| title = Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301)
| title = Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301)
| author name = Guthrie E F
| author name = Guthrie E
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Stoddard D G
| addressee name = Stoddard D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000280, 05000281
| docket = 05000280, 05000281
Line 15: Line 15:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000280/2017301]]
See also: [[see also::IR 05000280/2017301]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
                                  NUCLEAR REGULATORY COMMISSION
  March 31, 2017  
                                                REGION II
  Mr. Daniel G. Stoddard  
                              245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Senior Vice President and
                                      ATLANTA, GEORGIA 30303-1257
    Chief Nuclear Officer  
                                          March 31, 2017
Innsbrook Technical Center  
Mr. Daniel G. Stoddard
5000 Dominion Blvd.  
Senior Vice President and
Glen Allen, VA 23060-6711  
  Chief Nuclear Officer
Innsbrook Technical Center
5000 Dominion Blvd.
SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR
Glen Allen, VA 23060-6711
  INITIAL EXAMINATION (05000280/2017301 AND 05000281/2017301)  
SUBJECT:       SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR
Dear Mr. Stoddard:  
                INITIAL EXAMINATION (05000280/2017301 AND 05000281/2017301)
Dear Mr. Stoddard:
During a telephone conversation on March 29, 2017, between Mr. Richard Philpot, Initial
License Training & Simulator Supervisor, Mr. Mike Meyer, Lead Exam Writer, Mr. Paul Orrison,
Exam Writer, and Mr. Michael Donithan, Operations Engineer, arrangements were made for the
administration of licensing examinations at the Surry Power Station. The on-site preparatory
week is scheduled for the week of October 2, 2017. The operating test is scheduled to be
administered during the weeks of October 30 and November 6, 2017. The written examination
is scheduled to be administered the week of November 6, 2017.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examinations based on the guidelines in Revision 11 of NUREG-1021, "Operator
Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline and the supporting reference materials identified in Attachment 3 to ES-201 by June 2,
2017. Mr. Donithan provided the written examination outline to your staff in November, 2016.
The operating tests, written examinations, and supporting reference materials identified in
Attachment 3 to ES-201 will be due by August 16, 2017. Pursuant to Title 10, Section
55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outlines, examinations, and tests before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.


D. Stoddard                                  2
During a telephone conversation on March 29, 2017, between Mr. Richard Philpot, Initial
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the NRC takes
licensing action on all the applicants and any adjudicatory actions on any hearing demands are
complete.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) approval number 3150-0090), at least 60 days before the first examination
date (if possible). Contact Mr. Donithan to determine the method for submission of waiver or
excusal requests. Preliminary reactor operator and senior reactor operator license applications
(OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024)
should be submitted at least 30 days before the first examination date. If the preliminary
applications are not received at least 30 days before the examination date, a postponement
may be necessary. Final signed applications certifying that all training has been completed and
requesting any waivers or excusals, as applicable, should be submitted at least 14 days before
the first examination date.
Although the guideline for receiving waiver or excusal requests calls for at least 30 days before
the first examination date (preliminary) and 14 days before the first examination date (final), the
requests should be submitted as early as possible in the process (see the 60-day guideline
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.
Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form
398, Personal Qualifications Statement - Licensee, or as directed by Mr. Donithan when
contacting him to determine the method for submission). The NRC will document its final
decision on whether to grant a waiver or excusal on the final (not preliminary) NRC form 398
submitted for the applicant. The NRC will not provide its decision until the final application is
submitted to the agency.
Paperwork Reduction Act Statement
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018.
The burden to the public for these voluntary information collections is estimated to average
2,250 hours per response, including the time for reviewing instructions, searching existing data
sources, gathering and maintaining the data needed, and completing and reviewing the
information collections. You may submit comments on any aspect of the information collections,
including suggestions for reducing the burden, to FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information
and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,
Washington, DC 20503.


License Training & Simulator Supervisor, Mr. Mike Meyer, Lead Exam Writer, Mr. Paul Orrison, Exam Writer, and Mr. Michael Donithan, Operations Engineer, arrangements were made for the administration of licensing examinations at the Surry Power Station. The on-site preparatory week is scheduled for the week of October 2, 2017. The operating test is scheduled to be
D. Stoddard                                    3
administered during the weeks of October 30 and November 6, 2017. The written examination
Public Protection Notification
is scheduled to be administered the week of November 6, 2017.  
The NRC may not conduct nor sponsor, and a person is not required to respond to, a collection
of information unless the document requesting or requiring the collection displays a currently
valid OMB control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
of the agencys Rules of Practice, a copy of this letter and its enclosures will be available
electronically for public inspection in the NRC Public Document Room or from the Publicly
Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is
accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public
Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Mike Donithan at (404) 997-4538,
(Michael.Donithan@nrc.gov), or me at (404) 997-4662, (Eugene.Guthrie@nrc.gov).
                                              Sincerely,
                                              /RA/
                                              Eugene F. Guthrie, Chief
                                                Operations Branch 2
                                                Division of Reactor Safety
Docket Nos.: 50-280, 50-281
License Nos.: DPR-32, DPR-37
cc: Distribution via Listserv


