|
|
(3 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 11/07/2013 | | | issue date = 11/07/2013 |
| | title = September 4, 2013, NRC Generic Fundamentals Examination Results for FitzPatrick Power Plant (Cover Letter) | | | title = September 4, 2013, NRC Generic Fundamentals Examination Results for FitzPatrick Power Plant (Cover Letter) |
| | author name = Jackson D E | | | author name = Jackson D |
| | author affiliation = NRC/RGN-I/DRS/OB | | | author affiliation = NRC/RGN-I/DRS/OB |
| | addressee name = Laing D | | | addressee name = Laing D |
Line 9: |
Line 9: |
| | docket = 05000333 | | | docket = 05000333 |
| | license number = DPR-059 | | | license number = DPR-059 |
| | contact person = Jackson D E | | | contact person = Jackson D |
| | package number = ML13108A011 | | | package number = ML13108A011 |
| | document type = Letter, License-Operator, Part 55 Examination Related Material | | | document type = Letter, License-Operator, Part 55 Examination Related Material |
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 November 7, 2013 Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093 |
| | |
| November 7, 2013 | |
| | |
| Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD (FROM PUBLIC) | | SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD (FROM PUBLIC) |
|
| |
|
| ==Dear Mr. Laing:== | | ==Dear Mr. Laing:== |
|
| |
|
| On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. | | On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. |
| | | A copy of the BWR GFE and the answer key are available for your review on the NRCs website approximately 60 days following the examination administration date at: |
| A copy of the BWR GFE and the answer key are available for your review on the NRC's website approximately 60 days following the examination administration date at: | | http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html. |
| http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html | | If you have any questions concerning the examination, please contact me at 610-337-5306. |
| . If you have any questions concerning the examination, please contact me at 610-337-5306.
| | Sincerely, |
| Sincerely, | | /RA/ |
| | | Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-333 |
| /RA/ Donald E. Jackson, Chief
| |
| | |
| Operations Branch | |
| | |
| Division of Reactor Safety Docket No. 50-333 | |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| (Non-Public):
| | (Non-Public): |
| September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets | | September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets cc: w/o enclosures via ListServ |
|
| |
|
| cc: w/o enclosures via ListServ November 7, 2013
| | November 7, 2013 Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093 |
| | |
| Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant | |
| | |
| 268 Lake Road Lycoming, NY 13093 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC) | | SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC) |
|
| |
|
| ==Dear Mr. Laing:== | | ==Dear Mr. Laing:== |
|
| |
|
| On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. | | On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. |
| | | A copy of the BWR GFE and the answer key are available for your review on the NRCs website approximately 60 days following the examination administration date at: |
| A copy of the BWR GFE and the answer key are available for your review on the NRC's website approximately 60 days following the examination administration date at: | | http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html. |
| http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html | | If you have any questions concerning the examination, please contact me at 610-337-5306. |
| . If you have any questions concerning the examination, please contact me at 610-337-5306.
