ML17265A557: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:V  
{{#Wiki_filter:CATEGORY 1, REGULA      Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
: r.  <
ACCESSION NBR:9903050332                DOC.DATE: 99/02/25        NOTARIZED:. NO              DOCKET  &#xb9; FACIL:50-244 Robert Emmet Ginna Nuclear Plant,                Unit 1, Rochester      G  050 0244 AUTH..NEGATE          AUTHOR  AFFILIATION
* Rochester    Gas  & Electric    Corp.
RECIP.NAME            RECIPIENT AFFILIATION V
rzr~y/


==SUBJECT:==
==SUBJECT:==
Revi to"Technical Requirements Manual (TRM)." ,DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL TITLE: OR Submittal:
Revi       to "Technical Requirements Manual (TRM)."
General Distribution C SIZE: CATEGORY 1, REGULA Y INFORMATION DISTRIBUTION SYSTEM (RIDS)r.<ACCESSION NBR:9903050332 DOC.DATE: 99/02/25 NOTARIZED:.
C
NO DOCKET&#xb9;FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 050 0244 AUTH..NEGATE AUTHOR AFFILIATION
    ,DISTRIBUTION CODE: A001D           COPIES RECEIVED:LTR           ENCL       SIZE:
*Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION rzr~y/NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72)
TITLE:   OR Submittal: General Distribution NOTES:License Exp date         in accordance with 10CFR2,2.109(9/19/72)             .     05000244 E
.05000244 E INTERNAL: RECIPIENT ID CODE/NAME PD1-1 LA VISSING,G.
RECIPIENT            COPIES              RECIPIENT             COPIES ID CODE/NAME         LTTR ENCL        ID  CODE/NAME        LTTR ENCL              G PD1-1 LA                                 PD1-1'D VISSING,G.
NRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSB JUNG,1 OGC/HDS3 COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD1-1'D NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB NUDOCS-ABSTRACT COPIES LTTR ENCL G EXTERNAL: NOAC NRC PDR D 0 N NOTE TO ALL"RIDS" RECIPIENTS:
INTERNAL:                                                NRR/DE/ECGB/A NRR/DE/EMCB                              NRR/DRCH/HICB NRR/DSSA/SPLB                            NRR/DSSA/SRXB NRR/SPSB JUNG,1                          NUDOCS-ABSTRACT OGC/HDS3 EXTERNAL: NOAC                                           NRC PDR D
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL 13 1 S~
0 N
DISR061 CHESTER GAS Ec'ELECTRIC C ORATION DOCUMENT CONTROL Document Transmittal To: DOCUMENT CONTROL DESK US NRC ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 Transmittal:
NOTE TO ALL "RIDS" RECIPIENTS:
9902082N 055.Date: 02/24/1999 Holder: 1217 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS.
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                     ENCL     13
REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE)~
 
AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH RM-RDM-1.Doc Id TRM Doc Title TECHNICAL REQUIREMENTS MANUAL FOR GINNA STATION Rev Rev Date Qty 008 02/25/1999 1 9903050332 9'70225 PDR ADQCK 05000244 PDR Receipt Acknowledgement and Action Taken: Signature Date Return to: Rochester Gas&.Electric Corporation Ginna Station-Records Management 1503 Lake Road Ontario, New York 14519 Rochester Gas and Electric Corporation Inter-Office Correspondence February 24, 1999  
1 S ~
 
DISR061                       CHESTER GAS Ec'ELECTRIC C   ORATION DOCUMENT CONTROL Document Transmittal Transmittal:  9902082N 055 .
To: DOCUMENT CONTROL DESK                                         Date: 02/24/1999 US NRC                                                       Holder: 1217 ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON       DC 20555 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS. REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE)~ AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH RM-RDM-1.
Doc Id                 Doc Title                             Rev    Rev Date    Qty TRM                    TECHNICAL REQUIREMENTS MANUAL FOR       008 02/25/1999     1 GINNA STATION 9903050332 9'70225 PDR ADQCK 05000244 PDR Receipt Acknowledgement and Action Taken:
Signature                                                 Date Return to:     Rochester Gas &. Electric Corporation Ginna Station - Records Management 1503 Lake Road Ontario, New York     14519
 
