ML14049A438: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14049A438
| number = ML14049A438
| issue date = 02/14/2014
| issue date = 02/14/2014
| title = Quad Cities, Inspection Report Plan for 05000254-14-003 & 05000265-14-003
| title = Inspection Report Plan for 05000254-14-003 & 05000265-14-003
| author name = Bozga J V
| author name = Bozga J
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
See also: [[followed by::IR 05000254/2014003]]
See also: [[see also::IR 05000254/2014003]]


=Text=
=Text=
{{#Wiki_filter:Inspection Report:               05000254/2014003; 05000265/2014003 Inspection Dates:                 April 7th thru April 11th 2014 Inspection Procedure:         Temporary Instruction 2515/189, "Inspection to Determine Compliance of Dynamic Restraint (Snubber) Program with 10 CFR 50.55a Regulatory Requirements for Inservice Examination  
{{#Wiki_filter:Inspection Report:               05000254/2014003; 05000265/2014003
and Testing of Snubbers"                              Lead Inspector:                     John V. Bozga (630) 829-9613 I.         Information Requested for In-Office Preparation Week The following information is requested by March 24, 2014 or sooner, to facilitate the selection of specific items that will be reviewed during the onsite inspection week. The  
Inspection Dates:               April 7th thru April 11th 2014
required information identified below should be provided on compact disc (CD). Please  
Inspection Procedure:           Temporary Instruction 2515/189, Inspection to Determine
provide a CD copy. The preferred file format is a searchable "pdf" file. The CDs should be indexed and hyper-linked to facilitate ease of use, if possible. If you have any questions regarding this information, please call the inspector as soon as possible. (1) A copy of document(s) which contain(s) the current snubber Inservice Inspection (ISI) and Inservice Testing (IST) program. (The snubber program may be found in  
                                Compliance of Dynamic Restraint (Snubber) Program with 10
the ISI program, the IST program, Technical Specifications, the Technical Requirements Manual, or any other licensee-controlled documents/procedures.) (2) A copy of any alternatives and/or relief requests approved by the NRC for the snubber ISI and/or IST program. (3) Copies of any corrective-action documents involving ISI and/or IST of snubbers for the current 10-year interval, including any actions taken to address Enforcement  
                                CFR 50.55a Regulatory Requirements for Inservice Examination
Guidance Memorandum (EGM) 10-001 and Regulatory Issue Summary (RIS) 2010-06. (4) A copy of the snubber ISI and IST program based on the Technical Specification (TS) and/or Technical Requirements Manual (TRM) (if snubber ISI and IST program  
                                and Testing of Snubbers
governed through TS and/or TRM during any part of the 40 years of plant  
Lead Inspector:                 John V. Bozga
operation).
                                (630) 829-9613
(5)      A copy of the snubber ISI and IST program based on American Society of Mechanical Engineers (ASME) Section XI and/or Subsection ISTD of the ASME
I.     Information Requested for In-Office Preparation Week
Operation and Maintenance (OM) Code (if snubber ISI and IST program controlled through ASME Section XI and/or ASME Section OM during any part of the 40 years of plant operation). (6)      Licensing actions (50.59s, License Amendment Requests, Technical Specification Changes, Relief Requests or approved alternatives) that changed
      The following information is requested by March 24, 2014 or sooner, to facilitate the
snubber ISI and IST program from TS to TRM, TS to ASME Section XI, ASME
      selection of specific items that will be reviewed during the onsite inspection week. The
Section XI to ASME OM code, etc.  (7)        Copies of ISI and IST inspection records for the total snubber population (Unit 2) for the current 10-year interval. (8)        List of the snubber ISI and IST activities scheduled for the Unit 2 refueling outage and timeline for when these activities will occur. The list should include type of snubber (mechanical or hydraulic), design function (seismic, waterhammer, etc.), Tag/Mark Number (ie. FWH-139), ASME class I, II or III, vendor, risk ranking, safety classification, plant system, building location and elevation, high radiation area and accessible/inaccessible. (9)        Copy of Code of Record (ie. ASME Code Section XI or ASME OM Code) used for the current 10-year snubber ISI and IST program.  (10)      Copy of record/s where snubber inservice visual examination/s was extended beyond one refueling outage and the site evaluation of the inspection frequency