As agreed during the telephone conversation, your staff will prepare both the operating test and written examinations based on the guidelines in Revision 11 of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss
with your staff any changes that might be necessary before the examinations are administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline and the supporting reference materials identified in Attachment 3 to ES-201 by June 2,
2017.  Mr. Donithan provided the written examination outline to your staff in November, 2016. 
The operating tests, written examinations, and supporting reference materials identified in Attachment 3 to ES-201 will be due by August 16, 2017.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outlines, examinations, and tests before
they are submitted to the NRC for review and approval.  All materials shall be complete and


ready-to-use. 
_________________________             SUNSI REVIEW COMPLETE   FORM 665 ATTACHED
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in
OFFICE           RII:DRS       RII:DRS
receiving the required examination and reference materials, or the submittal of inadequate or
SIGNATURE         RSB2 for MGD1 GXG
incomplete materials, may cause the examinations to be rescheduled. 
NAME             DONITHAN       GUTHRIE
D. Stoddard 2
DATE                 3/31/2017     3/31/2017
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
E-MAIL COPY?         YES   NO   YES     NO YES   NO     YES   NO   YES     NO   YES   NO   YES   NO
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the NRC takes
licensing action on all the applicants and any adjudicatory actions on any hearing demands are
complete.
 
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator waiver or excusal requests (if any) (Office of Management
and Budget (OMB) approval number 3150-0090), at least 60 days before the first examination date (if possible).  Contact Mr. Donithan to determine the method for submission of waiver or excusal requests.  Preliminary reactor operator and senior reactor operator license applications
(OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024) should be submitted at least 30 days before the first examination date.  If the preliminary applications are not received at least 30 days before the examination date, a postponement may be necessary.  Final signed applications certifying that all training has been completed and requesting any waivers or excusals, as applicable, should be submitted at least 14 days before
 
the first examination date.
 
Although the guideline for receiving waiver or excusal requests calls for at least 30 days before
 
the first examination date (preliminary) and 14 days before the first examination date (final), the requests should be submitted as early as possible in the process (see the 60-day guideline
above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding. Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form
398, "Personal Qualifications Statement - Li
censee," or as directed by Mr. Donithan when contacting him to determine the method for submission).  The NRC will document its final decision on whether to grant a waiver or excusal on the final (not preliminary) NRC form 398
submitted for the applicant.  The NRC will not provi
de its decision until the final application is
submitted to the agency.
 
Paperwork Reduction Act Statement
This letter contains information collections that are subject to the
Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018.
 
The burden to the public for these voluntary information collections is estimated to average 2,250 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the
information collections.  You may submit comments on any aspect of the information collections,
including suggestions for reducing the burden, to FOIA, Privacy and Information Collections
Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
 
 
D. Stoddard 3
Public Protection Notification
The NRC may not conduct nor sponsor, and a person is not required to respond to, a collection
of information unless the document requesting or requiring the collection displays a currently
valid OMB control number.
 
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
of the agency's "Rules of Practice," a copy of this letter and its enclosures will be available
electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter.  Mr. Philpot has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Mike Donithan at (404) 997-4538,
(Michael.Donithan@nrc.gov), or me at (404) 997-4662, (Eugene.Guthrie@nrc.gov
).  Sincerely,             /RA/  Eugene F. Guthrie, Chief      Operations Branch 2
      Division of Reactor Safety
Docket Nos.: 50-280, 50-281
License Nos.: DPR-32, DPR-37
 
cc:  Distribution via Listserv
 
 
_________________________  SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS     SIGNATURE RSB2 for MGD1 GXG     NAME DONITHAN GUTHRIE     DATE 3/31/2017 3/31/2017     E-MAIL COPY?     YES NO       YES NO       YES NO       YES NO       YES NO       YES NO       YES NO
}}
}}

Latest revision as of 05:09, 30 October 2019

Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301)
ML17090A456
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/31/2017
From: Eugene Guthrie
Division of Reactor Safety II
To: Stoddard D
Virginia Electric & Power Co (VEPCO)
References
50-280/17-01, 50-281/17-01 50-280/OL-17, 50-281/OL-17
Download: ML17090A456 (4)