Rochester Gas and Electric Corporation Inter-Office Correspondence February 24, 1999


==Subject:==
==Subject:==
Technical Requirements Manual (TRM)Revision 8 TQI Distribution Attached are the associated revised pages for the Ginna Station Technical Requirements Manual (TRM).The changes included within Revision 8 are summarized as follows: 1.New TRs and surveillances were added to provide the requirements for spent fuel pool cooling during normal conditions and during a full core ofHoad.Revision 8 of the TRM is considered effective February 25, 1999.Instructions for the necessary changes to your controlled copy of the ITS are as follows: Volume Section Remove Insert III III m III III III III III III III TRM TRM TRM TOC TRM Chapter 3.7 TRM Chapter 3.7 TRM Chapter 3.9 TRM Chapter 3.9 TRM Chapter 3.9 TRM Chapter 3.9 TRM Chapter 3.9 Cover Page LEP-i TRM 3.9-2 TRM 3.9-3 Cover Page LEP-i i TRM 3.7-25 TRM 3.7-26 TRM 3.9-2 TRM 3.9-3 TRM 3.9-5 TRM 3,9-6 TRM 3.9-7 Please contact Tom Harding (extension 3384)if you ha e any questions.
Technical Requirements Manual (TRM) Revision 8 TQI     Distribution Attached are the associated revised pages for the Ginna Station Technical Requirements Manual (TRM). The changes included within Revision 8 are summarized as follows:
Thomas L.Harding 0~1 GINNA STATION TR Re ision 7 TECHNICAL FIEQUI MENTS MANUAL{T M}7.Responsible Hanaget Effective Date Conti ol l ed y No./~l List of Effective Pages (TRH)Page Rev.TOC Page Rev.Section 3.3 (con'd)Page Rev.Section 3.7 (con'd)Page Rev.Section 1.0 TRM 1.0-1 0 Section.2.0='RH 2.0-1'6 Section 3.0 TRH 3.0;1 1f Section 3.1"-TRN 3.3-13 TRH 3.3-14 TRH 3.3-15'RN 3.3-16 Section , TRH:3: 4-.'.1~TRH 3.4-2 TRH 3.4-3 TRN 3.4-4 TRN 3.4-5.TRN,3.4-6'JRH 3.4-7 TRH 3.4-.8-TRN 3.4-9 3.4 1-1 0 0 0 0 0 TRN 3.7-10 TRN 3.7-11 TRH 3.7-12 TRH 3.7-13 , TRH 3.7-14 TRM 3.7-15 TRH 3.7-16 TRM 3.7-17 TRM 3.7-18 TRN 3.7-19 TRN 3.7-20 TRM 3.7-21 TRN 3.7-22 TRM 3.7-23 TRM 3.7-24 6 1 1 1 4 1 6 1 1 6 6 6 1 1 TRH 3.1-1 TRH 3..1-2 TRM 3.1-3" TRH 3.1-4 TRM 3.1-5 TRH 3.1-6, TRH 3.1-7 0 1 2 , 0 5 1'2 TRN 3.4-10,--3 TRN 3.4-1'1.;."--'
: 1. New TRs and surveillances were added to provide the requirements for spent fuel pool cooling during normal conditions and during a full core ofHoad.
3 TRH 3.4-12-.3 TRN'3.4-13" 3 TRN 3.4-14 Section 3.5 Section 3.8 TRH 3.8-1 TRH 3.8-2 TRH 3.8-'3 Section 3.9 0 3 6 TRN 3.2-1 Section 3.6 Section,3.2
Revision 8 of the TRM is considered effective February 25, 1999. Instructions for the necessary changes to your controlled copy of the ITS are as follows:
'RM 3;5-1 0 TRH 3.9-1 TRM 3.9-2 TRH 3.9-3 TRN 3.9-4 Section 3.3 TRH 3.6-1 0 Section 4.0 TRH 3.3-1 TRH 3.3-2 TRN 3.3-3 TRH 3.3-4 TRH 3.3-5 TRN 3.3-6 TRN 3.3-7 TRN 3.3-8 TRN 3.3-9 TRM 3.3-10 TRH 3.3-11 TRN 3.3-12 1 0 1 0 0 0~1 1 6 4 4 4 Section 3.7 TRN 3.7-1 TRH 3.7-2 TRH 3.7-3.TRH 3.7-4'TRH 3;7-5'RH 3.7-6 TRH"3.7-7.
Volume       Section                     Remove               Insert III           TRM                          Cover Page            Cover Page III           TRM                          LEP-i                LEP-i m             TRM TOC                                           i III          TRM Chapter   3.7                                 TRM 3.7-25 III          TRM Chapter   3.7                                  TRM 3.7-26 III          TRM Chapter   3.9           TRM 3.9-2            TRM 3.9-2 III          TRM Chapter  3.9           TRM 3.9-3             TRM 3.9-3 III          TRM Chapter  3.9                                 TRM 3.9-5 III          TRM Chapter  3.9                                 TRM 3,9-6 III          TRM Chapter  3.9                                  TRM 3.9-7 Please contact Tom Harding (extension 3384)   if you ha e any questions.
TRH 3.7-8'.TRH 3, 7-'9 1 1 6 ,4 1 1 3 1 TRN 4.0-1 Section 5.0 TRH 5.0-1 TRM 5.0-2 Ginna Station TRH LEP-i Revision 7  
Thomas L. Harding
~~TABLE OF CONTENTS 1.0 USE AND APPLICATION
 