      required information identified below should be provided on compact disc (CD). Please
of the snubber visual examination/s to show compliance with the requirements
      provide a CD copy. The preferred file format is a searchable pdf file. The CDs should
of the ASME Section XI code, ASME OM Code or other approved document. (11)      Copies of records where snubber inservice visual examination/s were extended beyond two refueling outages and the site evaluation of the inspection frequency of the snubber visual examination/s to show compliance with the requirements of the ASME Section XI code, ASME OM Code or other approved
      be indexed and hyper-linked to facilitate ease of use, if possible. If you have any
document. (12)      Copies of testing records for selected snubbers which had inservice test failures during the current 10 year interval and the site evaluation whether an additional sample at least one-half the size of the initial sample was tested as required by the ASME OM Code or any other NRC-approved alternative(s).  (13)      Copy of ISI VT-3 visual inspection procedure used for snubber ISI examinations. (14)    Copy of IST procedure used for snubber IST. (15)      Copy of site evaluation that was performed to address requirements of ASME OM Code Case 13, "Requirements for Extending Snubber Inservice Visual Examination Interval at LWR Power Plants", if site is using code case to extend ISI examination interval. (16)      Copy of NRC approval of OM Code Case OMN-15, "Requirement for Extending the Snubber Operational Readiness Testing Interval at LWR Power Plants," to
      questions regarding this information, please call the inspector as soon as possible.
extend the snubber inservice testing interval, if applicable. 
      (1) A copy of document(s) which contain(s) the current snubber Inservice Inspection
(17)    Copy of documents that pertain to Service Life Monitoring of total snubber population (Unit 2). (18)    Copy of records (i.e. repair, replacements, maintenance, corrective work, failures, etc.) for the total snubber population (Unit 2) that are recorded and included in the Service Life Monitoring program.  (19)    The most recent Quality Assurance Audit and/or Self-Assessment of the snubber ISI and IST program. (20)      Electronic copy of the UFSAR, technical specifications and technical requirements manual if available. (21)      Name(s) and phone numbers for the regulatory and technical contacts. (22)      Current management and engineering organizational chart.
          (ISI) and Inservice Testing (IST) program. (The snubber program may be found in
II.    Information Requested to be provided throughout the inspection (1)    Copies of any corrective action documents generated as a result of the inspection team's questions or queries during this inspection. (2)    Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide daily during the inspection to
          the ISI program, the IST program, Technical Specifications, the Technical
inspector). If you have any questions regarding the information requested, please contact the lead inspector, John V. Bozga (630)-829-9613 
          Requirements Manual, or any other licensee-controlled documents/procedures.)
      (2) A copy of any alternatives and/or relief requests approved by the NRC for the
          snubber ISI and/or IST program.
      (3) Copies of any corrective-action documents involving ISI and/or IST of snubbers for
          the current 10-year interval, including any actions taken to address Enforcement
          Guidance Memorandum (EGM) 10-001 and Regulatory Issue Summary (RIS) 2010-
          06.
      (4) A copy of the snubber ISI and IST program based on the Technical Specification
          (TS) and/or Technical Requirements Manual (TRM) (if snubber ISI and IST program
          governed through TS and/or TRM during any part of the 40 years of plant
          operation).
              .


