IR 05000133/2015009: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 08/20/2015
| issue date = 08/20/2015
| title = IR 05000133/2015009, on 07/21-23/2015, Humboldt Bay, NRC Inspection Report
| title = IR 05000133/2015009, on 07/21-23/2015, Humboldt Bay, NRC Inspection Report
| author name = Kellar R L
| author name = Kellar R
| author affiliation = NRC/RGN-IV/DNMS/RSFSB
| author affiliation = NRC/RGN-IV/DNMS/RSFSB
| addressee name = Halpin E D
| addressee name = Halpin E
| addressee affiliation = Pacific Gas & Electric Co
| addressee affiliation = Pacific Gas & Electric Co
| docket = 05000133
| docket = 05000133
| license number = DPR-007
| license number = DPR-007
| contact person = Brookhart L E
| contact person = Brookhart L
| document report number = IR 2015009
| document report number = IR 2015009
| document type = Inspection Report, Letter
| document type = Inspection Report, Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:August 20, 2015 Mr. Edward D. Halpin, Senior Vice President
{{#Wiki_filter:ust 20, 2015
& Chief Nuclear Officer Pacific Gas and Electric Company P. O. Box 3 Mail Code 104/6/601


Avila Beach, C A 93424 SUBJECT: NR C INSPECTION REPORT 050
==SUBJECT:==
-00133/15-00 9 Dear Mr. Halpin
NRC INSPECTION REPORT 050-00133/15-009
:
 
This letter refers to the inspection conducted on July 2 1 - 23 , 201 5 , at your permanently shut down Humbol dt Bay Power Plant, Unit 3 facility in Eureka, Californi The purpose of the inspection was to determine whether decommissioning activities were being conducted safely and in conformance with the U.S. Nuclear Regulatory Commission (NRC) requirement The results of the inspection were discussed with members of your staff at the conclusion of the onsite inspection on July 23, 201 During this inspection, NRC staff examin ed activities conducted under your license as they relate to public health and safety to confirm compliance with the Commission's rules and regulations
==Dear Mr. Halpin:==
, and with the conditions of your l icens Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personne The enclosed report presents the results of this inspectio No violations were identified and no response to this letter is require In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's documents system (ADAMS), accessible from the NRC's Web site at https://www.nrc.gov/reading
This letter refers to the inspection conducted on July 21 - 23, 2015, at your permanently shut down Humboldt Bay Power Plant, Unit 3 facility in Eureka, California. The purpose of the inspection was to determine whether decommissioning activities were being conducted safely and in conformance with the U.S. Nuclear Regulatory Commission (NRC) requirements. The results of the inspection were discussed with members of your staff at the conclusion of the onsite inspection on July 23, 2015.
-rm/adams.htm To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redactio UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011
 
-4511 E. Halpin -2- Should you have any questions concerning this inspection, please contact Dr. Gerald Schlapper, Health Physicist
During this inspection, NRC staff examined activities conducted under your license as they relate to public health and safety to confirm compliance with the Commissions rules and regulations, and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel. The enclosed report presents the results of this inspection. No violations were identified and no response to this letter is required.
, at 817-200-1273 or the undersigned at 817
 
-200-119
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs documents system (ADAMS), accessible from the NRCs Web site at https://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction. Should you have any questions concerning this inspection, please contact Dr. Gerald Schlapper, Health Physicist, at 817-200-1273 or the undersigned at 817-200-1191.


Sincerely,
Sincerely,
/RA by L ee Brookhart Acting For/
/RA by Lee Brookhart Acting For/
Ray L. Kellar, P. E.
Ray L. Kellar, P. E., Chief Repository and Spent Fuel Safety Branch Division of Nuclear Materials Safety Docket No: 050-00133 License No: DPR-7 Enclosure:
NRC Inspection Report 050-00133/15-009 cc: See next page
 
cc:
Thomas R. Baldwin, Regulatory Services Steven Hsu, M.S., Senior Health Physicist Manager, Diablo Canyon and Humboldt Bay Radiological Assessment Unit Power Plant  Radioactive Material Licensing Section Pacific Gas and Electric Company Radiologic Health Branch P.O. Box 56  Dept. of Health Services, MS-7610 Avila Beach, CA 93424  Sacramento, CA 95899-7414 Jennifer L. Post, Esq. Gretchen Dumas, Esq.


