{{#Wiki_filter:CATEGORY REGULA-INFORMATION DISTRIBUTIO STEM (RIDS)ACCESSION NBR:9707080341 DOC.DATE: 97/07/01 NOTARIZED:
{{#Wiki_filter:CATEGORY REGULA-     INFORMATION DISTRIBUTIO         STEM (RIDS)
NO FACIE:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester ZpJT j"..AAME AUTHOR AFFILIATION WhaB'EL,G.
ACCESSION NBR:9707080341           DOC.DATE: 97/07/01     NOTARIZED:   NO         DOCKET  I FACIE:50-244 Robert Emmet Ginna Nuclear Plant,             Unit 1, Rochester     G 05000244 ZpJT j".. AAME         AUTHOR AFFILIATION WhaB'EL,G.             Rochester Gas & Electric   Corp.
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION DOCKET I G 05000244
RECIP.NAME             RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Revision 3 to"Technical Requirements.
Revision 3 to "Technical Requirements. Manual (TRM)."
Manual (TRM)." DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
DISTRIBUTION CODE: A001D         COPIES RECEIVED:LTR         ENCL       SIZE:
General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
TITLE:     OR Submittal: General Distribution                                               A NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).                   05000244 T
A 05000244 T INTERNAL: RECIPIENT ID CODE/NAME PDl-1 LA VISSING G.NRR MCB NRR/DSSA/SPLB NUDOCS-ABSTRACT COPIES LTTR ENCL 1.1 1 1 RECIPIENT ID CODE/NAME PD1-1 PD" NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 COPIES LTTR ENCL 1 1 1 0 0 R EXTERNAL: NOAC NRC PDR'--0 N NOTE TO ALL"RIDS" RECIPIENTS:
RECIPIENT        COPIES            RECIPIENT           COPIES ID CODE/NAME       LTTR ENCL       ID CODE/NAME       LTTR ENCL PDl-1 LA                            PD1-1 PD   "
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN SD-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OP'OPIES REQUIRED: LTTR'NCL 12 v~.;r~i" p.,r~~gn~~,y'ill t<'l(>~44%v4\
VISSING G.
t~~I OCHESTER GAS Ec ELECTRIC ORATION DISP261 DOCUMENT CONTROL Document Transmittal Transmittal:
0 INTERNAL:                                  1      NRR/DE/ECGB/A                 1 NRR      MCB              .1      NRR/DRCH/HICB                 1            R NRR/DSSA/SPLB                1      NRR/DSSA/SRXB                 1 NUDOCS-ABSTRACT              1      OGC/HDS3                       0 EXTERNAL: NOAC                                     NRC PDR'--
9706082N 073 Date: 06/28/1997 Holder: 1217 To: DOCUMENT CONTROL DESK US NRC ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 Doc Title Rev Rev Date Qty TECHNICAL REQUIREMENTS MANUAL FOR 003 07/01/1997 1 GINNA STATION Doc Id Receipt Acknowledgement and Action Taken: Signature Date Attention Document Control-49/3 Rochester Gas 8 Electric Corporation 89 East Avenue Rochester, New York 14649 Return to: llllllllllllllllllllllllllllllllllllllll, ,,9'707080341 97070i 6'PDR)ADQCK 05000244 P'PDR'ISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS.
0 N
REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE), AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH RM-RDM-1.
NOTE TO ALL "RIDS" RECIPIENTS:
Rochester Gas and Electric Corporation Inter-Office Correspondence June 24, 1997 SUB JECT: Technical Requirements Manual (TRM)Revision 3 TO: Distribution Attached is Revision 3 to the TRM.The following changes are included within this package ([ITS&#xb9;]refers to internal tracking number for all outstanding ITS related issues): Various pages listed the incorrect revision and were changed to Revision 3.Also, typographical errors were corrected.
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER       OP'OPIES REQUIRED: LTTR             'NCL     12
[ITS&#xb9;27]2.TR 3.3 4.Table TS 3.3.4-1, Functions 3a and 3c were revised to remove Note (a).This note stated that"there is one additional detector at each zone which is not required to be OPERABLE per this TR." For the two diesel generator rooms, there are in fact only two detectors such that this note did~n apply.[ITS&#xb9;28]A requirement for Instrument Bus D was added including Required Actions if it is inoperable and a new Surveillance Requirement.
 
This new requirement only addresses which LCO's must be either: (I)declared inoperable, or (2)evaluated for continued OPERABILITY if Instrument Bus D fails.This is a clarification only (ie., it is not new actions), The new Surveillance Requirement is consistent with those required for the other instrument buses.[ITS&#xb9;19]An error in TR 3.7.2 was corrected.
v ~.;r~i" p.,r~~gn~ ~,y
This TR was added to the TRM by Revision 1 based on information contained in the UFSAR'and Procedure A-52.4.1.Table I R 3.7.2-2 was taken from A-52.4.1 only (i.e., a similar table was~n previously in the UFSAR).Required Action B.3 and C.l were unintentionally added in the TRM if an item in Table TR 3,7.2-2 was inoperable, These required actions were never part of A-52.4.1 and have resulted in a NRC Special Report due to the Main Transformer sprinkler system being out of service for>14 days.This change removes Required Actions B.3 and C.1 from Table TR 3.7.2-2 in order to make the specified actions consistent with those prior to TRM Revision l.[ITS&#xb9;30]  
            'ill t<' l( >~44% v4
\
 
t~~
I DISP261                                  OCHESTER GAS Ec   ELECTRIC                     ORATION DOCUMENT CONTROL Document   Transmittal Transmittal:       9706082N 073 To: DOCUMENT CONTROL DESK                                                                          Date: 06/28/1997 US NRC                                                                                        Holder: 1217 ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON           DC 20555 BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS.                                REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE), AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH RM-RDM-1.
Doc Id                    Doc         Title                                                 Rev       Rev Date   Qty TECHNICAL REQUIREMENTS MANUAL FOR                                   003   07/01/1997     1 GINNA STATION PDR'ISTED Receipt Acknowledgement and Action Taken:
Signature                                                                             Date Return to:              Attention Document Control 49/3 Rochester Gas 8 Electric Corporation 89 East Avenue Rochester, New York               14649
        ,,9'707080341 97070i 6                           llllllllllllllllllllllllllllllllllllllll,
          'PDR )
                '
ADQCK 05000244 P
 
Rochester Gas and Electric Corporation Inter-Office Correspondence June 24, 1997 SUB JECT: Technical Requirements Manual (TRM) Revision           3 TO: Distribution Attached is Revision 3 to the TRM. The following changes are included within this package ([ITS &#xb9; ]refers to internal tracking number for all outstanding ITS related issues):
Various pages listed the incorrect revision and were changed to Revision 3.
Also, typographical errors were corrected. [ITS &#xb9;27]
: 2.       TR 3.3 4. Table TS 3.3.4-1, Functions 3a and 3c were revised to remove Note (a). This note stated that "there is one additional detector at each zone which is not required to be OPERABLE per this TR." For the two diesel generator rooms, there are in fact only two detectors such that this note did ~n apply.
[ITS &#xb9;28]
A requirement for Instrument Bus D was added including Required Actions ifit is inoperable and a new Surveillance Requirement. This new requirement only addresses which LCO's must be either: (I) declared inoperable, or (2) if evaluated for continued OPERABILITY Instrument Bus D fails. This is a clarification only (ie., it is not new actions), The new Surveillance Requirement is consistent with those required for the other instrument buses.
[ITS &#xb9;19]
An error in TR 3.7.2 was corrected. This TR was added to the TRM by Revision based on information contained in the UFSAR'and Procedure A-1 52.4.1. Table I R 3.7.2-2 was taken from A-52.4.1 only (i.e., a similar table was ~n previously in the UFSAR). Required Action B.3 and C.l were unintentionally added in the TRM if an item in Table TR 3,7.2-2 was inoperable, These required actions were never part of A-52.4.1         and have resulted in a NRC Special Report due to the Main Transformer           sprinkler system being out of service for > 14 days. This change removes         Required Actions B.3 and C. from Table TR 3.7.2-2 in order to make the 1                                              specified actions consistent with those prior to TRM Revision l. [ITS &#xb9;30]
 
"
"
5.A new requirement was added with respect to ATWS mitigation.
: 5.     A new requirement was added with respect to ATWS mitigation. Essentially, systems required to mitigate an ATWS event (i.e., beyond design basis accident) whose specific OPERABILITY requirements are not addressed by other LCOs or TRs were added. This includes the PORVs opening under automatic control, PORV block valves being open, rods capable of being manually inserted, and AMSAC. The inoperability of these systems can result in the inability to mitigate an ATWS event. Surveillance Requirements were also added for these systems consistent with current practices (i.e., no new surveillances to Ginna were added). [ITS &#xb9;31j A new requirement was added with respect to LTOP arming logic. Currently, LCO 3.4.12 requires the PORVs to be OPERABLE under LTOP conditions ifa minimum size RCS vent is not available. However, there are no specific requirements related to the LTOP actuation logic other than requiring a COT every 31 days and a CHANNEL CALIBRATION every 24 months (SR 3.4.12.6 and 3.4.12.8, respectively). The new requirement addresses the arming logic specifically and identifies required actions in the event the logic is inoperable. Also, a new Surveillance Requirement was added with respect to ACTUATION LOGIC TESTS.                   The new Required Actions and Surveillance Requirements ensure that the PORVs remain capable of performing their LTOP function. [ITS &#xb9;32]
Essentially, systems required to mitigate an ATWS event (i.e., beyond design basis accident)whose specific OPERABILITY requirements are not addressed by other LCOs or TRs were added.This includes the PORVs opening under automatic control, PORV block valves being open, rods capable of being manually inserted, and AMSAC.The inoperability of these systems can result in the inability to mitigate an ATWS event.Surveillance Requirements were also added for these systems consistent with current practices (i.e., no new surveillances to Ginna were added).[ITS&#xb9;31j A new requirement was added with respect to LTOP arming logic.Currently, LCO 3.4.12 requires the PORVs to be OPERABLE under LTOP conditions if a minimum size RCS vent is not available.
Two new sections were added to the TRM: (1) Design Features, and (2)
However, there are no specific requirements related to the LTOP actuation logic other than requiring a COT every 31 days and a CHANNEL CALIBRATION every 24 months (SR 3.4.12.6 and 3.4.12.8, respectively).
Administrative Controls. The first section is only a holding place for future design features issues (e.g., what equipment is credited in SBO). The second section contains administrative requirements that are to be imposed by Ginna Station management until a Technical Specification amendment can be approved by the NRC. These administrative requirements are expected to be consistent with Improved Standard Technical Specifications (i.e., NUREG-1431) and help to ensure that systems, structures, and components already addressed within ITS remain OPERABLE until the ITS can be permanently changed, These changes are considered effective July 1, 1997. Please contact Mark Flaherty (extension 8512) or Tom Harding (extension 8013) ifyou have any questions.
The new requirement addresses the arming logic specifically and identifies required actions in the event the logic is inoperable.
Mark D. Flaherty Attachments MDR930
Also, a new Surveillance Requirement was added with respect to ACTUATION LOGIC TESTS.The new Required Actions and Surveillance Requirements ensure that the PORVs remain capable of performing their LTOP function.[ITS&#xb9;32]Two new sections were added to the TRM: (1)Design Features, and (2)Administrative Controls.The first section is only a holding place for future design features issues (e.g., what equipment is credited in SBO).The second section contains administrative requirements that are to be imposed by Ginna Station management until a Technical Specification amendment can be approved by the NRC.These administrative requirements are expected to be consistent with Improved Standard Technical Specifications (i.e., NUREG-1431)and help to ensure that systems, structures, and components already addressed within ITS remain OPERABLE until the ITS can be permanently changed, These changes are considered effective July 1, 1997.Please contact Mark Flaherty (extension 8512)or Tom Harding (extension 8013)if you have any questions.
 
Mark D.Flaherty Attachments MDR930  
R.E. Ginna Nuclear Power Plant
" R.E.Ginna Nuclear Power Plant Technical Requirements Manual (TRM)Revision 3 A hm nt Please replace the following pages of your controlled copy of the ITS as follows:~VI me III III III III+g~in TRM TRM TRM Table of Contents TRM Table of Contents~R~mv Cover Page LEP-i Cover Page~LEP-i III III III III IIIIll III III III III III III III III TRM Chapter 3.3 TRM Chapter 3 3 TRM Chapter 3.3 TRM Chapter 3.3 TRM Chapter 3.4 TRM Chapter 3 4 TRM Chapter 3.4 TRM Chapter 3.4 TRM Chapter 3.4 TRM Chapter 3.4 TRM Chapter 3 4 TRM Chapter 3.7 TRM Chapter 3.7 TRM Chapter 3 8 TRM Chapter 3.8 TRM Chapter 4,0 TRM Chapter 5.0 TRM Chapter 5,0 3.3-11 3.7-7 3,7-10 3.3-11~3.3-15~3.3-16 3.4-8~3.4-9~~3.4-10 3,4-11+3.4-12~+3.4-13~3.4-14 3.7-10 3.8-2/~3.8-3 4.o-l~s.o-l~~5.0-2  
"                              Technical Requirements Manual (TRM)
Revision 3 A     hm nt Please replace the following pages of your controlled copy of the ITS as follows:
  ~VI me         +g~in                         ~R~mv III III TRM TRM Cover Page LEP-i Cover Page LEP-i
                                                                                  ~
III           TRM Table of Contents III           TRM Table of Contents III             TRM Chapter 3.3               3.3-11                3.3-11~
III            TRM Chapter 3 3                                      3.3-15~
III            TRM Chapter 3.3                                       3.3-16 III            TRM Chapter 3.3 III            TRM Chapter   3.4                                   3.4-8~
Ill            TRM Chapter   3 4                                   3.4-9~~
TRM Chapter   3.4                                    3.4-10 III            TRM Chapter   3.4                                    3,4-11+
III            TRM Chapter    3.4                                    3.4-12~+
III            TRM Chapter    3.4                                    3.4-13~
III            TRM Chapter    3 4                                   3.4-14 III            TRM Chapter 3.7                3.7-7 III            TRM Chapter 3.7                3,7-10                3.7-10 III            TRM Chapter 3 8                                      3.8-2/~
III            TRM Chapter 3.8 TRM Chapter 4,0 3.8-3 4.o-l ~
TRM Chapter 5.0                                      s.o-l ~~
TRM Chapter 5,0                                      5.0-2
 
'
'
GINNA STATION TRM Revision I TECHNICAL REQUIREMENTS MANUAL (TRM)esponsible Hanager<lR Effective Date Controlled Gopy No.~~d I l List of Effective Pages (TRM).Pa e Rev.Pa e.Rev.Pa e Rev.Pa e Rev.Section 1.0 TfN 1.0-1 0 Section 2.0 TRH 2.0-1 Section 3.0 TRH 3.0-1 1 Section 3.1 TRH 3.1-1 TfN 3.1-2 TRH 3.1-3 TRH 3.1-4 TRH 3.1-5 TfN 3.1-6 TfN 3.1-7 0 1 2 0 0 1 2 RM 3.3-1 fN 3.3-2 fN 3.3-3 RH 3.3-4 RM 3.3-5 RH 3.3-6 RH 3.3-7 RH 3.3-8 RM 3.3-9 RM 3.3-10 TfN 3.3-11 TRH 3.3-12 TRH 3.3-13 TRH 3.3-14 1 0 1 0 0 0 1 1 1 1 1 1 1 1 Section 3.2 TRH 3.2-1 0 Section 3.3 Section 3.4 TRH 3.4-1 TRH 3.4-2 TRH 3.4-3 TRH 3.4-4 TRH 3.4-5 TRH 3.4-6 TRH 3.4-7 Section 3.5 TRM 3.5-1 Section 3.6 TRM 3.6-1 Section 3.7 TRH 3.7-1 TRH 3.7-2 TRH 3.7-3 TRM 3.7-4 TRH 3.7-5 TRH 3.7-6 TRH 3.7-7 TRH 3.7-8 TRH 3,7-9 TRH 3.7-10 TRH 3.7-11 TRH 3.7-12 TRM 3.7-13 TRH 3.7-14 TRH 3.7-15 TRH 3.7-16 TRH 3.7-17 TRH 3.7-18 TfN 3.7-19 TfN 3.7-20 TRM 3.7-21 TRH 3.7-22 TRM 3.7-23 TRH 3.7-24 1 1 0 0 ,0.0 0 1 1 1 1 1 1 1'1'1 1 1 1 1 1 1 1 1'1 1 1 1 1 Section 3.8 TRH 3.8-1 0 Section 3.9 TRH 3.9-1 TRH 3.9-2 TRH 3.9-3 TRH 3.9-4 Gonna Station TRH LEP-i Revision 1 TABLE OF CONTENTS 1.0 USE AND APPLICATION
GINNA STATION               TRM Revision     I TECHNICAL REQUIREMENTS MANUAL (TRM) esponsible Hanager
....................
            < lR Effective Date Controlled Gopy No. ~~d
1.0-1 2.0 3.0 3.0 SAFETY LIMITS (SLs)LIMITING CONDITION FOR OPERATION (LCO)APPLICABILITY
 
.SURVEILLANCE REQUIREMENT (SR)APPLICABILITY 2.0-1 3.0-1 3.0-1 3.1 3.1.1 3.1.2 3.2 REACTIVITY CONTROL SYSTEMS.Boron Injection System-MODES 1, 2, 3, and 4.Boron Injection System-MODE 5.3.1-1 3.1-1 3.1-6 POWER DISTRIBUTION LIMITS...............
l I List of Effective     Pages (TRM)
3.2-1 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.4 3.4.1 3.4.2 3.5 3.6 INSTRUHENTATION Control Room Emergency Air Treatment System (CREATS)Instrumentation Circulating Water Flood Protection Instrumentation
  .Pa e       Rev.         Pa e   . Rev.         Pa e         Rev. Pa e   Rev.
.Movable In-Core Instrumentation Fire Detection Instrumentation
Section 3.4            Section 3.8 TRH 3.4-1           1 TRH  3.8-1        0 TRH 3.4-2            1 Section 1.0        TRH 3.4-3          0      Section 3.9 TRH 3.4-4          0 TfN 1.0-1            0  TRH 3.4-5        ,0. TRH   3.9-1 TRH  3.4-6           0  TRH  3.9-2 Section 2.0         TRH  3.4-7          0  TRH  3.9-3 TRH  3.9-4 TRH  2.0-1                  Section 3.5 Section 3.0        TRM  3.5-1 TRH  3.0-1          1      Section 3.6 Section 3.1        TRM  3.6-1 TRH  3.1-1        0      Section 3.7 TfN 3.1-2            1 TRH    3.1-3        2  TRH   3.7-1          1 TRH   3.1-4        0  TRH   3.7-2          1 TRH    3.1-5        0   TRH  3.7-3          1 TfN 3.1-6            1   TRM  3.7-4          1 TfN 3.1-7            2   TRH 3.7-5          1 TRH  3.7-6          1 Section 3.2        TRH 3.7-7          1 TRH   3.7-8        '1' TRH   3.2-1        0  TRH   3,7-9 TRH   3.7-10          1 Section 3.3        TRH   3.7-11        1 TRH   3.7-12        1 RM  3.3-1         1  TRM   3.7-13        1 fN 3.3-2        0    TRH  3.7-14        1 fN 3.3-3          1  TRH   3.7-15        1 RH 3.3-4         0    TRH   3.7-16        1 RM 3.3-5          0    TRH   3.7-17        1 RH 3.3-6          0    TRH   3.7-18        1' RH 3.3-7         1    TfN 3.7-19 RH 3.3-8          1    TfN 3.7-20          1 RM 3.3-9          1    TRM 3.7-21          1 RM 3.3-10        1    TRH 3.7-22          1 TfN 3.3-11          1    TRM 3.7-23          1 TRH 3.3-12          1    TRH 3.7-24          1 TRH 3.3-13          1 TRH 3.3-14          1 Gonna    Station  TRH                        LEP-i                            Revision 1
.REACTOR COOLANT SYSTEM (RCS)Reactor Vessel Head Vents RCS Chemistry EMERGENCY CORE COOLING SYSTEMS (ECCS)CONTAINMENT SYSTEMS 3.3-1 3.3-1 3~3 3 3.3-6 3~3 7 3.4-1 3.4-1 3.4-3 3.5-1 3.6-1 3.7 3.7.1 3.7.2 3.7.3 3.7.4 3.7.5 3.7.6 PLANT SYSTEMS Fire Suppression Water Sources.Fire Suppression Spray and Sprinkler Halon Systems Fire Hose Stations..Fire Barrier Penetration Seals.Fire Yard Loop.~~~~Systems 3.7-1 3.7-1 3.7-6 3.7-11 3.7-14 3.7-18 3.7-23 3.8 3.8.1 3.9 3.9.1 3.9.2 3.9.3 ELECTRICAL POWER SYSTEMS.Offsite Power Sources REFUELING OPERATIONS
 
.Fuel Storage in Spent Fuel Pool (SFP)Region Fuel Assembly Hovement in Auxiliary Building Refueling Manipulator Crane Interlocks
TABLE OF CONTENTS 1.0     USE AND APPLICATION    ....................                  1.0-1 2.0      SAFETY LIMITS    (SLs)                                        2.0-1 3.0      LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY .        3.0-1 3.0     SURVEILLANCE REQUIREMENT (SR) APPLICABILITY                    3.0-1 3.1          REACTIVITY CONTROL SYSTEMS .                             3.1-1 3.1.1              Boron Injection System-MODES 1, 2, 3, and 4 .       3.1-1 3.1.2              Boron Injection System-MODE 5 .                     3.1-6 3.2          POWER  DISTRIBUTION LIMITS   ...............             3. 2-1 3.3          INSTRUHENTATION                                          3.3-1 3.3.1             Control Room Emergency Air Treatment System (CREATS)
.2 3.8-1 3.8-1 3.9-1 3.9-1 3.9-2 3.9-4 Ginna Station TRH Revision Fire Detection Instrumentation TR 3.3.4 Table TR 3.3.4-1 (page 1 of 2)Fire Detection Instrumentation LOCATION REQUIRED MEAT REQUIRED SMOKE FIRE ZONE DETECTORS DETECTORS 1.Containment a.Post Accident Charcoal Filter A b.Post Accident Charcoal Filter 8 c.Auxiliary Filter Charcoal Bank A d.Auxiliary Filter Charcoal Bank 8 e.Cable Trays-Basement Elevation f.Cable Trays-Intermediate Elevation g.Cable Trays-Operating Floor h.Reactor Coolant Pump (RCP)A-Intermediate Floor i.RCP 8-Intermediate Floor Are'a Detection-Operating Floor ZOO, Z10 Z11, Z12 Z06 Z07 ZOB Zjs Z16 Z13 Z14 Z16 3(~)(b)(c)3(~)(b)(c)1(b)(c)1(b)(c)I (b)(d)2 (b)(b)(d)1 (b)(d)I (b)(d), 1 (b)(d)H/A N/A H/A H/A H/A N/A H/A H/A N/A N/A 7(b)(b)2.Control Building a.Control Room-Area and Cabinet b.Control Room/Turbine Building Wall c.Air Handling Room d.Relay Room e.Computer (MUX)Room Ceiling f.Battery Rooms A and 8 3.Diesel Generators (OGs)a.OG Room A b.OG Vault A c.OG Room 8 d.OG Vault 8 Zjg S29 S06 Z18, SOB S07 pyrotronics area 2 zone 4 S12 Z20 S13 Z21 4(b)H/A 3(b)H/A H/A 2(b)H/A 2(>)H/A 17(b)H/A 3(b)16"'(b)3(~)H/A H/A continued)(a)There is one additional detector at each zone which is not required to be OPERABLE per this TR.(b)This instrument is not required to be OPERABLE during performance of integrated leak rate tests.(c)Resistance temperature detectors (RTOs)only.(d)Line type detectors.
Instrumentation                                      3.3-1 3.3.2              Circulating Water Flood Protection Instrumentation . 3 ~3 3 3.3.3             Movable In-Core Instrumentation                      3.3-6 3.3.4              Fire Detection Instrumentation .                    3 ~3 7 3.4           REACTOR COOLANT SYSTEM (RCS)                              3.4-1 3.4.1             Reactor Vessel Head Vents                            3.4-1 3.4.2              RCS Chemistry                                        3.4-3 3.5          EMERGENCY CORE COOLING SYSTEMS    (ECCS)                  3.5-1 3.6           CONTAINMENT SYSTEMS                                      3.6-1 3.7          PLANT SYSTEMS                                            3.7-1 3.7.1             Fire Suppression  Water Sources .    ~ ~ ~  ~      3.7-1 3.7.2              Fire Suppression  Spray and Sprinkler Systems        3.7-6 3.7.3             Halon Systems                                        3.7-11 3.7.4             Fire Hose Stations . .                               3.7-14 3.7.5              Fire Barrier Penetration Seals  .                   3.7-18 3.7.6              Fire Yard Loop .                                    3.7-23 3.8          ELECTRICAL  POWER SYSTEMS  .                             3.8-1 3.8.1              Offsite  Power Sources                               3.8-1 3.9          REFUELING OPERATIONS .                                     3.9-1 3.9.1             Fuel Storage in Spent Fuel Pool (SFP) Region    2    3.9-1 3.9.2              Fuel Assembly Hovement in Auxiliary Building          3.9-2 3.9.3             Refueling Manipulator Crane Interlocks .             3.9-4 Ginna Station  TRH                                                    Revision
Ginna Station TRH 3.3-11 Revision 1  
 
*4(''Fire Suppression Spray and Sprinkler Systems TR 3.7.2 I ACTIONS continued CONDITION REQUIRED ACTION I COMPLETION TIME B.One or more required systems in Table TR 3.7.2-2 inoperable.
Fire Detection Instrumentation TR 3.3.4 Table  TR 3.3.4-1 (page 1 of 2)
B.1--------NOTE--------
Fire Detection Instrumentation REQUIRED MEAT    REQUIRED SMOKE LOCATION                                FIRE ZONE      DETECTORS        DETECTORS
Not required to be performed during emergency conditions that prohibit access to affected room.AND Perform a fire watch inspection of the affected fire zones.Once within 1 hour and every hour thereafter B.2 Place backup fire suppression equipment in affected area.1 hour AND B.3 Restore affected system to OPERABLE status.~14 days C.Required Action and associated Completion Time not met.C.1 Prepare special report and submit to NRC outlining cause of system inoperability and plans for restoring to OPERABLE status.30 days Ginna Station TRM 3.7-7 Revision 1
: 1. Containment
~~)~~Fire Suppression Spray and Sprinkler Systems TR 3.7.2 Table TR 3.7.2-2 (page 1 of I)Fire Suppression Spray and Sprinkler Systems-Hourly Watch LOCATIOH TYPE SYSTEH NUHBER FIRE SYSTEM ACT UAT IOH 1.Hain Oil Storage Room 2.Service Building-Hain Floor, Basement, Hot Shop 3.Transformer PI 4.Transformer Ill 5.Transformer f12A 6.Transformer f128 7.Turbine Condener Pit 8.Generator Hydrogen Seal 9.Turbine Island 10.Hain Turbine Oil Reservoir ll.Auxiliary Building-East Stairs 12.Auxiliary Building-West Stairs and Crane Hatch 13.Contamination Storage Room Spray Sprinkler Spray Spray Spray Spray Spray Spray Sprinkler Spray Sprinkler Sprinkler Sprinkler S16 Automatic S21 S22 S23 S24 S25 S26 S27 S35 S36 SSO Automatic Automatic Automatic Hanual Automatic Automatic Automatic Automatic Autoatic Automatic S19 Automatic'S20 Automatic Ginna Station TRM 3.7-10 Revision 1 DG Loid Sequencer TR 3.8.2 3.8 ELECTRICAL POWER SYSTEHS 3.8.2 Diesel Generator (DG)Load Sequencer TR 3.8.2 Each DG load sequencer shall meet the breaker closure times specified in Table TR 3.8.2-1.APPLICABILITY:
: a. Post Accident Charcoal        Filter  A                        ZOO, Z10        3( ~ )(b)(c)          N/A
MODES 1, 2, 3 and 4.ACTIONS CONDITION RE(VIREO ACTION COMPLETION T IHE A.One or both DG load sequencer(s) with breaker closure times not within limits.A.1 Enter applicable Conditions and Required Actions of LCO 3.8.1.Immediately SURVEILLANCE REQUIREMENTS SURVEILLANCE FRF(UENCY TSR 3.8.2.1 Perform SR 3,8.1.9.In accordance with applicable SR Ginna Station TRM TRfl 3.0-2 Revision 0 l)G Ll)a<f Sequencer 1fi 3.8.2 Table TII 3;8.2-1 (page I of I)DG Load Sequencer Maximum Breaker Closure Times DG A~sec DG 8~sec 2.3.4.5.6.7.480V Safeguards Buses and Containment Spray Pumps Safety Injection (Sl)Pump.A=and B SI Pump C Residual Heat Removal Pump A and B Selected Service Water Pumps First Containment Recirculation Fan Cooler (CRFC)Second CRFC 10 I 5lll 2pll)3 pl))35(i)4 pl l)10 I 5ll)22" I 27)l)32(1)37)l)42)ll 8.Motor Driven Auxiliary Feedwater Pump A and B 45)n 5 seconds is added for pump or fan cooler to achieve running conditions (i.e., SI Pump A breaker actually closes at 10 seconds but pump is assumed running at 15 seconds.)..
                                                                                              ~ )(b)(c)
Ginna Station TRM TRM 3.8-3 Revision 0
: b. Post Accident Charcoal        Filter  8                        Z11, Z12        3(                    H/A 1(b)(c)
~~}}
: c. Auxiliary Filter        Charcoal Bank A                            Z06                                H/A 1(b)(c)
: d. Auxiliary Filter       Charcoal Bank 8                           Z07                                H/A
: e. Cable Trays     -   Basement   Elevation                           ZOB            I (b) (d)
N/A
: f. Cable Trays     - Intermediate Elevation                           Zjs          2 (b) (b) (d)
H/A
: g. Cable Trays     - Operating Floor                                 Z16            1 (b) (d)
H/A
: h. Reactor Coolant       Pump (RCP) A   - Intermediate               Z13            I (b)(d),          N/A Floor
: i. RCP 8   - Intermediate Floor                                       Z14            1 (b)(d)
N/A Are'a Detection     - Operating Floor                           Z16               H/A            7(b)(b)
: 2. Control Building
: a. Control    Room  -  Area and Cabinet                              Zjg                                17(b)
: b. Control Room/Turbine Building Wall                                S29              4(b)             H/A
: c. Air Handling      Room                                            S06              H/A              3(b)
: d. Relay  Room                                                    Z18,  SOB            3(b) 16"'(b)
: e. Computer (MUX) Room        Ceiling                                S07              H/A
: f. Battery    Rooms A and 8                                      pyrotronics          H/A              3( ~ )
area 2 zone  4
: 3. Diesel Generators      (OGs) 2(b)
: a. OG  Room A                                                         S12                                H/A
: b. OG  Vault  A                                                     Z20              H/A 2(>)
: c. OG  Room 8                                                        S13                                H/A
: d. OG  Vault  8                                                      Z21              H/A continued)
(a)     There  is  one  additional detector at each        zone which  is not required to  be OPERABLE per  this      TR.
(b)    This instrument        is not required to    be OPERABLE  during performance of integrated leak rate tests.
(c)    Resistance    temperature detectors (RTOs) only.
(d)     Line type detectors.
Ginna    Station                                          TRH  3.3-11                                      Revision        1
* 4( '  '
Fire Suppression Spray    and  Sprinkler  Systems TR 3.7.2 I
ACTIONS    continued CONDITION              REQUIRED ACTION          I    COMPLETION TIME B. One  or more required  B.1    --------NOTE--------
systems in Table              Not required to be TR 3.7.2-2 inoperable.        performed during emergency conditions that prohibit access to affected room.
Perform  a fire watch      Once  within  1 inspection of the          hour and every affected fire zones.        hour thereafter AND B.2     Place backup fire          1 hour suppression equipment in affected area.
AND B.3     Restore affected          ~
14 days system to OPERABLE status.
C. Required Action and    C.1    Prepare special            30 days associated Completion          report and submit to Time not met.                  NRC  outlining cause of system inoperability and plans for restoring to OPERABLE status.
Ginna Station                   TRM  3.7-7                              Revision   1
 
~ ~  ~ ~
    )
Fire Suppression Spray           and   Sprinkler Systems TR 3.7.2 Table TR 3.7.2-2 (page 1 of I)
Fire Suppression Spray  and  Sprinkler Systems - Hourly  Watch SYSTEH FIRE SYSTEM LOCATIOH                                      TYPE        NUHBER  ACTUAT IOH
: 1. Hain Oil Storage Room                                                Spray          S16  Automatic
: 2. Service Building  -  Hain Floor, Basement,  Hot Shop              Sprinkler        S19  Automatic
                                                                                                                      '
: 3. Transformer PI                                                      Spray          S20  Automatic
: 4. Transformer  Ill                                                    Spray          S21  Automatic
: 5. Transformer f12A                                                    Spray          S22  Automatic
: 6. Transformer f128                                                    Spray          S23  Automatic
: 7. Turbine Condener Pit                                                Spray          S24    Hanual
: 8. Generator Hydrogen Seal                                              Spray         S25  Automatic
: 9. Turbine Island                                                    Sprinkler       S26  Automatic
: 10. Hain Turbine Oil Reservoir                                          Spray          S27  Automatic ll. Auxiliary Building -   East  Stairs                                Sprinkler        S35  Automatic
: 12. Auxiliary Building -   West  Stairs and Crane Hatch                Sprinkler        S36    Autoatic
: 13. Contamination Storage  Room                                      Sprinkler        SSO  Automatic Ginna Station                                  TRM  3.7-10                                  Revision    1
 
DG  Loid Sequencer TR 3.8.2 3.8  ELECTRICAL  POWER SYSTEHS 3.8.2  Diesel Generator     (DG) Load Sequencer TR  3.8.2          Each  DG  load sequencer    shall meet the breaker closure times specified in Table    TR  3.8.2-1.
APPLICABILITY:      MODES  1, 2, 3 and 4.
ACTIONS CONDITION                      RE(VIREO ACTION              COMPLETION T IHE A. One  or both DG load        A.1        Enter applicable        Immediately sequencer(s) with                      Conditions and breaker closure times                  Required Actions of not within limits.                     LCO  3.8.1.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                  FRF(UENCY TSR  3.8.2.1    Perform    SR 3,8.1.9.                                In accordance with applicable SR Ginna  Station  TRM                      TRfl  3.0-2                           Revision  0
 
l)G Ll)a<f Sequencer 1fi  3.8.2 Table TII 3;8.2-1 (page I of I)
DG  Load Sequencer  Maximum Breaker Closure Times DG A       DG 8
                                                                  ~sec        ~sec 480V Safeguards    Buses and Containment  Spray Pumps      10        10
: 2. Safety Injection (Sl) Pump.A=and      B                    I 5lll      I 5ll)
: 3. SI Pump  C                                                  2pll)      22" I
: 4. Residual Heat Removal    Pump A and B                                  27)l)
: 5. Selected Service Water    Pumps                            3 pl))    32(1)
: 6. First  Containment Recirculation Fan Cooler (CRFC)          35(i)      37)l) l)    42)ll
: 7. Second CRFC                                                  4 pl
: 8. Motor Driven    Auxiliary Feedwater    Pump A and B          45)n 5  seconds    is added for pump or fan cooler to achieve running conditions (i.e.,  SI Pump A breaker actually closes at 10 seconds but pump is assumed running at 15 seconds.)..
Ginna Station  TRM                    TRM  3.8-3                           Revision    0
 
~ ~}}

Revision as of 16:57, 29 October 2019

to Technical Requirements Manual (TRM) & inter-office Correspondence Dtd 970624
ML17264A934
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/01/1997
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
PROC-970701, NUDOCS 9707080341
Download: ML17264A934 (18)


Text

CATEGORY REGULA- INFORMATION DISTRIBUTIO STEM (RIDS)

ACCESSION NBR:9707080341 DOC.DATE: 97/07/01 NOTARIZED: NO DOCKET I FACIE:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 ZpJT j".. AAME AUTHOR AFFILIATION WhaB'EL,G. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Revision 3 to "Technical Requirements. Manual (TRM)."

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution A NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 T

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDl-1 LA PD1-1 PD "

VISSING G.

0 INTERNAL: 1 NRR/DE/ECGB/A 1 NRR MCB .1 NRR/DRCH/HICB 1 R NRR/DSSA/SPLB 1 NRR/DSSA/SRXB 1 NUDOCS-ABSTRACT 1 OGC/HDS3 0 EXTERNAL: NOAC NRC PDR'--

0 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESKi ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OP'OPIES REQUIRED: LTTR 'NCL 12

v ~.;r~i" p.,r~~gn~ ~,y

'ill t<' l( >~44% v4

\

t~~

I DISP261 OCHESTER GAS Ec ELECTRIC ORATION DOCUMENT CONTROL Document Transmittal Transmittal: 9706082N 073 To: DOCUMENT CONTROL DESK Date: 06/28/1997 US NRC Holder: 1217 ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS. REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE), AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH RM-RDM-1.

Doc Id Doc Title Rev Rev Date Qty TECHNICAL REQUIREMENTS MANUAL FOR 003 07/01/1997 1 GINNA STATION PDR'ISTED Receipt Acknowledgement and Action Taken:

Signature Date Return to: Attention Document Control 49/3 Rochester Gas 8 Electric Corporation 89 East Avenue Rochester, New York 14649

,,9'707080341 97070i 6 llllllllllllllllllllllllllllllllllllllll,

'PDR )

'

ADQCK 05000244 P

Rochester Gas and Electric Corporation Inter-Office Correspondence June 24, 1997 SUB JECT: Technical Requirements Manual (TRM) Revision 3 TO: Distribution Attached is Revision 3 to the TRM. The following changes are included within this package ([ITS ¹ ]refers to internal tracking number for all outstanding ITS related issues):

Various pages listed the incorrect revision and were changed to Revision 3.

Also, typographical errors were corrected. [ITS ¹27]

2. TR 3.3 4. Table TS 3.3.4-1, Functions 3a and 3c were revised to remove Note (a). This note stated that "there is one additional detector at each zone which is not required to be OPERABLE per this TR." For the two diesel generator rooms, there are in fact only two detectors such that this note did ~n apply.

[ITS ¹28]

A requirement for Instrument Bus D was added including Required Actions ifit is inoperable and a new Surveillance Requirement. This new requirement only addresses which LCO's must be either: (I) declared inoperable, or (2) if evaluated for continued OPERABILITY Instrument Bus D fails. This is a clarification only (ie., it is not new actions), The new Surveillance Requirement is consistent with those required for the other instrument buses.

[ITS ¹19]

An error in TR 3.7.2 was corrected. This TR was added to the TRM by Revision based on information contained in the UFSAR'and Procedure A-1 52.4.1. Table I R 3.7.2-2 was taken from A-52.4.1 only (i.e., a similar table was ~n previously in the UFSAR). Required Action B.3 and C.l were unintentionally added in the TRM if an item in Table TR 3,7.2-2 was inoperable, These required actions were never part of A-52.4.1 and have resulted in a NRC Special Report due to the Main Transformer sprinkler system being out of service for > 14 days. This change removes Required Actions B.3 and C. from Table TR 3.7.2-2 in order to make the 1 specified actions consistent with those prior to TRM Revision l. [ITS ¹30]

"

5. A new requirement was added with respect to ATWS mitigation. Essentially, systems required to mitigate an ATWS event (i.e., beyond design basis accident) whose specific OPERABILITY requirements are not addressed by other LCOs or TRs were added. This includes the PORVs opening under automatic control, PORV block valves being open, rods capable of being manually inserted, and AMSAC. The inoperability of these systems can result in the inability to mitigate an ATWS event. Surveillance Requirements were also added for these systems consistent with current practices (i.e., no new surveillances to Ginna were added). [ITS ¹31j A new requirement was added with respect to LTOP arming logic. Currently, LCO 3.4.12 requires the PORVs to be OPERABLE under LTOP conditions ifa minimum size RCS vent is not available. However, there are no specific requirements related to the LTOP actuation logic other than requiring a COT every 31 days and a CHANNEL CALIBRATION every 24 months (SR 3.4.12.6 and 3.4.12.8, respectively). The new requirement addresses the arming logic specifically and identifies required actions in the event the logic is inoperable. Also, a new Surveillance Requirement was added with respect to ACTUATION LOGIC TESTS. The new Required Actions and Surveillance Requirements ensure that the PORVs remain capable of performing their LTOP function. [ITS ¹32]

Two new sections were added to the TRM: (1) Design Features, and (2)

Administrative Controls. The first section is only a holding place for future design features issues (e.g., what equipment is credited in SBO). The second section contains administrative requirements that are to be imposed by Ginna Station management until a Technical Specification amendment can be approved by the NRC. These administrative requirements are expected to be consistent with Improved Standard Technical Specifications (i.e., NUREG-1431) and help to ensure that systems, structures, and components already addressed within ITS remain OPERABLE until the ITS can be permanently changed, These changes are considered effective July 1, 1997. Please contact Mark Flaherty (extension 8512) or Tom Harding (extension 8013) ifyou have any questions.

Mark D. Flaherty Attachments MDR930

R.E. Ginna Nuclear Power Plant

" Technical Requirements Manual (TRM)

Revision 3 A hm nt Please replace the following pages of your controlled copy of the ITS as follows:

~VI me +g~in ~R~mv III III TRM TRM Cover Page LEP-i Cover Page LEP-i

~

III TRM Table of Contents III TRM Table of Contents III TRM Chapter 3.3 3.3-11 3.3-11~

III TRM Chapter 3 3 3.3-15~

III TRM Chapter 3.3 3.3-16 III TRM Chapter 3.3 III TRM Chapter 3.4 3.4-8~

Ill TRM Chapter 3 4 3.4-9~~

TRM Chapter 3.4 3.4-10 III TRM Chapter 3.4 3,4-11+

III TRM Chapter 3.4 3.4-12~+

III TRM Chapter 3.4 3.4-13~

III TRM Chapter 3 4 3.4-14 III TRM Chapter 3.7 3.7-7 III TRM Chapter 3.7 3,7-10 3.7-10 III TRM Chapter 3 8 3.8-2/~

III TRM Chapter 3.8 TRM Chapter 4,0 3.8-3 4.o-l ~

TRM Chapter 5.0 s.o-l ~~

TRM Chapter 5,0 5.0-2

'

GINNA STATION TRM Revision I TECHNICAL REQUIREMENTS MANUAL (TRM) esponsible Hanager

< lR Effective Date Controlled Gopy No. ~~d

l I List of Effective Pages (TRM)

.Pa e Rev. Pa e . Rev. Pa e Rev. Pa e Rev.

Section 3.4 Section 3.8 TRH 3.4-1 1 TRH 3.8-1 0 TRH 3.4-2 1 Section 1.0 TRH 3.4-3 0 Section 3.9 TRH 3.4-4 0 TfN 1.0-1 0 TRH 3.4-5 ,0. TRH 3.9-1 TRH 3.4-6 0 TRH 3.9-2 Section 2.0 TRH 3.4-7 0 TRH 3.9-3 TRH 3.9-4 TRH 2.0-1 Section 3.5 Section 3.0 TRM 3.5-1 TRH 3.0-1 1 Section 3.6 Section 3.1 TRM 3.6-1 TRH 3.1-1 0 Section 3.7 TfN 3.1-2 1 TRH 3.1-3 2 TRH 3.7-1 1 TRH 3.1-4 0 TRH 3.7-2 1 TRH 3.1-5 0 TRH 3.7-3 1 TfN 3.1-6 1 TRM 3.7-4 1 TfN 3.1-7 2 TRH 3.7-5 1 TRH 3.7-6 1 Section 3.2 TRH 3.7-7 1 TRH 3.7-8 '1' TRH 3.2-1 0 TRH 3,7-9 TRH 3.7-10 1 Section 3.3 TRH 3.7-11 1 TRH 3.7-12 1 RM 3.3-1 1 TRM 3.7-13 1 fN 3.3-2 0 TRH 3.7-14 1 fN 3.3-3 1 TRH 3.7-15 1 RH 3.3-4 0 TRH 3.7-16 1 RM 3.3-5 0 TRH 3.7-17 1 RH 3.3-6 0 TRH 3.7-18 1' RH 3.3-7 1 TfN 3.7-19 RH 3.3-8 1 TfN 3.7-20 1 RM 3.3-9 1 TRM 3.7-21 1 RM 3.3-10 1 TRH 3.7-22 1 TfN 3.3-11 1 TRM 3.7-23 1 TRH 3.3-12 1 TRH 3.7-24 1 TRH 3.3-13 1 TRH 3.3-14 1 Gonna Station TRH LEP-i Revision 1

TABLE OF CONTENTS 1.0 USE AND APPLICATION .................... 1.0-1 2.0 SAFETY LIMITS (SLs) 2.0-1 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY . 3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY 3.0-1 3.1 REACTIVITY CONTROL SYSTEMS . 3.1-1 3.1.1 Boron Injection System-MODES 1, 2, 3, and 4 . 3.1-1 3.1.2 Boron Injection System-MODE 5 . 3.1-6 3.2 POWER DISTRIBUTION LIMITS ............... 3. 2-1 3.3 INSTRUHENTATION 3.3-1 3.3.1 Control Room Emergency Air Treatment System (CREATS)

Instrumentation 3.3-1 3.3.2 Circulating Water Flood Protection Instrumentation . 3 ~3 3 3.3.3 Movable In-Core Instrumentation 3.3-6 3.3.4 Fire Detection Instrumentation . 3 ~3 7 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4-1 3.4.1 Reactor Vessel Head Vents 3.4-1 3.4.2 RCS Chemistry 3.4-3 3.5 EMERGENCY CORE COOLING SYSTEMS (ECCS) 3.5-1 3.6 CONTAINMENT SYSTEMS 3.6-1 3.7 PLANT SYSTEMS 3.7-1 3.7.1 Fire Suppression Water Sources . ~ ~ ~ ~ 3.7-1 3.7.2 Fire Suppression Spray and Sprinkler Systems 3.7-6 3.7.3 Halon Systems 3.7-11 3.7.4 Fire Hose Stations . . 3.7-14 3.7.5 Fire Barrier Penetration Seals . 3.7-18 3.7.6 Fire Yard Loop . 3.7-23 3.8 ELECTRICAL POWER SYSTEMS . 3.8-1 3.8.1 Offsite Power Sources 3.8-1 3.9 REFUELING OPERATIONS . 3.9-1 3.9.1 Fuel Storage in Spent Fuel Pool (SFP) Region 2 3.9-1 3.9.2 Fuel Assembly Hovement in Auxiliary Building 3.9-2 3.9.3 Refueling Manipulator Crane Interlocks . 3.9-4 Ginna Station TRH Revision

Fire Detection Instrumentation TR 3.3.4 Table TR 3.3.4-1 (page 1 of 2)

Fire Detection Instrumentation REQUIRED MEAT REQUIRED SMOKE LOCATION FIRE ZONE DETECTORS DETECTORS

1. Containment
a. Post Accident Charcoal Filter A ZOO, Z10 3( ~ )(b)(c) N/A

~ )(b)(c)

b. Post Accident Charcoal Filter 8 Z11, Z12 3( H/A 1(b)(c)
c. Auxiliary Filter Charcoal Bank A Z06 H/A 1(b)(c)
d. Auxiliary Filter Charcoal Bank 8 Z07 H/A
e. Cable Trays - Basement Elevation ZOB I (b) (d)

N/A

f. Cable Trays - Intermediate Elevation Zjs 2 (b) (b) (d)

H/A

g. Cable Trays - Operating Floor Z16 1 (b) (d)

H/A

h. Reactor Coolant Pump (RCP) A - Intermediate Z13 I (b)(d), N/A Floor
i. RCP 8 - Intermediate Floor Z14 1 (b)(d)

N/A Are'a Detection - Operating Floor Z16 H/A 7(b)(b)

2. Control Building
a. Control Room - Area and Cabinet Zjg 17(b)
b. Control Room/Turbine Building Wall S29 4(b) H/A
c. Air Handling Room S06 H/A 3(b)
d. Relay Room Z18, SOB 3(b) 16"'(b)
e. Computer (MUX) Room Ceiling S07 H/A
f. Battery Rooms A and 8 pyrotronics H/A 3( ~ )

area 2 zone 4

3. Diesel Generators (OGs) 2(b)
a. OG Room A S12 H/A
b. OG Vault A Z20 H/A 2(>)
c. OG Room 8 S13 H/A
d. OG Vault 8 Z21 H/A continued)

(a) There is one additional detector at each zone which is not required to be OPERABLE per this TR.

(b) This instrument is not required to be OPERABLE during performance of integrated leak rate tests.

(c) Resistance temperature detectors (RTOs) only.

(d) Line type detectors.

Ginna Station TRH 3.3-11 Revision 1

  • 4( ' '

Fire Suppression Spray and Sprinkler Systems TR 3.7.2 I

ACTIONS continued CONDITION REQUIRED ACTION I COMPLETION TIME B. One or more required B.1 --------NOTE--------

systems in Table Not required to be TR 3.7.2-2 inoperable. performed during emergency conditions that prohibit access to affected room.

Perform a fire watch Once within 1 inspection of the hour and every affected fire zones. hour thereafter AND B.2 Place backup fire 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> suppression equipment in affected area.

AND B.3 Restore affected ~

14 days system to OPERABLE status.

C. Required Action and C.1 Prepare special 30 days associated Completion report and submit to Time not met. NRC outlining cause of system inoperability and plans for restoring to OPERABLE status.

Ginna Station TRM 3.7-7 Revision 1

~ ~ ~ ~

)

Fire Suppression Spray and Sprinkler Systems TR 3.7.2 Table TR 3.7.2-2 (page 1 of I)

Fire Suppression Spray and Sprinkler Systems - Hourly Watch SYSTEH FIRE SYSTEM LOCATIOH TYPE NUHBER ACTUAT IOH

1. Hain Oil Storage Room Spray S16 Automatic
2. Service Building - Hain Floor, Basement, Hot Shop Sprinkler S19 Automatic

'

3. Transformer PI Spray S20 Automatic
4. Transformer Ill Spray S21 Automatic
5. Transformer f12A Spray S22 Automatic
6. Transformer f128 Spray S23 Automatic
7. Turbine Condener Pit Spray S24 Hanual
8. Generator Hydrogen Seal Spray S25 Automatic
9. Turbine Island Sprinkler S26 Automatic
10. Hain Turbine Oil Reservoir Spray S27 Automatic ll. Auxiliary Building - East Stairs Sprinkler S35 Automatic
12. Auxiliary Building - West Stairs and Crane Hatch Sprinkler S36 Autoatic
13. Contamination Storage Room Sprinkler SSO Automatic Ginna Station TRM 3.7-10 Revision 1

DG Loid Sequencer TR 3.8.2 3.8 ELECTRICAL POWER SYSTEHS 3.8.2 Diesel Generator (DG) Load Sequencer TR 3.8.2 Each DG load sequencer shall meet the breaker closure times specified in Table TR 3.8.2-1.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTIONS CONDITION RE(VIREO ACTION COMPLETION T IHE A. One or both DG load A.1 Enter applicable Immediately sequencer(s) with Conditions and breaker closure times Required Actions of not within limits. LCO 3.8.1.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FRF(UENCY TSR 3.8.2.1 Perform SR 3,8.1.9. In accordance with applicable SR Ginna Station TRM TRfl 3.0-2 Revision 0

l)G Ll)a<f Sequencer 1fi 3.8.2 Table TII 3;8.2-1 (page I of I)

DG Load Sequencer Maximum Breaker Closure Times DG A DG 8

~sec ~sec 480V Safeguards Buses and Containment Spray Pumps 10 10

2. Safety Injection (Sl) Pump.A=and B I 5lll I 5ll)
3. SI Pump C 2pll) 22" I
4. Residual Heat Removal Pump A and B 27)l)
5. Selected Service Water Pumps 3 pl)) 32(1)
6. First Containment Recirculation Fan Cooler (CRFC) 35(i) 37)l) l) 42)ll
7. Second CRFC 4 pl
8. Motor Driven Auxiliary Feedwater Pump A and B 45)n 5 seconds is added for pump or fan cooler to achieve running conditions (i.e., SI Pump A breaker actually closes at 10 seconds but pump is assumed running at 15 seconds.)..

Ginna Station TRM TRM 3.8-3 Revision 0

~ ~