(5)  A copy of the snubber ISI and IST program based on American Society of
      Mechanical Engineers (ASME) Section XI and/or Subsection ISTD of the ASME
      Operation and Maintenance (OM) Code (if snubber ISI and IST program
      controlled through ASME Section XI and/or ASME Section OM during any part
      of the 40 years of plant operation).
(6)  Licensing actions (50.59s, License Amendment Requests, Technical
      Specification Changes, Relief Requests or approved alternatives) that changed
      snubber ISI and IST program from TS to TRM, TS to ASME Section XI, ASME
      Section XI to ASME OM code, etc.
(7)    Copies of ISI and IST inspection records for the total snubber population (Unit
      2) for the current 10-year interval.
(8)    List of the snubber ISI and IST activities scheduled for the Unit 2 refueling
      outage and timeline for when these activities will occur.
      The list should include type of snubber (mechanical or hydraulic), design
      function (seismic, waterhammer, etc.), Tag/Mark Number (ie. FWH-139), ASME
      class I, II or III, vendor, risk ranking, safety classification, plant system, building
      location and elevation, high radiation area and accessible/inaccessible.
(9)    Copy of Code of Record (ie. ASME Code Section XI or ASME OM Code) used
      for the current 10-year snubber ISI and IST program.
(10)  Copy of record/s where snubber inservice visual examination/s was extended
      beyond one refueling outage and the site evaluation of the inspection frequency
      of the snubber visual examination/s to show compliance with the requirements
      of the ASME Section XI code, ASME OM Code or other approved document.
(11)  Copies of records where snubber inservice visual examination/s were extended
      beyond two refueling outages and the site evaluation of the inspection
      frequency of the snubber visual examination/s to show compliance with the
      requirements of the ASME Section XI code, ASME OM Code or other approved
      document.
(12)  Copies of testing records for selected snubbers which had inservice test failures
      during the current 10 year interval and the site evaluation whether an additional
      sample at least one-half the size of the initial sample was tested as required by
      the ASME OM Code or any other NRC-approved alternative(s).
(13)  Copy of ISI VT-3 visual inspection procedure used for snubber ISI
      examinations.
(14) Copy of IST procedure used for snubber IST.
(15)  Copy of site evaluation that was performed to address requirements of ASME
      OM Code Case 13, Requirements for Extending Snubber Inservice Visual
      Examination Interval at LWR Power Plants, if site is using code case to extend
      ISI examination interval.
(16)  Copy of NRC approval of OM Code Case OMN-15, Requirement for Extending
      the Snubber Operational Readiness Testing Interval at LWR Power Plants, to
      extend the snubber inservice testing interval, if applicable.
          (17)    Copy of documents that pertain to Service Life Monitoring of total snubber
                  population (Unit 2).
          (18)    Copy of records (i.e. repair, replacements, maintenance, corrective work,
                  failures, etc.) for the total snubber population (Unit 2) that are recorded and
                  included in the Service Life Monitoring program.
          (19)    The most recent Quality Assurance Audit and/or Self-Assessment of the snubber
                  ISI and IST program.
          (20)      Electronic copy of the UFSAR, technical specifications and technical
                  requirements manual if available.
          (21)      Name(s) and phone numbers for the regulatory and technical contacts.
          (22)      Current management and engineering organizational chart.
II.    Information Requested to be provided throughout the inspection
    (1)    Copies of any corrective action documents generated as a result of the inspection
          teams questions or queries during this inspection.
    (2)    Copies of the list of questions submitted by the inspection team members and the
          status/resolution of the information requested (provide daily during the inspection to
          inspector).
If you have any questions regarding the information requested, please contact the lead
inspector, John V. Bozga (630)-829-9613
}}
}}