| | Sincerely, |
| | | /RA/ |
| Sincerely, | | Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-333 |
| | |
| /RA/ Donald E. Jackson, Chief Operations Branch | |
| | |
| Division of Reactor Safety Docket No. 50-333 | |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| (Non-Public): September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets cc w/o enclosures via ListServ
| | (Non-Public): |
| | | September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets cc w/o enclosures via ListServ DOCUMENT NAME: G:\DRS\Operations Branch\GFE\2013\FP09-04-GFE ResultsLtr.docx ADAMS PACKAGE NO.: ML13108A011 ADAMS NO.: ML13312A206 Non-Sensitive Publicly Available SUNSI Review Sensitive OFFICE RI/DRS/OB RI/DRS/OB NAME CBixler/CB DEJackson/DJ DATE 11/07/13 11/07/13 OFFICIAL RECORD COPY}} |
| DOCUMENT NAME: G:\DRS\Operations Branch\GFE\2013\FP09-04-GFE ResultsLtr.docx ADAMS PACKAGE NO.: ML13108A011 ADAMS NO.: ML13312A206 SUNSI Review Non-Sensitive Sensitive Publicly Available OFFICE RI/DRS/OB RI/DRS/OB NAME CBixler/CB DEJackson/DJ DATE 11/07/13 11/07/13 OFFICIAL RECORD COPY}} | |
|
---|
Category:Letter
MONTHYEARML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML24282B0302024-10-11011 October 2024 Project Manager Assignment RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing JAFP-24-0051, Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-0882024-10-0303 October 2024 Reply to Preliminary White Finding and Apparent Violation in NRC Inspection Report 05000333/2024011; EA-24-088 ML24270A0742024-09-30030 September 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, & Opportunity for a Hearing (EPID L-2024-LLA-0134) - LTR ML24270A1452024-09-26026 September 2024 Notice of Enforcement Discretion for James A. Fitzpatrick Nuclear Power Plant JAFP-24-0046, Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation2024-09-25025 September 2024 Request for Enforcement Discretion for Technical Specification (TS) 3.3.2.1 Control Rod Block Instrumentation JAFP-24-0047, License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software2024-09-25025 September 2024 License Amendment Request – Temporary Addition to TS 3.3.2.1 Condition C, Control Rod Block Instrumentation to Support Upgrade to Rod Worth Minimizer Software JAFP-24-0045, Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications2024-09-20020 September 2024 Supplemental Information for License Amendment Request to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4, and Administrative Changes to the Technical Specifications IR 05000333/20240112024-09-19019 September 2024 Follow-up to Inspection Procedure 71153 Report 05000333/2024011 and Preliminary White Finding and Apparent Violation JAFP-24-0044, Core Operating Limits Report Cycle 272024-09-16016 September 2024 Core Operating Limits Report Cycle 27 JAFP-24-0043, Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues2024-09-12012 September 2024 Revision to Commitment Relating to Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues 05000333/LER-2024-002, Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation2024-09-0404 September 2024 Reactor Protection System Electric Power Monitoring System Trip Caused Primary Containment Isolation ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis IR 05000333/20240052024-08-29029 August 2024 Updated Inspection Plan for James A. Fitzpatrick Nuclear Power Plant (Report 05000333/2024005) 05000333/LER-2024-001-01, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-08-21021 August 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000333/20240022024-08-0707 August 2024 Integrated Inspection Report 05000333/2024002 JAFP-24-0034, 10 CFR 50.46 Annual Report2024-07-31031 July 2024 10 CFR 50.46 Annual Report ML24208A0492024-07-30030 July 2024 Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Proposed No Significant Hazards Consideration Determination (Letter) JAFP-24-0036, Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-07-29029 July 2024 Supplement to License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test IR 05000333/20244032024-07-18018 July 2024 Biennial Problem Identification and Resolution Inspection Report 05000333/2024403 (Cover Letter Only) IR 05000333/20244012024-07-15015 July 2024 Security Baseline Inspection 05000333/2024401 RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24190A1932024-07-0909 July 2024 Correction Letter of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance IR 05000333/20240102024-07-0808 July 2024 Commercial Grade Dedication Inspection Report 05000333/2024010 ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test JAFP-24-0027, EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket2024-06-24024 June 2024 EDG Lube Oil Check Valve Bonnet Cap Leak Due to Failed Gasket RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations JAFP-24-0026, Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance2024-06-12012 June 2024 Supplement to License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (Srvs) Setpoint Lower Tolerance ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 JAFP-24-0023, 2023 Annual Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000333/20240012024-05-0909 May 2024 Integrated Inspection Report 05000333/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests JAFP-24-0020, 2023 Annual Radioactive Effluent Release