ML14049A438: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Inspection Report | {{#Wiki_filter:Inspection Report: 05000254/2014003; 05000265/2014003 | ||
: | Inspection Dates: April 7th thru April 11th 2014 | ||
Inspection Dates | Inspection Procedure: Temporary Instruction 2515/189, Inspection to Determine | ||
: | Compliance of Dynamic Restraint (Snubber) Program with 10 | ||
CFR 50.55a Regulatory Requirements for Inservice Examination | |||
and Testing of Snubbers | |||
: | Lead Inspector: John V. Bozga | ||
and Testing of Snubbers | (630) 829-9613 | ||
Lead Inspector | I. Information Requested for In-Office Preparation Week | ||
: | The following information is requested by March 24, 2014 or sooner, to facilitate the | ||
(630) 829-9613 | selection of specific items that will be reviewed during the onsite inspection week. The | ||
required information identified below should be provided on compact disc (CD). Please | |||
provide a CD copy. The preferred file format is a searchable pdf file. The CDs should | |||
required information identified below should be provided on compact disc (CD). | be indexed and hyper-linked to facilitate ease of use, if possible. If you have any | ||
provide a CD copy. | questions regarding this information, please call the inspector as soon as possible. | ||
be indexed and hyper-linked to facilitate ease of use, if possible. | (1) A copy of document(s) which contain(s) the current snubber Inservice Inspection | ||
the ISI program, the IST program, Technical Specifications, the Technical Requirements Manual, or any other licensee-controlled documents/procedures.) (2) A copy of any alternatives and/or relief requests approved by the NRC for the snubber ISI and/or IST program. (3) Copies of any corrective-action documents involving ISI and/or IST of snubbers for the current 10-year interval, including any actions taken to address Enforcement | (ISI) and Inservice Testing (IST) program. (The snubber program may be found in | ||
Guidance Memorandum (EGM) 10-001 and Regulatory Issue Summary (RIS) 2010- | the ISI program, the IST program, Technical Specifications, the Technical | ||
06. | Requirements Manual, or any other licensee-controlled documents/procedures.) | ||
governed through TS and/or TRM during any part of the 40 years of plant | (2) A copy of any alternatives and/or relief requests approved by the NRC for the | ||
operation). | snubber ISI and/or IST program. | ||
(3) Copies of any corrective-action documents involving ISI and/or IST of snubbers for | |||
the current 10-year interval, including any actions taken to address Enforcement | |||
Guidance Memorandum (EGM) 10-001 and Regulatory Issue Summary (RIS) 2010- | |||
06. | |||
(4) A copy of the snubber ISI and IST program based on the Technical Specification | |||
(TS) and/or Technical Requirements Manual (TRM) (if snubber ISI and IST program | |||
governed through TS and/or TRM during any part of the 40 years of plant | |||
operation). | |||
. | |||
document. (12) | (5) A copy of the snubber ISI and IST program based on American Society of | ||
(15) | Mechanical Engineers (ASME) Section XI and/or Subsection ISTD of the ASME | ||
Extending Snubber Inservice Visual Examination Interval at LWR Power Plants | Operation and Maintenance (OM) Code (if snubber ISI and IST program | ||
extend the snubber inservice testing interval, if applicable | controlled through ASME Section XI and/or ASME Section OM during any part | ||
of the 40 years of plant operation). | |||
(6) Licensing actions (50.59s, License Amendment Requests, Technical | |||
Specification Changes, Relief Requests or approved alternatives) that changed | |||
snubber ISI and IST program from TS to TRM, TS to ASME Section XI, ASME | |||
Section XI to ASME OM code, etc. | |||
(7) Copies of ISI and IST inspection records for the total snubber population (Unit | |||
2) for the current 10-year interval. | |||
(8) List of the snubber ISI and IST activities scheduled for the Unit 2 refueling | |||
outage and timeline for when these activities will occur. | |||
The list should include type of snubber (mechanical or hydraulic), design | |||
function (seismic, waterhammer, etc.), Tag/Mark Number (ie. FWH-139), ASME | |||
class I, II or III, vendor, risk ranking, safety classification, plant system, building | |||
location and elevation, high radiation area and accessible/inaccessible. | |||
