| issue date = 05/17/2016
| issue date = 05/17/2016
| title = NRC Security Baseline Inspection Report 05000237/2016201; 05000249/2016201
| title = NRC Security Baseline Inspection Report 05000237/2016201; 05000249/2016201
| author name = Cardenas D, Johnson R C
| author name = Cardenas D, Johnson R
| author affiliation = NRC/NSIR/DSO/DDSO/SPEB
| author affiliation = NRC/NSIR/DSO/DDSO/SPEB
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000237, 05000249
| docket = 05000237, 05000249
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:May 17, 2016
{{#Wiki_filter:==SUBJECT:==
DRESDEN NUCLEAR POWER STATION, UNITS 2 & 3 - NRC SECURITY INSPECTION REPORT 05000237/2016201; 05000249/2016201


Mr. Bryan , Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
==Dear Mr. Hanson:==
Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 & 3
On April 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Station, Units 2 & 3. On April 12, 2016, the NRC inspectors discussed the results of this inspection with Mr. Peter Karaba and members of his staff. Inspectors documented the results of this inspection in the enclosed inspection report.
- NRC SECURITY INSPECTION REPORT 05000237/2016 201; 05000249/2016201
 
==Dear M r. Hanson:==
On April 8 , 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Station, Units 2 & 3. On April 12, 2016 , the NRC inspectors discussed the results of this inspection with Mr. Peter Karaba and members of his staff. Inspectors documented the results of this inspection in the enclosed inspection report.


NRC inspectors documented one finding of very low security significance (Green) in this report.
NRC inspectors documented one finding of very low security significance (Green) in this report.
Line 31: Line 28:
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.


If you contest th is violation or the significance of this NCV you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
If you contest this violation or the significance of this NCV you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Dresden Nuclear Power Station, Units 2 & 3. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Request for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Document Control Desk, Washington DC 20555
-0001; with copies to the Regional Administrator
, Region II I; the Director, Office of Nuclear Security and Incident Response
; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555
-0001; and the NRC resident inspector at the Dresden Nuclear Power Station, Units 2 & 3
. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Request for Withholding," of the NRC'
s "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC
's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).


The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21
The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -
, "Protection of Safeguards Information
Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)
: Performance Requirements," and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC'
and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
s ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security
-Related Information
- Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response
.  


Sincerely,
Sincerely,
/RA/
/RA/
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No s. 50-237 & 50-249 License No s. DPR-19 & DPR-25 Nonpublic Enclosure:
Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-237 & 50-249 License Nos. DPR-19 & DPR-25 Nonpublic Enclosure: Inspection Report 05000237/2016201; 05000249/2016201 w/Attachments: Supplemental Information cc w/ enclosure: L. Antos P. Karaba ML16116A309 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RIII NSIR/DSO/SPEB NAME T. Barry J. Clark J. Berry S. Orth R. Johnson DATE 4 / 25 /16 5/11/16 4 / 27 /16 4/ 28 /16 5/17 /16
 
==Inspection Report==
05000 237/201 6 201; 05000249/2016201 w/Attachments: Supplemental Information cc w/ enclosure: L. Antos P. Karaba  
 
ML16116A309 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RIII NSIR/DSO/SPEB NAME T. Barry J. Clark J. Berry S. Orth R. Johnson DATE 4 / 25 /1 6 5/11/1 6 4 / 27 /1 6 4/ 28 /1 6 5/17 /1 6
}}
}}

Latest revision as of 20:17, 30 October 2019

NRC Security Baseline Inspection Report 05000237/2016201; 05000249/2016201
ML16116A309
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 05/17/2016
From: Cardenas D, Rachel Johnson
NRC/NSIR/DSO/DDSO/SPEB
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
T. Barry
References
IR 2016201
Download: ML16116A309 (3)


Text

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 & 3 - NRC SECURITY INSPECTION REPORT 05000237/2016201; 05000249/2016201

Dear Mr. Hanson:

On April 8, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Station, Units 2 & 3. On April 12, 2016, the NRC inspectors discussed the results of this inspection with Mr. Peter Karaba and members of his staff. Inspectors documented the results of this inspection in the enclosed inspection report.

NRC inspectors documented one finding of very low security significance (Green) in this report.

This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest this violation or the significance of this NCV you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC resident inspector at the Dresden Nuclear Power Station, Units 2 & 3. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Request for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21, Protection of Safeguards Information: Performance Requirements, and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRCs ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information -

Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1)

and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-237 & 50-249 License Nos. DPR-19 & DPR-25 Nonpublic Enclosure: Inspection Report 05000237/2016201; 05000249/2016201 w/Attachments: Supplemental Information cc w/ enclosure: L. Antos P. Karaba ML16116A309 OFFICE NSIR/DSO/SPEB NSIR/DSO NSIR/DSO/SPEB RIII NSIR/DSO/SPEB NAME T. Barry J. Clark J. Berry S. Orth R. Johnson DATE 4 / 25 /16 5/11/16 4 / 27 /16 4/ 28 /16 5/17 /16