....................
0 ~ 1 GINNA STATION                 TR Re ision 7 TECHNICAL FIEQUI         MENTS MANUAL
1.0-1 2.0 3.0 3.0 3.1 3.1.1 3.1.2 SAFETY, LIMITS (SLs)LIHITING CONDITION FOR OPERATION (LCO)APPLICABILITY SURVEILLANCE REQUIREMENT (SR)APPLICABILITY REACTIVITY CONTROL SYSTEMS.Boron Injection System-MODES 1, 2, 3, and 4....Boron Injection System-MODE 5.2.0-1 3.0-1 3.0-1 3.1-1 3.1-1 3.1-6 3.2 POWER DISTRIBUTION LIMITS.....:.........3.2-1 3.3 3.3.1 3.3.2 3.3.3 3.3.4 3.3.5 3.4 3.4.1 3.4.2 3.4.3 3.5 3.6 INSTRUMENTATION Control Room Emergency Air Treatment System (GREATS)Instrumentation Circulating Water Flood Protection Instrumentation
{T M}
.Movable In-Core Instrumentation Fire Detection Instrumentation
7.
.Low Temperature Overpressure Protection (LTOP)Arming Logic REACTOR COOLANT SYSTEM (RCS)Reactor Vessel Head Vents RCS Chemistry Anticipated Transients Without Scram (ATWS)Mitigation EMERGENCY CORE COOLING SYSTEHS (ECCS)CONTAINMENT SYSTEMS 3.3-1 3.3-1 3~3 3 3.3-6 3~3 7 3.3-14 3.4-1 3.4-1 3.4-3 3.4-8 3.5-1 3.6-1 3.7 3.7.1 3.7.2 3.7.3 3.7.4 3.7.5 3.7.6 3.8 3.8.1 3.8.2 PLANT SYSTEMS Fire Suppression Water Sources.Fire Suppression Spray and Sprinkler Halon Systems Fire Hose Stations.Fire Barrier Penetration Seals.Fire Yard Loop.ELECTRICAL POWER SYSTEMS.Offsit'e Power Sources Instrument Bus D.~~t~Systems 3.7-1 3.7-1 3.7-6 3.7-11 3.7-14 3.7-18 30723 3.8-1 3.8-1 3.8-2 3.9 3.9.1 3.9.2 3.9.3 REFUELING OPERATIONS
Responsible Hanaget Effective Date Conti ol l ed y No. /~l
.Fuel Storage in Spent Fuel Pool (SFP)Region Fuel Assembly Movement in Auxiliary Building Refueling Manipulator Crane Interlocks
 
.2 3.9-1 3.9-1 3.9-2 3.9-4 Ginna Station TRH Revision
List of Effective         Pages (TRH)
~+l I Fuel Assembly Movement in Auxil iary Building TR 3.9.?3.9 REFUELING OPERATIONS 3.9.2 Fuel Assembly Movement in Auxiliary Building TR 3.9.2 During movement of irradiated fuel assemblies, the following sha'be met: a.Radiation levels in the spent fuel pool (SFP)area shall be monitored c'ohtinuously; b.A load in excess of one fuel assembly and it.", handling tool shall not be stationed nr transferred ovei the storage racks containing spent fuel;and c.The SFP temperature shall be z 150'F.-NOTE-The load restriction is not applicable for movement of consolidated fuel rod canisters if the spent fuel racks beneath the transported canister only contain fuel which has decayed z 60 days since being irradiated.
Page          Rev.                Page                 Rev.          Page          Rev. Page Rev.
APPLICABILITY:
TOC                          Section 3.3                       Section 3.7 (con'd)                     (con'd)
During movement of irradiated fuel assemblies in the operating floor area of the Auxiliary Building.ACTIONS CONDITION REQUIRED ACTION COMPLETION T IHE A.Radiation levels not continuously monitored.
TRN    3.3-13                      TRN  3. 7-10      6 TRH    3.3-14                      TRN  3.7-11      1 Section 1.0                   TRH    3.3-15                      TRH   3.7-12 3.3-16          'RN TRH   3. 7-13      1 TRM    1.0-1                  0                                      , TRH  3.7-14       1 Section 3.4                  TRM  3.7-15       4 Section                                                          TRH  3.7-16       1 TRH:3: 4-.'.1                 1-         3.7-17
A.I Suspend movement of irradiated fuel assemblies.
                            '6
Immediately OR Load restriction not met.OR SFP temperature not within limit.Ginna Station TRH TRH 3.9-2 Revision 0  
                .2.0='RH
~~J Fuel Assembly Movement in Auxiliary Building TH 3.9.?SURVEILLANCE RE(UIPEMENTS SURVEILLANCE FREQUENCY'lSR 3.9.2.1 Verify no load in excess of one fuel assembly and its handling tool is stationed or transferred over the storage racks.Once prior to moving loads over the storage rac).'ontaining spent iuel TSR 3.9.2,2 Verify radiation monitors in SFP area are OPERABLE.24 hours TSR 3.9.2.3 Verify SFP temperature is within limit.24 hours Ginna Station TRM TRM 3.9~3 Revision 0}}
                                  ,
                                                        ~              TRM                6 2.0-1                      TRH   3.4-2                  1    TRM  3.7-18      1 TRH    3.4-3                   0   TRN   3.7-19      1 Section 3.0                  TRN   3.4-4                  0    TRN  3.7-20      6 TRN  3.4-5          .       0    TRM   3.7-21      6 TRH   3.0;1                  1    TRN,3. 4-6                    0    TRN  3.7-22      6 f                              'JRH  3.4-7                   0          3.7-23 TRM               1 Section 3.1"-                 TRH  3.4-.8                      TRM   3.7-24       1
                                  -TRN    3.4-9 TRH   3.1-1                   0    TRN  3.4-10,              --3        Section 3.8 TRH   3..1-2                  1    TRN  3.4-1'1.;."--'          3 TRM    3.1-3"                  2    TRH  3.4              . 3    TRH   3.8-1       0 TRH    3.1-4               , 0    TRN'3.4-13"                   3   TRH   3.8-2        3 TRM    3.1-5                  5    TRN   3.4-14                       TRH   3.8-'3      6 TRH   3.1-6, TRH   3.1-7                '2 1 Section 3.5                        Section 3.9 Section,3.2             'RM 3;5-1                           0   TRH   3.9-1 TRM   3.9-2 TRN    3.2-1                            Section 3.6                  TRH  3.9-3 TRN  3.9-4 Section 3.3                   TRH   3.6-1                   0 Section 4.0 TRH   3.3-1                   1        Section 3.7 TRH   3.3-2                   0                                      TRN   4.0-1 TRN    3.3-3                   1    TRN  3.7-1                  1 TRH   3.3-4                  0    TRH  3.7-2                  1        Section 5.0 TRH    3.3-5                  0    TRH  3.7-3.                 6 TRN   3.3-6                  0    TRH  3.7-4                  ,4    TRH   5.0-1 TRN   3.3-7            ~
1   'TRH  3;7-5'RH 1    TRM  5.0-2 TRN   3.3-8                  1         3.7-6                  1 TRN    3.3-9                  6    TRH"3.7-7.                  3 TRM    3.3-10                  4    TRH 3.7-8'.
TRH   3.3-11                  4    TRH 3, 7-'9                 1 TRN    3.3-12                  4 Ginna Station            TRH                                     LEP-i                           Revision 7
 
~ ~
TABLE OF CONTENTS 1.0     USE AND APPLICATION     ....................                       1.0-1 2.0     SAFETY, LIMITS (SLs)                                              2.0-1 3.0     LIHITING CONDITION    FOR OPERATION (LCO) APPLICABILITY           3.0-1 3.0      SURVEILLANCE REQUIREMENT (SR) APPLICABILITY                       3.0-1 3.1          REACTIVITY CONTROL SYSTEMS .                                 3.1-1 3.1.1              Boron Injection System-MODES 1, 2, 3, and 4     . . . . 3.1-1 3.1.2              Boron Injection System-MODE 5 .                         3.1-6 3.2           POWER DISTRIBUTION LIMITS   . . . . . : . . . . . . . . . 3.2-1 3.3           INSTRUMENTATION                                                3.3-1 3.3.1            Control Room Emergency  Air Treatment System    (GREATS)
Instrumentation                                          3.3-1 3.3.2            Circulating Water Flood Protection Instrumentation      . 3 ~3 3 3.3.3            Movable In-Core Instrumentation                            3.3-6 3.3.4             Fire Detection Instrumentation .                         3 ~3 7 3.3.5              Low Temperature Overpressure Protection (LTOP)
Arming Logic                                             3.3-14 3.4          REACTOR COOLANT SYSTEM (RCS)                                   3.4-1 3.4.1              Reactor Vessel Head Vents                                 3.4-1 3.4.2              RCS Chemistry                                             3.4-3 3.4.3            Anticipated Transients Without Scram   (ATWS)
Mitigation                                               3.4-8 3.5          EMERGENCY CORE COOLING SYSTEHS   (ECCS)                       3.5-1 3.6          CONTAINMENT SYSTEMS                                            3.6-1 3.7          PLANT SYSTEMS                                                  3.7-1 3.7.1              Fire Suppression Water Sources .      ~ ~ t  ~          3.7-1 3.7.2              Fire Suppression Spray and Sprinkler Systems              3.7-6 3.7.3             Halon Systems                                            3.7-11 3.7.4              Fire Hose Stations .                                     3.7-14 3.7.5              Fire Barrier Penetration Seals  .                       3.7-18 3.7.6              Fire Yard Loop .                                          30723 3.8          ELECTRICAL POWER SYSTEMS .                                     3.8-1 3.8.1              Offsit'e Power Sources                                    3.8-1 3.8.2             Instrument Bus D .                                       3.8-2 3.9          REFUELING OPERATIONS .                                         3.9-1 3.9.1             Fuel Storage in Spent Fuel Pool (SFP) Region    2        3.9-1 3.9.2              Fuel Assembly Movement in Auxiliary Building              3.9-2 3.9.3             Refueling Manipulator Crane Interlocks .                 3.9-4 Ginna Station  TRH                                                        Revision
 
~ + l I
Fuel Assembly Movement in Auxil iary      Building TR  3.9.?
3.9   REFUELING OPERATIONS 3.9.2   Fuel Assembly Movement in      Auxiliary Building TR  3.9.2          During movement of irradiated fuel assemblies,          the following sha' be met:
: a. Radiation levels in the spent fuel pool (SFP) area shall be monitored c'ohtinuously;
: b. A  load in excess of one fuel assembly and it.", handling tool shall not be stationed nr transferred ovei the storage racks containing spent fuel; and
: c. The SFP temperature    shall be z  150'F.
                                                            -NOTE-The load   restriction is not applicable for      movement  of consolidated fuel rod canisters        if the spent fuel racks beneath the transported canister only contain fuel which has decayed z 60 days since being      irradiated.
APPLICABILITY:        During movement of irradiated fuel assemblies in the operating floor area of the Auxiliary Building.
ACTIONS CONDITION                      REQUIRED ACTION              COMPLETION T IHE A. Radiation levels not         A.I       Suspend movement   of   Immediately continuously                          irradiated fuel monitored.                            assemblies.
OR Load   restriction not met.
OR SFP   temperature not within limit.
Ginna   Station   TRH                     TRH 3.9-2                             Revision   0
 
~ ~ J Fuel Assembly Movement in Auxiliary Building TH         3.9.?
SURVEILLANCE RE(UIPEMENTS SURVEILLANCE                             FREQUENCY
  'lSR 3.9.2.1     Verify no load in excess of one fuel         Once  prior to assembly and   its handling tool is stationed moving loads or transferred over the storage racks.         over the storage rac).'ontaining spent iuel TSR   3.9.2,2     Verify radiation monitors in     SFP area are   24  hours OPERABLE.
TSR   3.9.2.3     Verify SFP temperature   is within limit. 24 hours Ginna   Station TRM                     TRM 3.9 ~
3                       Revision             0}}

Revision as of 17:47, 29 October 2019

Rev 4 to Technical Requirements Manual (Trm).
ML17265A557
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/25/1999
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
References
PROC-990225, NUDOCS 9903050332
Download: ML17265A557 (11)


Text

CATEGORY 1, REGULA Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

r. <

ACCESSION NBR:9903050332 DOC.DATE: 99/02/25 NOTARIZED:. NO DOCKET ¹ FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 050 0244 AUTH..NEGATE AUTHOR AFFILIATION

  • Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION V

rzr~y/

SUBJECT:

Revi to "Technical Requirements Manual (TRM)."

C

,DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) . 05000244 E

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL G PD1-1 LA PD1-1'D VISSING,G.

INTERNAL: NRR/DE/ECGB/A NRR/DE/EMCB NRR/DRCH/HICB NRR/DSSA/SPLB NRR/DSSA/SRXB NRR/SPSB JUNG,1 NUDOCS-ABSTRACT OGC/HDS3 EXTERNAL: NOAC NRC PDR D

0 N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR ENCL 13

1 S ~

DISR061 CHESTER GAS Ec'ELECTRIC C ORATION DOCUMENT CONTROL Document Transmittal Transmittal: 9902082N 055 .

To: DOCUMENT CONTROL DESK Date: 02/24/1999 US NRC Holder: 1217 ATT: ALLEN JOHNSON PROJECT DOCTORATE 1-1 WASHINGTON DC 20555 LISTED BELOW ARE NEW OR REVISED CONTROLLED DOCUMENTS. REVIEW THE ATTACHED INSTRUCTION LETTER (IF APPLICABLE)~ AND UPDATE YOUR CONTROLLED DOCUMENT IN ACCORDANCE WITH RM-RDM-1.

Doc Id Doc Title Rev Rev Date Qty TRM TECHNICAL REQUIREMENTS MANUAL FOR 008 02/25/1999 1 GINNA STATION 9903050332 9'70225 PDR ADQCK 05000244 PDR Receipt Acknowledgement and Action Taken:

Signature Date Return to: Rochester Gas &. Electric Corporation Ginna Station - Records Management 1503 Lake Road Ontario, New York 14519

Rochester Gas and Electric Corporation Inter-Office Correspondence February 24, 1999

Subject:

Technical Requirements Manual (TRM) Revision 8 TQI Distribution Attached are the associated revised pages for the Ginna Station Technical Requirements Manual (TRM). The changes included within Revision 8 are summarized as follows:

1. New TRs and surveillances were added to provide the requirements for spent fuel pool cooling during normal conditions and during a full core ofHoad.

Revision 8 of the TRM is considered effective February 25, 1999. Instructions for the necessary changes to your controlled copy of the ITS are as follows:

Volume Section Remove Insert III TRM Cover Page Cover Page III TRM LEP-i LEP-i m TRM TOC i III TRM Chapter 3.7 TRM 3.7-25 III TRM Chapter 3.7 TRM 3.7-26 III TRM Chapter 3.9 TRM 3.9-2 TRM 3.9-2 III TRM Chapter 3.9 TRM 3.9-3 TRM 3.9-3 III TRM Chapter 3.9 TRM 3.9-5 III TRM Chapter 3.9 TRM 3,9-6 III TRM Chapter 3.9 TRM 3.9-7 Please contact Tom Harding (extension 3384) if you ha e any questions.

Thomas L. Harding

0 ~ 1 GINNA STATION TR Re ision 7 TECHNICAL FIEQUI MENTS MANUAL

{T M}

7.

Responsible Hanaget Effective Date Conti ol l ed y No. /~l

List of Effective Pages (TRH)

Page Rev. Page Rev. Page Rev. Page Rev.

TOC Section 3.3 Section 3.7 (con'd) (con'd)

TRN 3.3-13 TRN 3. 7-10 6 TRH 3.3-14 TRN 3.7-11 1 Section 1.0 TRH 3.3-15 TRH 3.7-12 3.3-16 'RN TRH 3. 7-13 1 TRM 1.0-1 0 , TRH 3.7-14 1 Section 3.4 TRM 3.7-15 4 Section TRH 3.7-16 1 TRH:3: 4-.'.1 1- 3.7-17

'6

.2.0='RH

,

~ TRM 6 2.0-1 TRH 3.4-2 1 TRM 3.7-18 1 TRH 3.4-3 0 TRN 3.7-19 1 Section 3.0 TRN 3.4-4 0 TRN 3.7-20 6 TRN 3.4-5 . 0 TRM 3.7-21 6 TRH 3.0;1 1 TRN,3. 4-6 0 TRN 3.7-22 6 f 'JRH 3.4-7 0 3.7-23 TRM 1 Section 3.1"- TRH 3.4-.8 TRM 3.7-24 1

-TRN 3.4-9 TRH 3.1-1 0 TRN 3.4-10, --3 Section 3.8 TRH 3..1-2 1 TRN 3.4-1'1.;."--' 3 TRM 3.1-3" 2 TRH 3.4 . 3 TRH 3.8-1 0 TRH 3.1-4 , 0 TRN'3.4-13" 3 TRH 3.8-2 3 TRM 3.1-5 5 TRN 3.4-14 TRH 3.8-'3 6 TRH 3.1-6, TRH 3.1-7 '2 1 Section 3.5 Section 3.9 Section,3.2 'RM 3;5-1 0 TRH 3.9-1 TRM 3.9-2 TRN 3.2-1 Section 3.6 TRH 3.9-3 TRN 3.9-4 Section 3.3 TRH 3.6-1 0 Section 4.0 TRH 3.3-1 1 Section 3.7 TRH 3.3-2 0 TRN 4.0-1 TRN 3.3-3 1 TRN 3.7-1 1 TRH 3.3-4 0 TRH 3.7-2 1 Section 5.0 TRH 3.3-5 0 TRH 3.7-3. 6 TRN 3.3-6 0 TRH 3.7-4 ,4 TRH 5.0-1 TRN 3.3-7 ~

1 'TRH 3;7-5'RH 1 TRM 5.0-2 TRN 3.3-8 1 3.7-6 1 TRN 3.3-9 6 TRH"3.7-7. 3 TRM 3.3-10 4 TRH 3.7-8'.

