ML17255A518: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:1 ATTACHMENT 3 ROC'" ST:-R GBZ:.-'~%)
{{#Wiki_filter:1 ATTACHMENT 3 ROC'" ST:-R GBZ:.-'~%) =:-C RIC CORPORATION QOM:"i =D G~iA   ST%~ ON COiVVROLLW COPY     '.ii~BW                           DAir '.-
=:-C RIC CORPORATION G~iA ST%~ON COiVVROLLW COPY'.ii~BW QOM:"i=D DAir'.-TIME:-PROCWUR='tO.<~l~tO 0 GINNA QUALITY ASSURANCE PROGRAM IMPLEMENTATION T=C-KC.Mi R~i".v Q.A.REVIEW Q.g a-y-~g PORC 5/29/79 0/C R" zx..~4 1 APPRO'7Z:.OR USE/z/wj P/i.~~'.iO:i'3k C%r QvR r~iH U~()i IVrlk r Ir I ROCK::-"C'~':.S a 4~l I~v r rrrr'ri~r I r7 I~Q~J~83iii50373 83ii04 PDR ADOCK 05000244 P PDR 44 1 A-101 GINNA QUALITY ASSURANCE PROGRAM IMPLEMENTATION
TIME:-
PROCWUR= 'tO.                                 <~l ~tO         0 GINNA QUALITY ASSURANCE PROGRAM IMPLEMENTATION T=C- KC.Mi R~i     ".v Q. A. REVIEW Q.g               a-y-~g PORC   5/29/79 0/C R" zx ..~
4 1
APPRO'7Z:.OR     USE
                                                                                  /z/wj P/
i.~~       '.iO:i '3k r~iH C% r QvR U~() iIr ROCK::- "C'~':.S             ~ r IVrlk    r      I                            4 ~l   I   ~ v r rrrr 'ri a I ~I r7                       Q ~
J     ~
83ii04 83iii50373 05000244 PDR ADOCK P                       PDR
 
4 4
1
 
A-101 GINNA QUALITY ASSURANCE PROGRAM IMPLEMENTATION


==1.0 PURPOSE==
==1.0 PURPOSE==
To provide instructions for the implementation of the Quality Assurance Program at Ginna Station.2.0 2.1 2.2 2.3 2.4
To provide instructions for the implementation of the Quality Assurance Program   at Ginna       Station.


==2.5 REFERENCES==
==2.REFERENCES==
:
:
Quality Assurance Manual, Appendix A.Quality Assurance Manual, Appendix D.Quality Control Procedure, A-501.Quality Control Procedure, A-502.Quality Control Procedure A-203.3.0 INSTRUCTIONS:
2.1  Quality Assurance Manual, Appendix         A.
3.1 The Ginna Qualtiy Assurance Program requirements as outlined in the Quality Assurance Manual shall be implemented through plant administra-tive procedures.
2.2  Quality Assurance Manual, Appendix         D.
3.1.1 A1XX through A18XX series of administrative procedures parallel the eighteen sections of the Quality Assurance Manual.3.1.2 3.2 Administrative Procedures are developed and controlled in accordance with References 2.3 and.4.'he Quality Assurance Program at Ginna Station shall apply to activi-ties which affect the safety related functions of all existing Seismic Class I structures, systems, and components, including their founda-tions and supports.These structures, systems, and components shall be those designated in the Ginna Station FSAR and listed in Reference 2.1.3.2.1 In addition, the Quality Assurance Program at Ginna Station shall be applied to the portions of the fire protection program as listed in Reference 2.2.3.2.2 The Quality Assurance Program also applies to shipping of licensed radioactive materials as defined in 10 CFR 71.3.3 For activities associated with implementation of modifications at Ginna Station, the Ginna Station organization is complemented by the Ginna Modification Project Organization as described in Reference 2.5.The administrative procedure described in 3.1.1 shall be used, as applicable, to implement modification project activities.
2.3  Quality Control Procedure, A-501.
4.0 ((4.1 RECORDS: Noae}}
2.4  Quality Control Procedure, A-502.
2.5  Quality Control Procedure A-203.
 
