| Q | CCA | Title |
---|
05000237/FIN-2015003-01 | 2015Q3 | | Failure to Evaluate the Available Net Positive Suction Head for the Diesel Generator Cooling Water Pumps Following a Dam Failure |
05000237/FIN-2015003-02 | 2015Q3 | H.6 | Failure to Perform Ultimate Heat Sink Surveys in Accordance With Quality Assurance Program |
05000249/FIN-2015003-03 | 2015Q3 | H.5 | Failure to Post Protected Pathway Signs |
05000237/FIN-2015004-01 | 2015Q4 | H.14 | Failure to Maintain Design Control of Secondary Containment Interlock Doors |
05000237/FIN-2016001-01 | 2016Q1 | H.9 | Failure to Maintain Design Control of the 2/3 Emergency Diesel Generator |
05000237/FIN-2016002-01 | 2016Q2 | H.1 | Failure to Implement and Maintain Written Procedures Regarding Breathing Air Quality Testing |
05000237/FIN-2016201-01 | 2016Q2 | | Security |