Report2024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report JAFP-24-0019, 2023 REIRS Transmittal of NRC Form 52024-04-18018 April 2024 2023 REIRS Transmittal of NRC Form 5 ML24106A0152024-04-15015 April 2024 Request for Withholding Information from Public Disclosure Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24107A6972024-04-12012 April 2024 Engine Systems, Inc Part 21 Report Re EMD Cylinder Liner Water Leak RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24068A0532024-03-28028 March 2024 Issuance of Amendment No. 354 Revise Technical Specifications Section 3.3.1.2, Source Range Monitors Instrumentation JAFP-24-0014, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-03-25025 March 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis JAFP-24-0010, Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance2024-02-29029 February 2024 Response to Request for Additional Information for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance JAFP-24-0009, Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis2024-02-28028 February 2024 Response to Request for Additional Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis IR 05000333/20230062024-02-28028 February 2024 Annual Assessment Letter for James A. FitzPatrick Nuclear Power Plant (Report 05000333/2023006) IR 05000333/20230042024-02-0707 February 2024 Integrated Inspection Report 05000333/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200012/2023001 2024-09-04
[Table view] Category:License-Operator
MONTHYEARJAFP-24-0033, Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test2024-07-23023 July 2024 Response to Request for Information Pertaining to a Licensed Operator Positive Fitness-For-Duty Test ML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24176A2412024-06-24024 June 2024 Licensed Operator Positive Fitness-for-Duty Test ML23228A1342023-08-16016 August 2023 Licensed Operator Positive Fitness-For-Duty Test RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML24008A0302022-11-0909 November 2022 Examination Administrative Files ML22252A0102022-09-0909 September 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22252A0052022-09-0909 September 2022 Final Qa/Related Forms (Folder 1) ML23004A1022022-08-30030 August 2022 Draft Written Examination and Operating Test Outlines (Folder 2) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22073A1112022-03-14014 March 2022 Requalification Program Inspection IR 05000333/20213012021-10-0505 October 2021 Initial Operator Licensing Examination Report 05000333/2021301 ML22355A6502021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22355A6482021-08-30030 August 2021 Final Written Exam and Operating Test Outlines (Folder 3) ML22355A6492021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML23004A0932021-08-30030 August 2021 Final Qa/Related Forms (Folder 1) ML21019A4472021-01-20020 January 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A2042020-04-15015 April 2020 March 4, 2020, Nrc Generic Fundamentals Examination Results for James A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key ML20078K2112020-03-19019 March 2020 Requalification Program Inspection - James A. Fitzpatrick Nuclear Power Plant ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) ML20043C8092020-02-11011 February 2020 Operator Licensing Examination Approval ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML19211C3782019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19008A1022019-01-0707 January 2019 Operator Licensing Examination Approval ML18163A2922018-06-12012 June 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18134A2302018-05-14014 May 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B7042018-03-27027 March 2018 Dec. 2016 GFE Post-Exam Comment and Response ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18029A5822018-01-29029 January 2018 Requalification Program Inspection ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17313A2752017-11-0808 November 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17034A1132017-02-0202 February 2017 December 7, 2016, NRC Generic Fundamentals Examination Results for J. A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 JAFP-16-0118, NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 20212016-07-18018 July 2016 NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 2021 ML16145A3832016-04-0606 April 2016 Final Qa/Related Forms (Folder 1) ML16145A3692016-03-24024 March 2016 Miscellaneous Exam Material (Folder 1) 2024-07-03
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24184A1662024-07-0303 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML24008A0302022-11-0909 November 2022 Examination Administrative Files ML22252A0102022-09-0909 September 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22252A0052022-09-0909 September 2022 Final Qa/Related Forms (Folder 1) ML23004A1022022-08-30030 August 2022 Draft Written Examination and Operating Test Outlines (Folder 2) RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000333/20213012021-10-0505 October 2021 Initial Operator Licensing Examination Report 05000333/2021301 ML22355A6502021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML23004A0932021-08-30030 August 2021 Final Qa/Related Forms (Folder 1) ML22355A6492021-08-30030 August 2021 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22355A6482021-08-30030 August 2021 Final Written Exam and Operating Test Outlines (Folder 3) ML21019A4472021-01-20020 January 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A2042020-04-15015 April 2020 March 4, 2020, Nrc Generic Fundamentals Examination Results for James A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20087G8522020-03-27027 March 2020 Ja Fitzpatrick - Final Operating Test (Sections a, B, and C) (Folder 3) ML20087H5142020-03-27027 March 2020 Ja Fitzpatrick Final Written Exam Questions and Answer Key ML20078K2112020-03-19019 March 2020 Requalification Program Inspection - James A. Fitzpatrick Nuclear Power Plant ML21056A3072020-03-12012 March 2020 Handouts to Applicants (Folder 3) ML21056A2842020-02-15015 February 2020 Final Qa/Related Forms (Folder 1) ML21056A2852020-02-15015 February 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20043C8092020-02-11011 February 2020 Operator Licensing Examination Approval ML21056A3062020-02-10010 February 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20260H1532020-01-24024 January 2020 Draft Written Examination (Folder 2) ML20260H1542020-01-24024 January 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML20260H1512019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20260H1522019-10-14014 October 2019 Draft Written Examination and Operating Test Outlines (Folder 2) ML20260H1502019-10-14014 October 2019 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML19211C3782019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19008A1022019-01-0707 January 2019 Operator Licensing Examination Approval ML18163A2922018-06-12012 June 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18134A2302018-05-14014 May 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18086B7042018-03-27027 March 2018 Dec. 2016 GFE Post-Exam Comment and Response ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17313A2752017-11-0808 November 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17034A1132017-02-0202 February 2017 December 7, 2016, NRC Generic Fundamentals Examination Results for J. A. Fitzpatrick Nuclear Power Plant (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 JAFP-16-0118, NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 20212016-07-18018 July 2016 NRC Form 536, Operator Licensing Examination Data for Calendar Years 2018 to 2021 ML16145A3832016-04-0606 April 2016 Final Qa/Related Forms (Folder 1) ML16145A3692016-03-24024 March 2016 Miscellaneous Exam Material (Folder 1) ML16081A1592016-03-0303 March 2016 NRC Comments on Draft Licensee-Developed Exam (Written) (Folder 2) ML16085A2472016-03-0303 March 2016 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML16085A2462016-03-0101 March 2016 Final Outlines (Folder 3) ML16085A2482016-03-0101 March 2016 Handouts to Applicants - Summary of References(Folder 3) ML16081A0772016-02-29029 February 2016 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML16085A2492016-02-25025 February 2016 Final Operating Exam (Sections a, B, and C) (Folder 3) 2024-07-03
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 November 7, 2013 Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093
SUBJECT:
SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD (FROM PUBLIC)
Dear Mr. Laing:
On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets.
A copy of the BWR GFE and the answer key are available for your review on the NRCs website approximately 60 days following the examination administration date at:
http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html.
If you have any questions concerning the examination, please contact me at 610-337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-333
Enclosures:
(Non-Public):
September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets cc: w/o enclosures via ListServ
November 7, 2013 Mr. Daniel Laing Manager, Training & Development Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093
SUBJECT:
SEPTEMBER 4, 2013, NRC GENERIC FUNDAMENTALS EXAMINATION RESULTS FOR J. A. FITZPATRICK NUCLEAR POWER PLANT (COVER LETTER PUBLICLY AVAILABLE, ENCLOSURES WITHHELD FROM PUBLIC)
Dear Mr. Laing:
On September 4, 2013, the NRC administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Sixteen applicants passed the exam and two failed. Enclosed with this letter are copies of the final answer key, the grading results for your facility, and copies of individual examination answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets.
A copy of the BWR GFE and the answer key are available for your review on the NRCs website approximately 60 days following the examination administration date at:
http://www.nrc.gov/reactors/operator-licensing/generic-fundamentals-examinations.html.
If you have any questions concerning the examination, please contact me at 610-337-5306.
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-333
Enclosures:
(Non-Public):
September 2013, NRC Generic Fundamentals Examination Roster Report on Total and Grade for J. A. Fitzpatrick Nuclear Power Plant Individual NRC Examination Answer Sheets cc w/o enclosures via ListServ DOCUMENT NAME: G:\DRS\Operations Branch\GFE\2013\FP09-04-GFE ResultsLtr.docx ADAMS PACKAGE NO.: ML13108A011 ADAMS NO.: ML13312A206 Non-Sensitive Publicly Available SUNSI Review Sensitive OFFICE RI/DRS/OB RI/DRS/OB NAME CBixler/CB DEJackson/DJ DATE 11/07/13 11/07/13 OFFICIAL RECORD COPY