection, we will be pleased to discuss the issues with you. | ||
Sincerely,/RA/ | Sincerely, | ||
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-458 License No. NPF-47 | /RA/ | ||
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-458 License No. NPF-47 Nonpublic Enclosure: | |||
Nonpublic | Inspection Report 05000458/2013406; w/Attachment: Supplemental Information ADAMS ACCESSION NUMBER: ML13276A836 Cover Letter Only Non Sensitive Publicly Available VGG SUNSI Review Complete Sensitive Non-Publicly Available Entire Report Non Sensitive Publicly Available Keyword: Sensitive Non-Publicly Available VGG MD 3.4 Non-Public A.3 OE:OB OE:OB C:PBC C:OB SHedger DStrickland JQuichocho VGaddy | ||
/RA/ /RA/ /RA/ /RA/ | |||
9/25/2013 9/26/2013 9/26/2013 9/30/2013 | |||
Inspection Report 05000458/2013406; | |||
Supplemental Information Cover Letter Only Non Sensitive Publicly Available VGG SUNSI Review Complete Sensitive Non-Publicly Available Entire Report Non Sensitive Publicly Available Keyword: MD 3.4 Non-Public A.3 | |||
}} | }} |
Latest revision as of 12:53, 4 November 2019
ML13276A836 | |
Person / Time | |
---|---|
Site: | River Bend |
Issue date: | 09/30/2013 |
From: | Vincent Gaddy Division of Reactor Safety IV |
To: | Olson E Entergy Operations |
References | |
IR-13-406 | |
Download: ML13276A836 (3) | |
Text
UNITE D S TATE S NUC LEAR RE GULATOR Y C OMMI S SI ON ber 30, 2013
SUBJECT:
RIVER BEND STATION - TEMPORARY INSTRUCTION 2515/186,
"INSPECTION OF PROCEDURES AND PROCESS FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS," INSPECTION REPORT NUMBER 05000458/2013406
Dear Mr. Olson:
On September 5, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Waterford Steam Electric Station, Unit 3, using Temporary Instruction 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. The enclosed inspection report documents the results of the inspection, which were preliminarily discussed on June 5, 2013, with you and other members of your staff. After discussing the results with the Office of Nuclear Security and Incident Response (NSIR) and the Office of Nuclear Reactor Regulation (NRR),
an exit meeting was conducted via telephone on September 5, 2013.
The objective of this inspection was to assess the implementation procedures and processes of River Bend Station, that are required by Title 10 of the Code of Federal Regulations (CFR) 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States, will be used to evaluate the U.S. nuclear industrys readiness to safely respond to similar events.
These results will also help the NRC to determine if additional regulatory actions are warranted.
The inspection examined activities conducted under your license as they relate to the implementation of 10 CFR 50.54(hh)(1), your compliance with the Commissions rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. Based on results of this inspection, no NRC-identified or self-revealing findings were identified.
However, three observations were identified by the inspectors for your future consideration.
The observations were of very low safety significance and were determined not to be violations of regulatory requirements.
If you contest any finding or the subject in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at Grand Gulf Nuclear Station.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Should you have any questions regarding this inspection, we will be pleased to discuss the issues with you.
Sincerely,
/RA/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-458 License No. NPF-47 Nonpublic Enclosure:
Inspection Report 05000458/2013406; w/Attachment: Supplemental Information ADAMS ACCESSION NUMBER: ML13276A836 Cover Letter Only Non Sensitive Publicly Available VGG SUNSI Review Complete Sensitive Non-Publicly Available Entire Report Non Sensitive Publicly Available Keyword: Sensitive Non-Publicly Available VGG MD 3.4 Non-Public A.3 OE:OB OE:OB C:PBC C:OB SHedger DStrickland JQuichocho VGaddy
/RA/ /RA/ /RA/ /RA/
9/25/2013 9/26/2013 9/26/2013 9/30/2013