{{#Wiki_filter:ber 5, 2013
{{#Wiki_filter:UNITED STATES December 5, 2013


==SUBJECT:==
==SUBJECT:==
ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 251 5/186 INSPECTION REPORT 05000400/2013404
ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404


==Dear Mr. Hamrick:==
==Dear Mr. Hamrick:==
On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused.
On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Should you have any questions concerning this letter, please contact me at (404) 997-4662.
Should you have any questions concerning this letter, please contact me at (404) 997-4662.


Sincerely,
Sincerely,
/RA: Malcolm T. Widmann for/  
/RA: Malcolm T. Widmann for/
Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63 cc: (See page 2)


Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety
_ML13339A514_______________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME DLANYI EGUTHRIE DATE  12/4/2013 12/5/2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:
Lara S. Nichols Deputy General Counsel Duke Energy Corporation 550 S. Tyron Street Mail Code DEC45A Charlotte, NC 28202 Ernest J. Kapopoulos Jr.


Docket No.: 50-400 License No.: NPF-63
Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 R. Keith Holbrook Manager, Support Services Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Progress Energy Carolinas, Inc.


cc: (See page 2)
ATTN: Mr. Donald L. Griffith Training Manager Harris Energy & Env. Center Shearon Harris Nuclear Power Plant P.O. Box 327, State Road 1127 New Hill, NC 27562-0165
 
_ML13339A514_______________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME DLANYI EGUTHRIE DATE 12/4/2013 12/5/2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc: Lara S. Nichols Deputy General Counsel Duke Energy Corporation 550 S. Tyron Street
 
Mail Code DEC45A
 
Charlotte, NC 28202
 
Ernest J. Kapopoulos Jr.
 
Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant
 
5413 Shearon Harris Road
 
New Hill, NC 27562 R. Keith Holbrook
 
Manager, Support Services Shearon Harris Nuclear Power Plant
 
5413 Shearon Harris Road New Hill, NC 27562
 
Terrence E. Slake
 
Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562
 
Progress Energy Carolinas, Inc.
 
ATTN: Mr. Donald L. Griffith Training Manager Harris Energy & Env. Center Shearon Harris Nuclear Power Plant P.O. Box 327, State Road 1127  
 
New Hill, NC 27562-0165  


Letter to George from Eugene F. Guthrie dated December 5, 2013.
Letter to George from Eugene F. Guthrie dated December 5, 2013.


SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 251 5/186 INSPECTION REPORT 05000400/2013404 Distribution:
SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404 Distribution:
RidsNrrPMShearonHarris Resource C. Evans, RII EICS L. Douglas, RII EICS  
RidsNrrPMShearonHarris Resource C. Evans, RII EICS L. Douglas, RII EICS S. Coker, NSIR/DSO/DDSO/ST T. Dimitriadis, RI R. Albert, NSIR B. Desai, RII B. Huffman, NSIR/DPR/DDIR/OB D. Funk, RIII J. Kozal, NSIR/DPR/DDIR/CB M. Haire, RIV E. Bowman, NRR/DPR/PGCB [Any required agreement state distribution]
 
S. Coker, NSIR/DSO/DDSO/ST T. Dimitriadis, RI R. Albert, NSIR B. Desai, RII B. Huffman, NSIR/DPR/DDIR/OB D. Funk, RIII J. Kozal, NSIR/DPR/DDIR/CB M. Haire, RIV E. Bowman, NRR/DPR/PGCB [Any required agreement state distribution]
}}
}}

Latest revision as of 10:41, 4 November 2019

Errata Letter for Shearon Harris Nuclear Plant - NRC Temporary Instruction 2515/186 Inspection Report 05000400-13-404
ML13339A514
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/05/2013
From: Eugene Guthrie
Division of Reactor Safety II
To: Hamrick G
Carolina Power & Light Co
References
IR-13-404
Download: ML13339A514 (4)


Text

UNITED STATES December 5, 2013

SUBJECT:

ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404

Dear Mr. Hamrick:

On October 31, 2013, the US Nuclear Regulatory Commission (NRC) issued the subject inspection report for the Shearon Harris Nuclear Plant using Temporary Instruction 2515/186 (ML13305B047). In reviewing this report, we identified an administrative error regarding the incorrect inspection report number. The correct report number should be 05000400/2013406 instead of 05000400/2013404. Please make the appropriate pen and ink change in the subject report to reflect the correction. We apologize for any inconvenience caused.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this letter, please contact me at (404) 997-4662.

Sincerely,

/RA: Malcolm T. Widmann for/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket No.: 50-400 License No.: NPF-63 cc: (See page 2)

_ML13339A514_______________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME DLANYI EGUTHRIE DATE 12/4/2013 12/5/2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 12/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO cc:

Lara S. Nichols Deputy General Counsel Duke Energy Corporation 550 S. Tyron Street Mail Code DEC45A Charlotte, NC 28202 Ernest J. Kapopoulos Jr.

Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 R. Keith Holbrook Manager, Support Services Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road New Hill, NC 27562 Progress Energy Carolinas, Inc.

ATTN: Mr. Donald L. Griffith Training Manager Harris Energy & Env. Center Shearon Harris Nuclear Power Plant P.O. Box 327, State Road 1127 New Hill, NC 27562-0165

Letter to George from Eugene F. Guthrie dated December 5, 2013.

SUBJECT: ERRATA LETTER FOR SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 05000400/2013404 Distribution:

RidsNrrPMShearonHarris Resource C. Evans, RII EICS L. Douglas, RII EICS S. Coker, NSIR/DSO/DDSO/ST T. Dimitriadis, RI R. Albert, NSIR B. Desai, RII B. Huffman, NSIR/DPR/DDIR/OB D. Funk, RIII J. Kozal, NSIR/DPR/DDIR/CB M. Haire, RIV E. Bowman, NRR/DPR/PGCB [Any required agreement state distribution]