ML15096A051: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15096A051
| number = ML15096A051
| issue date = 04/13/2015
| issue date = 04/13/2015
| title = Perry Nuclear Power Plant, Unit, No. 1 - Request for Additional Information Concerning Battery Surveillance Test Frequencies (TAC No. MF5298)
| title = Unit, No. 1 - Request for Additional Information Concerning Battery Surveillance Test Frequencies
| author name = Brown E A
| author name = Brown E
| author affiliation = NRC/NRR/DORL/LPLIII-2
| author affiliation = NRC/NRR/DORL/LPLIII-2
| addressee name = Harkness E J
| addressee name = Harkness E
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000440
| docket = 05000440
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Ernest J. Harkness Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097 !µil 13, 2015
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
                                                  !µil 13, 2015 Mr. Ernest J. Harkness Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097


==SUBJECT:==
==SUBJECT:==
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 -REQUEST FOR ADDITIONAL INFORMATION CONCERNING BATTERY SURVEILLANCE TEST FREQUENCIES (TAC NO. MF5298)(L-14-271)  
PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - REQUEST FOR ADDITIONAL INFORMATION CONCERNING BATTERY SURVEILLANCE TEST FREQUENCIES (TAC NO. MF5298)(L-14-271)


==Dear Mr. Harkness:==
==Dear Mr. Harkness:==
By application dated November 24, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14328A665), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted a license amendment request for the Perry Nuclear Power Plant. The proposed amendment is intended to revise the battery capacity testing surveillance requirements in the technical specification to reflect test requirements when the battery is near end of life. The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure. During a discussion with Mr. Phil Lashley of your staff on April 1, 2015, it was agreed that FENOC would provide a response within 30 days from the date this letter is electronically distributed The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources.
 
E. Harkness Should circumstances result in the need to revise the requested response date, please contact me at (301) 415-2315. Docket No. 50-440  
By application dated November 24, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14328A665), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted a license amendment request for the Perry Nuclear Power Plant. The proposed amendment is intended to revise the battery capacity testing surveillance requirements in the technical specification to reflect test requirements when the battery is near end of life. The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure. During a discussion with Mr. Phil Lashley of your staff on April 1, 2015, it was agreed that FENOC would provide a response within 30 days from the date this letter is electronically distributed The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources.
 
E. Harkness                                   Should circumstances result in the need to revise the requested response date, please contact me at (301) 415-2315.
Sincerely,
                                            !RAJ Eva A. Brown, Senior Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440


==Enclosure:==
==Enclosure:==
Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, !RAJ Eva A. Brown, Senior Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUEST FOR ADDITIONAL INFORMATION REVISION TO BATTERY CAPACITY SURVEILLANCE REQUIREMENTS FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC) PERRY NUCLEAR POWER PLANT. UNIT NO. 1 DOCKET NO. 50-440 1. In Section 2.0 of the submittal dated November 24, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 14328A665), FENOC states: [i]f the DC [direct current] batteries are the only available power source, the maintenance tie circuit breaker may be closed to allow the Unit 1 and Unit 2 [Class 1 E] batteries to be paralleled. Address whether the impact of paralleling the Units 1 and 2 Class 1 E batteries, such as contribution of additional short circuit current from the Unit 2 batteries, protection coordination, and protective devices ratings among other factors has been considered in the design of Unit 1, 125 volts DC system. Enclosure 


ML 15096A051 NRR-106 OFFICE LPLll-2/PM LPLlll-2/LA EE EB/BC LPLI 11-2/BC NAME EBrown SRorher JZimmeman by memo TTate DATE 4/6/15 4/6/15 3/17 /15 4/13/15}}
Request for Additional Information cc w/encl: Distribution via Listserv
 
REQUEST FOR ADDITIONAL INFORMATION REVISION TO BATTERY CAPACITY SURVEILLANCE REQUIREMENTS FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)
PERRY NUCLEAR POWER PLANT. UNIT NO. 1 DOCKET NO. 50-440
: 1. In Section 2.0 of the submittal dated November 24, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14328A665), FENOC states:
[i]f the DC [direct current] batteries are the only available power source, the maintenance tie circuit breaker may be closed to allow the Unit 1 and Unit 2 [Class 1E] batteries to be paralleled.
Address whether the impact of paralleling the Units 1 and 2 Class 1 E batteries, such as contribution of additional short circuit current from the Unit 2 batteries, protection coordination, and protective devices ratings among other factors has been considered in the design of Unit 1, 125 volts DC system.
Enclosure
 
ML15096A051                                            NRR-106 OFFICE LPLll-2/PM LPLlll-2/LA         EE EB/BC                 LPLI 11-2/BC NAME     EBrown       SRorher         JZimmeman by memo         TTate DATE       4/6/15         4/6/15       3/17 /15                   4/13/15}}

Latest revision as of 14:22, 31 October 2019

Unit, No. 1 - Request for Additional Information Concerning Battery Surveillance Test Frequencies
ML15096A051
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 04/13/2015
From: Ellen Brown
Plant Licensing Branch III
To: Harkness E
FirstEnergy Nuclear Operating Co
Eva Brown, NRR/DORL
References
L-14-271, TAC MF5298
Download: ML15096A051 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

!µil 13, 2015 Mr. Ernest J. Harkness Site Vice President FirstEnergy Nuclear Operating Company Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT NO. 1 - REQUEST FOR ADDITIONAL INFORMATION CONCERNING BATTERY SURVEILLANCE TEST FREQUENCIES (TAC NO. MF5298)(L-14-271)

Dear Mr. Harkness:

By application dated November 24, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14328A665), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted a license amendment request for the Perry Nuclear Power Plant. The proposed amendment is intended to revise the battery capacity testing surveillance requirements in the technical specification to reflect test requirements when the battery is near end of life. The U.S. Nuclear Regulatory Commission (NRC) staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure. During a discussion with Mr. Phil Lashley of your staff on April 1, 2015, it was agreed that FENOC would provide a response within 30 days from the date this letter is electronically distributed The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources.

E. Harkness Should circumstances result in the need to revise the requested response date, please contact me at (301) 415-2315.

Sincerely,

!RAJ Eva A. Brown, Senior Project Manager Plant Licensing 111-2 and Planning and Analysis Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-440

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv

REQUEST FOR ADDITIONAL INFORMATION REVISION TO BATTERY CAPACITY SURVEILLANCE REQUIREMENTS FIRSTENERGY NUCLEAR OPERATING COMPANY (FENOC)

PERRY NUCLEAR POWER PLANT. UNIT NO. 1 DOCKET NO. 50-440

1. In Section 2.0 of the submittal dated November 24, 2014 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14328A665), FENOC states:

[i]f the DC [direct current] batteries are the only available power source, the maintenance tie circuit breaker may be closed to allow the Unit 1 and Unit 2 [Class 1E] batteries to be paralleled.

Address whether the impact of paralleling the Units 1 and 2 Class 1 E batteries, such as contribution of additional short circuit current from the Unit 2 batteries, protection coordination, and protective devices ratings among other factors has been considered in the design of Unit 1, 125 volts DC system.

Enclosure

ML15096A051 NRR-106 OFFICE LPLll-2/PM LPLlll-2/LA EE EB/BC LPLI 11-2/BC NAME EBrown SRorher JZimmeman by memo TTate DATE 4/6/15 4/6/15 3/17 /15 4/13/15