TRH 3.3-11 4 TRH 3, 7-'9 1 TRN 3.3-12 4 Ginna Station TRH LEP-i Revision 7

~ ~

TABLE OF CONTENTS 1.0 USE AND APPLICATION .................... 1.0-1 2.0 SAFETY, LIMITS (SLs) 2.0-1 3.0 LIHITING CONDITION FOR OPERATION (LCO) APPLICABILITY 3.0-1 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY 3.0-1 3.1 REACTIVITY CONTROL SYSTEMS . 3.1-1 3.1.1 Boron Injection System-MODES 1, 2, 3, and 4 . . . . 3.1-1 3.1.2 Boron Injection System-MODE 5 . 3.1-6 3.2 POWER DISTRIBUTION LIMITS . . . . . : . . . . . . . . . 3.2-1 3.3 INSTRUMENTATION 3.3-1 3.3.1 Control Room Emergency Air Treatment System (GREATS)

Instrumentation 3.3-1 3.3.2 Circulating Water Flood Protection Instrumentation . 3 ~3 3 3.3.3 Movable In-Core Instrumentation 3.3-6 3.3.4 Fire Detection Instrumentation . 3 ~3 7 3.3.5 Low Temperature Overpressure Protection (LTOP)

Arming Logic 3.3-14 3.4 REACTOR COOLANT SYSTEM (RCS) 3.4-1 3.4.1 Reactor Vessel Head Vents 3.4-1 3.4.2 RCS Chemistry 3.4-3 3.4.3 Anticipated Transients Without Scram (ATWS)

Mitigation 3.4-8 3.5 EMERGENCY CORE COOLING SYSTEHS (ECCS) 3.5-1 3.6 CONTAINMENT SYSTEMS 3.6-1 3.7 PLANT SYSTEMS 3.7-1 3.7.1 Fire Suppression Water Sources . ~ ~ t ~ 3.7-1 3.7.2 Fire Suppression Spray and Sprinkler Systems 3.7-6 3.7.3 Halon Systems 3.7-11 3.7.4 Fire Hose Stations . 3.7-14 3.7.5 Fire Barrier Penetration Seals . 3.7-18 3.7.6 Fire Yard Loop . 30723 3.8 ELECTRICAL POWER SYSTEMS . 3.8-1 3.8.1 Offsit'e Power Sources 3.8-1 3.8.2 Instrument Bus D . 3.8-2 3.9 REFUELING OPERATIONS . 3.9-1 3.9.1 Fuel Storage in Spent Fuel Pool (SFP) Region 2 3.9-1 3.9.2 Fuel Assembly Movement in Auxiliary Building 3.9-2 3.9.3 Refueling Manipulator Crane Interlocks . 3.9-4 Ginna Station TRH Revision

~ + l I

Fuel Assembly Movement in Auxil iary Building TR 3.9.?

3.9 REFUELING OPERATIONS 3.9.2 Fuel Assembly Movement in Auxiliary Building TR 3.9.2 During movement of irradiated fuel assemblies, the following sha' be met:

a. Radiation levels in the spent fuel pool (SFP) area shall be monitored c'ohtinuously;
b. A load in excess of one fuel assembly and it.", handling tool shall not be stationed nr transferred ovei the storage racks containing spent fuel; and
c. The SFP temperature shall be z 150'F.

-NOTE-The load restriction is not applicable for movement of consolidated fuel rod canisters if the spent fuel racks beneath the transported canister only contain fuel which has decayed z 60 days since being irradiated.

APPLICABILITY: During movement of irradiated fuel assemblies in the operating floor area of the Auxiliary Building.

ACTIONS CONDITION REQUIRED ACTION COMPLETION T IHE A. Radiation levels not A.I Suspend movement of Immediately continuously irradiated fuel monitored. assemblies.

OR Load restriction not met.

OR SFP temperature not within limit.

Ginna Station TRH TRH 3.9-2 Revision 0

~ ~ J Fuel Assembly Movement in Auxiliary Building TH 3.9.?

SURVEILLANCE RE(UIPEMENTS SURVEILLANCE FREQUENCY

'lSR 3.9.2.1 Verify no load in excess of one fuel Once prior to assembly and its handling tool is stationed moving loads or transferred over the storage racks. over the storage rac).'ontaining spent iuel TSR 3.9.2,2 Verify radiation monitors in SFP area are 24 hours OPERABLE.

TSR 3.9.2.3 Verify SFP temperature is within limit. 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Ginna Station TRM TRM 3.9 ~

3 Revision 0