See also: IR 05000280/2017301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

March 31, 2017

Mr. Daniel G. Stoddard

Senior Vice President and

Chief Nuclear Officer

Innsbrook Technical Center

5000 Dominion Blvd.

Glen Allen, VA 23060-6711

SUBJECT: SURRY POWER STATION - NOTIFICATION OF LICENSED OPERATOR

INITIAL EXAMINATION (05000280/2017301 AND 05000281/2017301)

Dear Mr. Stoddard:

During a telephone conversation on March 29, 2017, between Mr. Richard Philpot, Initial

License Training & Simulator Supervisor, Mr. Mike Meyer, Lead Exam Writer, Mr. Paul Orrison,

Exam Writer, and Mr. Michael Donithan, Operations Engineer, arrangements were made for the

administration of licensing examinations at the Surry Power Station. The on-site preparatory

week is scheduled for the week of October 2, 2017. The operating test is scheduled to be

administered during the weeks of October 30 and November 6, 2017. The written examination

is scheduled to be administered the week of November 6, 2017.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examinations based on the guidelines in Revision 11 of NUREG-1021, "Operator

Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline and the supporting reference materials identified in Attachment 3 to ES-201 by June 2,

2017. Mr. Donithan provided the written examination outline to your staff in November, 2016.

The operating tests, written examinations, and supporting reference materials identified in

Attachment 3 to ES-201 will be due by August 16, 2017. Pursuant to Title 10, Section

55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outlines, examinations, and tests before

they are submitted to the NRC for review and approval. All materials shall be complete and

ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

D. Stoddard 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the NRC takes

licensing action on all the applicants and any adjudicatory actions on any hearing demands are

complete.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator waiver or excusal requests (if any) (Office of Management

and Budget (OMB) approval number 3150-0090), at least 60 days before the first examination

date (if possible). Contact Mr. Donithan to determine the method for submission of waiver or

excusal requests. Preliminary reactor operator and senior reactor operator license applications

(OMB control number 3150-0090) and medical certifications (OMB control number 3150-0024)

should be submitted at least 30 days before the first examination date. If the preliminary

applications are not received at least 30 days before the examination date, a postponement

may be necessary. Final signed applications certifying that all training has been completed and

requesting any waivers or excusals, as applicable, should be submitted at least 14 days before

the first examination date.

Although the guideline for receiving waiver or excusal requests calls for at least 30 days before

the first examination date (preliminary) and 14 days before the first examination date (final), the

requests should be submitted as early as possible in the process (see the 60-day guideline

above). Resolutions resulting from verbal inquiries by the licensee to the NRC are not binding.

Submittals addressing waivers or excusals, or both, should be in writing (i.e., using NRC Form

398, Personal Qualifications Statement - Licensee, or as directed by Mr. Donithan when

contacting him to determine the method for submission). The NRC will document its final

decision on whether to grant a waiver or excusal on the final (not preliminary) NRC form 398

submitted for the applicant. The NRC will not provide its decision until the final application is

submitted to the agency.

Paperwork Reduction Act Statement

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018.

The burden to the public for these voluntary information collections is estimated to average

2,250 hours0.00289 days <br />0.0694 hours <br />4.133598e-4 weeks <br />9.5125e-5 months <br /> per response, including the time for reviewing instructions, searching existing data

sources, gathering and maintaining the data needed, and completing and reviewing the

information collections. You may submit comments on any aspect of the information collections,

including suggestions for reducing the burden, to FOIA, Privacy and Information Collections

Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

electronic mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information

and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget,

Washington, DC 20503.

D. Stoddard 3

Public Protection Notification

The NRC may not conduct nor sponsor, and a person is not required to respond to, a collection

of information unless the document requesting or requiring the collection displays a currently

valid OMB control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the agencys Rules of Practice, a copy of this letter and its enclosures will be available

electronically for public inspection in the NRC Public Document Room or from the Publicly

Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is

accessible from the NRC Website at http://www.nrc.gov/reading-rm.adams.html (the Public

Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Philpot has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Mike Donithan at (404) 997-4538,

(Michael.Donithan@nrc.gov), or me at (404) 997-4662, (Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief

Operations Branch 2

Division of Reactor Safety

Docket Nos.: 50-280, 50-281

License Nos.: DPR-32, DPR-37

cc: Distribution via Listserv

_________________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED

OFFICE RII:DRS RII:DRS

SIGNATURE RSB2 for MGD1 GXG

NAME DONITHAN GUTHRIE

DATE 3/31/2017 3/31/2017

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO