| number = ML13339A514
| number = ML13339A514
| issue date = 12/05/2013
| issue date = 12/05/2013
| title = Errata Letter For Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report 05000400-13-404
| title = Errata Letter for Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report 05000400-13-404
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Hamrick G T
| addressee name = Hamrick G
| addressee affiliation = Carolina Power & Light Co
| addressee affiliation = Carolina Power & Light Co
| docket = 05000400
| docket = 05000400
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES December 5, 2013
[[Issue date::December 5, 2013]]


Mr. George Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165
==SUBJECT:==
 
ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404
SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404
 
==Dear Mr. Hamrick:==
On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Should you have any questions concerning this letter, please contact me at (404) 997-4662.
 
Sincerely,/RA: Malcolm T. Widmann for/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety
 
Docket No.: 50-400 License No.: NPF-63 cc: (See page 2)
December 5, 2013 Mr. George Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165
 
SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404


==Dear Mr. Hamrick:==
==Dear Mr. Hamrick:==
On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused.
On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Should you have any questions concerning this letter, please contact me at (404) 997-4662.
Should you have any questions concerning this letter, please contact me at (404) 997-4662.


Sincerely,/RA: Malcolm T. Widmann for/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63  
Sincerely,
/RA: Malcolm T. Widmann for/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63 cc: (See page 2)


cc: (See page 2)
_ML13339A514_______________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME DLANYI EGUTHRIE DATE 12/4/2013 12/5/2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:
x PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE x NON-SENSITIVE ADAMS: x Yes ACCESSION NUMBER:_ML13339A514_______________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME DLANYI EGUTHRIE DATE 12/4/2013 12/5/2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\OBII\TI-186 INSPECTIONS\HARRIS\HARRIS ERRATTA LETTER TI-186 INSPECTION REPORT.DOCX cc: Lara S. Nichols Deputy General Counsel Duke Energy Corporation 550 S. Tyron Street Mail Code DEC45A Charlotte, NC 28202  
Lara S. Nichols Deputy General Counsel Duke Energy Corporation 550 S. Tyron Street Mail Code DEC45A Charlotte, NC 28202 Ernest J. Kapopoulos Jr.


Ernest J. Kapopoulos Jr. Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 R. Keith Holbrook Manager, Support Services Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562  
Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 R. Keith Holbrook Manager, Support Services Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Progress Energy Carolinas, Inc.


Progress Energy Carolinas, Inc.
ATTN: Mr. Donald L. Griffith Training Manager Harris Energy & Env. Center Shearon Harris Nuclear Power Plant P.O. Box 327, State Road 1127 New Hill, NC 27562-0165
 
ATTN: Mr. Donald L. Griffith Training Manager Harris Energy & Env. Center Shearon Harris Nuclear Power Plant P.O. Box 327, State Road 1127 New Hill, NC 27562-0165  


Letter to George from Eugene F. Guthrie dated December 5, 2013.
Letter to George from Eugene F. Guthrie dated December 5, 2013.


SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404 Distribution: RidsNrrPMShearonHarris Resource C. Evans, RII EICS L. Douglas, RII EICS  
SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404 Distribution:
 
RidsNrrPMShearonHarris Resource C. Evans, RII EICS L. Douglas, RII EICS S. Coker, NSIR/DSO/DDSO/ST T. Dimitriadis, RI R. Albert, NSIR B. Desai, RII B. Huffman, NSIR/DPR/DDIR/OB D. Funk, RIII J. Kozal, NSIR/DPR/DDIR/CB M. Haire, RIV E. Bowman, NRR/DPR/PGCB [Any required agreement state distribution]
S. Coker, NSIR/DSO/DDSO/ST T. Dimitriadis, RI R. Albert, NSIR B. Desai, RII B. Huffman, NSIR/DPR/DDIR/OB D. Funk, RIII J. Kozal, NSIR/DPR/DDIR/CB M. Haire, RIV E. Bowman, NRR/DPR/PGCB [Any required agreement state distribution]
}}
}}

Latest revision as of 10:41, 4 November 2019

Errata Letter for Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report 05000400-13-404
ML13339A514
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/05/2013
From: Eugene Guthrie
Division of Reactor Safety II
To: Hamrick G
Carolina Power & Light Co
References
IR-13-404
Download: ML13339A514 (4)


Text

UNITED STATES December 5, 2013

SUBJECT:

ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404

Dear Mr. Hamrick:

On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact me at (404) 997-4662.

Sincerely,

/RA: Malcolm T. Widmann for/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63 cc: (See page 2)

_ML13339A514_______________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME DLANYI EGUTHRIE DATE 12/4/2013 12/5/2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:

Lara S. Nichols Deputy General Counsel Duke Energy Corporation 550 S. Tyron Street Mail Code DEC45A Charlotte, NC 28202 Ernest J. Kapopoulos Jr.

Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 R. Keith Holbrook Manager, Support Services Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Progress Energy Carolinas, Inc.

ATTN: Mr. Donald L. Griffith Training Manager Harris Energy & Env. Center Shearon Harris Nuclear Power Plant P.O. Box 327, State Road 1127 New Hill, NC 27562-0165

Letter to George from Eugene F. Guthrie dated December 5, 2013.

SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404 Distribution:

RidsNrrPMShearonHarris Resource C. Evans, RII EICS L. Douglas, RII EICS S. Coker, NSIR/DSO/DDSO/ST T. Dimitriadis, RI R. Albert, NSIR B. Desai, RII B. Huffman, NSIR/DPR/DDIR/OB D. Funk, RIII J. Kozal, NSIR/DPR/DDIR/CB M. Haire, RIV E. Bowman, NRR/DPR/PGCB [Any required agreement state distribution]