Latest revision as of 08:06, 4 November 2019

Inspection Report Plan for 05000254-14-003 & 05000265-14-003
ML14049A438
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 02/14/2014
From: John Bozga
NRC/RGN-III
To:
John Bozga
References
IR-14-003
Download: ML14049A438 (1)


See also: IR 05000254/2014003

Text

Inspection Report: 05000254/2014003; 05000265/2014003

Inspection Dates: April 7th thru April 11th 2014

Inspection Procedure: Temporary Instruction 2515/189, Inspection to Determine

Compliance of Dynamic Restraint (Snubber) Program with 10

CFR 50.55a Regulatory Requirements for Inservice Examination

and Testing of Snubbers

Lead Inspector: John V. Bozga

(630) 829-9613

I. Information Requested for In-Office Preparation Week

The following information is requested by March 24, 2014 or sooner, to facilitate the

selection of specific items that will be reviewed during the onsite inspection week. The

required information identified below should be provided on compact disc (CD). Please

provide a CD copy. The preferred file format is a searchable pdf file. The CDs should

be indexed and hyper-linked to facilitate ease of use, if possible. If you have any

questions regarding this information, please call the inspector as soon as possible.

(1) A copy of document(s) which contain(s) the current snubber Inservice Inspection

(ISI) and Inservice Testing (IST) program. (The snubber program may be found in

the ISI program, the IST program, Technical Specifications, the Technical

Requirements Manual, or any other licensee-controlled documents/procedures.)

(2) A copy of any alternatives and/or relief requests approved by the NRC for the

snubber ISI and/or IST program.

(3) Copies of any corrective-action documents involving ISI and/or IST of snubbers for

the current 10-year interval, including any actions taken to address Enforcement

Guidance Memorandum (EGM)10-001 and Regulatory Issue Summary (RIS) 2010-

06.

(4) A copy of the snubber ISI and IST program based on the Technical Specification

(TS) and/or Technical Requirements Manual (TRM) (if snubber ISI and IST program

governed through TS and/or TRM during any part of the 40 years of plant

operation).

.

(5) A copy of the snubber ISI and IST program based on American Society of

Mechanical Engineers (ASME)Section XI and/or Subsection ISTD of the ASME

Operation and Maintenance (OM) Code (if snubber ISI and IST program

controlled through ASME Section XI and/or ASME Section OM during any part

of the 40 years of plant operation).

(6) Licensing actions (50.59s, License Amendment Requests, Technical

Specification Changes, Relief Requests or approved alternatives) that changed

snubber ISI and IST program from TS to TRM, TS to ASME Section XI, ASME

Section XI to ASME OM code, etc.

(7) Copies of ISI and IST inspection records for the total snubber population (Unit

2) for the current 10-year interval.

(8) List of the snubber ISI and IST activities scheduled for the Unit 2 refueling

outage and timeline for when these activities will occur.

The list should include type of snubber (mechanical or hydraulic), design

function (seismic, waterhammer, etc.), Tag/Mark Number (ie. FWH-139), ASME

class I, II or III, vendor, risk ranking, safety classification, plant system, building

location and elevation, high radiation area and accessible/inaccessible.

(9) Copy of Code of Record (ie. ASME Code Section XI or ASME OM Code) used

for the current 10-year snubber ISI and IST program.

(10) Copy of record/s where snubber inservice visual examination/s was extended

beyond one refueling outage and the site evaluation of the inspection frequency

of the snubber visual examination/s to show compliance with the requirements

of the ASME Section XI code, ASME OM Code or other approved document.

(11) Copies of records where snubber inservice visual examination/s were extended

beyond two refueling outages and the site evaluation of the inspection

frequency of the snubber visual examination/s to show compliance with the

requirements of the ASME Section XI code, ASME OM Code or other approved

document.

(12) Copies of testing records for selected snubbers which had inservice test failures

during the current 10 year interval and the site evaluation whether an additional

sample at least one-half the size of the initial sample was tested as required by

the ASME OM Code or any other NRC-approved alternative(s).

(13) Copy of ISI VT-3 visual inspection procedure used for snubber ISI

examinations.

(14) Copy of IST procedure used for snubber IST.

(15) Copy of site evaluation that was performed to address requirements of ASME

OM Code Case 13, Requirements for Extending Snubber Inservice Visual

Examination Interval at LWR Power Plants, if site is using code case to extend

ISI examination interval.

(16) Copy of NRC approval of OM Code Case OMN-15, Requirement for Extending

the Snubber Operational Readiness Testing Interval at LWR Power Plants, to

extend the snubber inservice testing interval, if applicable.

(17) Copy of documents that pertain to Service Life Monitoring of total snubber

population (Unit 2).

(18) Copy of records (i.e. repair, replacements, maintenance, corrective work,

failures, etc.) for the total snubber population (Unit 2) that are recorded and

included in the Service Life Monitoring program.

(19) The most recent Quality Assurance Audit and/or Self-Assessment of the snubber

ISI and IST program.

(20) Electronic copy of the UFSAR, technical specifications and technical

requirements manual if available.

(21) Name(s) and phone numbers for the regulatory and technical contacts.

(22) Current management and engineering organizational chart.

II. Information Requested to be provided throughout the inspection

(1) Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during this inspection.

(2) Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provide daily during the inspection to

inspector).

If you have any questions regarding the information requested, please contact the lead

inspector, John V. Bozga (630)-829-9613