(9) Copy of Code of Record (ie. ASME Code Section XI or ASME OM Code) used | |||
for the current 10-year snubber ISI and IST program. | |||
(10) Copy of record/s where snubber inservice visual examination/s was extended | |||
beyond one refueling outage and the site evaluation of the inspection frequency | |||
of the snubber visual examination/s to show compliance with the requirements | |||
of the ASME Section XI code, ASME OM Code or other approved document. | |||
(11) Copies of records where snubber inservice visual examination/s were extended | |||
beyond two refueling outages and the site evaluation of the inspection | |||
frequency of the snubber visual examination/s to show compliance with the | |||
requirements of the ASME Section XI code, ASME OM Code or other approved | |||
document. | |||
(12) Copies of testing records for selected snubbers which had inservice test failures | |||
during the current 10 year interval and the site evaluation whether an additional | |||
sample at least one-half the size of the initial sample was tested as required by | |||
the ASME OM Code or any other NRC-approved alternative(s). | |||
(13) Copy of ISI VT-3 visual inspection procedure used for snubber ISI | |||
examinations. | |||
(14) Copy of IST procedure used for snubber IST. | |||
(15) Copy of site evaluation that was performed to address requirements of ASME | |||
OM Code Case 13, Requirements for Extending Snubber Inservice Visual | |||
Examination Interval at LWR Power Plants, if site is using code case to extend | |||
ISI examination interval. | |||
(16) Copy of NRC approval of OM Code Case OMN-15, Requirement for Extending | |||
the Snubber Operational Readiness Testing Interval at LWR Power Plants, to | |||
extend the snubber inservice testing interval, if applicable. | |||
(17) Copy of documents that pertain to Service Life Monitoring of total snubber | |||
population (Unit 2). | |||
(18) Copy of records (i.e. repair, replacements, maintenance, corrective work, | |||
inspector). If you have any questions regarding the information requested, please contact the lead inspector, John V. Bozga (630)-829-9613 | failures, etc.) for the total snubber population (Unit 2) that are recorded and | ||
included in the Service Life Monitoring program. | |||
(19) The most recent Quality Assurance Audit and/or Self-Assessment of the snubber | |||
ISI and IST program. | |||
(20) Electronic copy of the UFSAR, technical specifications and technical | |||
requirements manual if available. | |||
(21) Name(s) and phone numbers for the regulatory and technical contacts. | |||
(22) Current management and engineering organizational chart. | |||
II. Information Requested to be provided throughout the inspection | |||
(1) Copies of any corrective action documents generated as a result of the inspection | |||
teams questions or queries during this inspection. | |||
(2) Copies of the list of questions submitted by the inspection team members and the | |||
status/resolution of the information requested (provide daily during the inspection to | |||
inspector). | |||
If you have any questions regarding the information requested, please contact the lead | |||
inspector, John V. Bozga (630)-829-9613 | |||
}} | }} |
Latest revision as of 08:06, 4 November 2019
ML14049A438 | |
Person / Time | |
---|---|
Site: | Quad Cities |
Issue date: | 02/14/2014 |
From: | John Bozga NRC/RGN-III |
To: | |
John Bozga | |
References | |
IR-14-003 | |
Download: ML14049A438 (1) | |
See also: IR 05000254/2014003
Text
Inspection Report: 05000254/2014003; 05000265/2014003
Inspection Dates: April 7th thru April 11th 2014
Inspection Procedure: Temporary Instruction 2515/189, Inspection to Determine
Compliance of Dynamic Restraint (Snubber) Program with 10
CFR 50.55a Regulatory Requirements for Inservice Examination
and Testing of Snubbers
Lead Inspector: John V. Bozga
(630) 829-9613
I. Information Requested for In-Office Preparation Week
The following information is requested by March 24, 2014 or sooner, to facilitate the
selection of specific items that will be reviewed during the onsite inspection week. The
required information identified below should be provided on compact disc (CD). Please
provide a CD copy. The preferred file format is a searchable pdf file. The CDs should
be indexed and hyper-linked to facilitate ease of use, if possible. If you have any
questions regarding this information, please call the inspector as soon as possible.
(1) A copy of document(s) which contain(s) the current snubber Inservice Inspection
(ISI) and Inservice Testing (IST) program. (The snubber program may be found in
the ISI program, the IST program, Technical Specifications, the Technical
Requirements Manual, or any other licensee-controlled documents/procedures.)
(2) A copy of any alternatives and/or relief requests approved by the NRC for the
snubber ISI and/or IST program.
(3) Copies of any corrective-action documents involving ISI and/or IST of snubbers for
the current 10-year interval, including any actions taken to address Enforcement
Guidance Memorandum (EGM)10-001 and Regulatory Issue Summary (RIS) 2010-
06.
(4) A copy of the snubber ISI and IST program based on the Technical Specification
(TS) and/or Technical Requirements Manual (TRM) (if snubber ISI and IST program
governed through TS and/or TRM during any part of the 40 years of plant
operation).
.
(5) A copy of the snubber ISI and IST program based on American Society of
Mechanical Engineers (ASME)Section XI and/or Subsection ISTD of the ASME
Operation and Maintenance (OM) Code (if snubber ISI and IST program
controlled through ASME Section XI and/or ASME Section OM during any part
of the 40 years of plant operation).
(6) Licensing actions (50.59s, License Amendment Requests, Technical
Specification Changes, Relief Requests or approved alternatives) that changed
snubber ISI and IST program from TS to TRM, TS to ASME Section XI, ASME
Section XI to ASME OM code, etc.
(7) Copies of ISI and IST inspection records for the total snubber population (Unit
2) for the current 10-year interval.
(8) List of the snubber ISI and IST activities scheduled for the Unit 2 refueling
outage and timeline for when these activities will occur.
The list should include type of snubber (mechanical or hydraulic), design
function (seismic, waterhammer, etc.), Tag/Mark Number (ie. FWH-139), ASME
class I, II or III, vendor, risk ranking, safety classification, plant system, building
location and elevation, high radiation area and accessible/inaccessible.
(9) Copy of Code of Record (ie. ASME Code Section XI or ASME OM Code) used
for the current 10-year snubber ISI and IST program.
(10) Copy of record/s where snubber inservice visual examination/s was extended
beyond one refueling outage and the site evaluation of the inspection frequency
of the snubber visual examination/s to show compliance with the requirements
of the ASME Section XI code, ASME OM Code or other approved document.
(11) Copies of records where snubber inservice visual examination/s were extended
beyond two refueling outages and the site evaluation of the inspection
frequency of the snubber visual examination/s to show compliance with the
requirements of the ASME Section XI code, ASME OM Code or other approved
document.
(12) Copies of testing records for selected snubbers which had inservice test failures
during the current 10 year interval and the site evaluation whether an additional
sample at least one-half the size of the initial sample was tested as required by
the ASME OM Code or any other NRC-approved alternative(s).
(13) Copy of ISI VT-3 visual inspection procedure used for snubber ISI
examinations.
(14) Copy of IST procedure used for snubber IST.
(15) Copy of site evaluation that was performed to address requirements of ASME
OM Code Case 13, Requirements for Extending Snubber Inservice Visual
Examination Interval at LWR Power Plants, if site is using code case to extend
ISI examination interval.
(16) Copy of NRC approval of OM Code Case OMN-15, Requirement for Extending
the Snubber Operational Readiness Testing Interval at LWR Power Plants, to
extend the snubber inservice testing interval, if applicable.
(17) Copy of documents that pertain to Service Life Monitoring of total snubber
population (Unit 2).
(18) Copy of records (i.e. repair, replacements, maintenance, corrective work,
failures, etc.) for the total snubber population (Unit 2) that are recorded and
included in the Service Life Monitoring program.
(19) The most recent Quality Assurance Audit and/or Self-Assessment of the snubber
(20) Electronic copy of the UFSAR, technical specifications and technical
requirements manual if available.
(21) Name(s) and phone numbers for the regulatory and technical contacts.
(22) Current management and engineering organizational chart.
II. Information Requested to be provided throughout the inspection
(1) Copies of any corrective action documents generated as a result of the inspection
teams questions or queries during this inspection.
(2) Copies of the list of questions submitted by the inspection team members and the
status/resolution of the information requested (provide daily during the inspection to
inspector).
If you have any questions regarding the information requested, please contact the lead
inspector, John V. Bozga (630)-829-9613