==3.0 INSTRUCTIONS==
3.1   The Ginna Qualtiy Assurance Program requirements as outlined in the Quality Assurance Manual shall be implemented through plant administra-tive procedures.
3.1.1 A1XX through A18XX series of administrative procedures         parallel the eighteen sections of the Quality Assurance Manual.
3.1.2 Administrative Procedures are developed         and controlled in accordance with References 2.3 and     .4.'he 3.2        Quality Assurance Program at Ginna Station shall apply to activi-ties which affect the safety related functions of all existing Seismic Class I structures, systems, and components, including their founda-tions and supports. These structures, systems, and components shall be those designated in the Ginna Station FSAR and listed in Reference 2.1.
3.2.1 In addition, the Quality Assurance Program at Ginna Station shall be applied to the portions of the         fire protection program as listed in Reference 2.2.
3.2.2 The Quality Assurance Program also applies to shipping of licensed radioactive materials as defined in 10 CFR 71.
3.3   For activities associated with implementation of modifications at Ginna Station, the Ginna Station organization is complemented by the Ginna Modification Project Organization as described in Reference 2.5.
The administrative procedure described in 3.1.1 shall be used, as applicable, to implement modification project activities.
 
==4.0 RECORDS==
(( 4.1 Noae}}

Revision as of 19:46, 29 October 2019

Rev 0 to Procedure A-101, Ginna QA Program Implementation.
ML17255A518
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/02/1981
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17255A515 List:
References
A-101, NUDOCS 8311150373
Download: ML17255A518 (4)


Text

1 ATTACHMENT 3 ROC'" ST:-R GBZ:.-'~%) =:-C RIC CORPORATION QOM:"i =D G~iA ST%~ ON COiVVROLLW COPY '.ii~BW DAir '.-

TIME:-

PROCWUR= 'tO. <~l ~tO 0 GINNA QUALITY ASSURANCE PROGRAM IMPLEMENTATION T=C- KC.Mi R~i ".v Q. A. REVIEW Q.g a-y-~g PORC 5/29/79 0/C R" zx ..~

4 1

APPRO'7Z:.OR USE

/z/wj P/

i.~~ '.iO:i '3k r~iH C% r QvR U~() iIr ROCK::- "C'~':.S ~ r IVrlk r I 4 ~l I ~ v r rrrr 'ri a I ~I r7 Q ~

J ~

83ii04 83iii50373 05000244 PDR ADOCK P PDR

4 4

1

A-101 GINNA QUALITY ASSURANCE PROGRAM IMPLEMENTATION

1.0 PURPOSE

To provide instructions for the implementation of the Quality Assurance Program at Ginna Station.

2.0 REFERENCES

2.1 Quality Assurance Manual, Appendix A.

2.2 Quality Assurance Manual, Appendix D.

2.3 Quality Control Procedure, A-501.

2.4 Quality Control Procedure, A-502.

2.5 Quality Control Procedure A-203.

3.0 INSTRUCTIONS

3.1 The Ginna Qualtiy Assurance Program requirements as outlined in the Quality Assurance Manual shall be implemented through plant administra-tive procedures.

3.1.1 A1XX through A18XX series of administrative procedures parallel the eighteen sections of the Quality Assurance Manual.

3.1.2 Administrative Procedures are developed and controlled in accordance with References 2.3 and .4.'he 3.2 Quality Assurance Program at Ginna Station shall apply to activi-ties which affect the safety related functions of all existing Seismic Class I structures, systems, and components, including their founda-tions and supports. These structures, systems, and components shall be those designated in the Ginna Station FSAR and listed in Reference 2.1.

3.2.1 In addition, the Quality Assurance Program at Ginna Station shall be applied to the portions of the fire protection program as listed in Reference 2.2.

3.2.2 The Quality Assurance Program also applies to shipping of licensed radioactive materials as defined in 10 CFR 71.

3.3 For activities associated with implementation of modifications at Ginna Station, the Ginna Station organization is complemented by the Ginna Modification Project Organization as described in Reference 2.5.

The administrative procedure described in 3.1.1 shall be used, as applicable, to implement modification project activities.

4.0 RECORDS

(( 4.1 Noae