, Chief Repository and Spent Fuel Safety Branch Division of Nuclear Materials Safety Docket No: 050-00133 License No: DPR-7 Enclosure:
Pacific Gas and Electric Company Public Utilities Commission P.O. Box 7442  of the State of California San Francisco, CA 94120  5066 State Building San Francisco, CA 94102 Loren Sharp, Director and Plant Manager Humboldt Bay Power Plant, PG&E Director 1000 King Salmon Avenue  Energy Facilities Siting Division Eureka, CA 95505  Energy Resources Conservation
NRC Inspection Report 050
  & Development Commission Chairman  1516 9th Street Humboldt County Board of Supervisors Sacramento, CA 95814 County Courthouse 825 Fifth Street  Redwood Alliance Eureka, CA 95501  P.O. Box 293 Arcata, CA 95521 Law Office of Linda J. Brown, Esq.
-00133/15-00 9 cc: See next page


cc: Thomas
999 5th Avenue, Suite 430 Dr. Robert B. Weisenmiller, Chair San Rafael, CA 94901  California Energy Commission 1516 Ninth Street (MS 34)
Regional Radiation Representative Sacramento, CA 95814 U.S. Environmental Protection Agency Region IX Office  California Public Utilities Commission 75 Hawthorne Street  505 Van Ness, Room 4102 San Francisco, CA 94105  San Francisco, CA 94102 Dr. James F. Davis, State Geologist Deputy Attorney General Department of Conservation State of California Division of Mines and Geology 110 West A Street, Suite 700 801 K Street MS 12-30  San Diego, CA 92101 Sacramento, CA 95814-3531 Director, Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7474
}}
}}

Latest revision as of 07:41, 31 October 2019

IR 05000133/2015009, on 07/21-23/2015, Humboldt Bay, NRC Inspection Report
ML15232A138
Person / Time
Site: Humboldt Bay
Issue date: 08/20/2015
From: Ray Kellar
NRC/RGN-IV/DNMS/RSFSB
To: Halpin E
Pacific Gas & Electric Co
Brookhart L
References
IR 2015009
Download: ML15232A138 (13)


Text

ust 20, 2015

SUBJECT:

NRC INSPECTION REPORT 050-00133/15-009

Dear Mr. Halpin:

This letter refers to the inspection conducted on July 21 - 23, 2015, at your permanently shut down Humboldt Bay Power Plant, Unit 3 facility in Eureka, California. The purpose of the inspection was to determine whether decommissioning activities were being conducted safely and in conformance with the U.S. Nuclear Regulatory Commission (NRC) requirements. The results of the inspection were discussed with members of your staff at the conclusion of the onsite inspection on July 23, 2015.

During this inspection, NRC staff examined activities conducted under your license as they relate to public health and safety to confirm compliance with the Commissions rules and regulations, and with the conditions of your license. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel. The enclosed report presents the results of this inspection. No violations were identified and no response to this letter is required.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response, if you choose to provide one, will be made available electronically for public inspection in the NRC Public Document Room or from the NRCs documents system (ADAMS), accessible from the NRCs Web site at https://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response should not include any personal privacy, proprietary, or safeguards information so that it can be made available to the public without redaction. Should you have any questions concerning this inspection, please contact Dr. Gerald Schlapper, Health Physicist, at 817-200-1273 or the undersigned at 817-200-1191.

Sincerely,

/RA by Lee Brookhart Acting For/

Ray L. Kellar, P. E., Chief Repository and Spent Fuel Safety Branch Division of Nuclear Materials Safety Docket No: 050-00133 License No: DPR-7 Enclosure:

NRC Inspection Report 050-00133/15-009 cc: See next page

cc:

Thomas R. Baldwin, Regulatory Services Steven Hsu, M.S., Senior Health Physicist Manager, Diablo Canyon and Humboldt Bay Radiological Assessment Unit Power Plant Radioactive Material Licensing Section Pacific Gas and Electric Company Radiologic Health Branch P.O. Box 56 Dept. of Health Services, MS-7610 Avila Beach, CA 93424 Sacramento, CA 95899-7414 Jennifer L. Post, Esq. Gretchen Dumas, Esq.

Pacific Gas and Electric Company Public Utilities Commission P.O. Box 7442 of the State of California San Francisco, CA 94120 5066 State Building San Francisco, CA 94102 Loren Sharp, Director and Plant Manager Humboldt Bay Power Plant, PG&E Director 1000 King Salmon Avenue Energy Facilities Siting Division Eureka, CA 95505 Energy Resources Conservation

& Development Commission Chairman 1516 9th Street Humboldt County Board of Supervisors Sacramento, CA 95814 County Courthouse 825 Fifth Street Redwood Alliance Eureka, CA 95501 P.O. Box 293 Arcata, CA 95521 Law Office of Linda J. Brown, Esq.

999 5th Avenue, Suite 430 Dr. Robert B. Weisenmiller, Chair San Rafael, CA 94901 California Energy Commission 1516 Ninth Street (MS 34)

Regional Radiation Representative Sacramento, CA 95814 U.S. Environmental Protection Agency Region IX Office California Public Utilities Commission 75 Hawthorne Street 505 Van Ness, Room 4102 San Francisco, CA 94105 San Francisco, CA 94102 Dr. James F. Davis, State Geologist Deputy Attorney General Department of Conservation State of California Division of Mines and Geology 110 West A Street, Suite 700 801 K Street MS 12-30 San Diego, CA 92101 Sacramento, CA 95814-3531 Director, Radiologic Health Branch State Department of Health Services P.O. Box 997414 (MS 7610)

Sacramento, CA 95899-7474