{{#Wiki_filter:.,,. Consumers Power Company Palisades Plant -Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984 ,-94 083 1ofbs
{{#Wiki_filter:.,,.
'
Consumers Power Company Palisades Plant - Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984
* PDR ADOCK G PDR 8 Pages OC0884-0002B-NL02 INSERVICE PC?-PSO-C PAI.ISADES NUCLE.\R POWER PLANT ISI RECORD OF EXi'\HINATION PERIOD 12/16/83 -05/04/84 REVIEWS AND APPROVALS General Office Palisades Nuclear Power Plant Reviews z1r6 lf" 1.,fr"*:r 1,.
    ,- 940831ofbs    840002=---~,
* Prepared by (NPS 0 roj Eng) Approval .Ml0484-0030B-NS03 Reviews Date Date 1fa<'.LJL'!
    '
Date General Manager Date Approval PALISADES NUCLEAR PLANT INSERVICE INSPECTION OF PCP-P50-C Submitted in accordance with ASME Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through Summer, 1978 for components.
* PDR ADOCK 0500025~
1977 Edition, Winter 1978 Addenda for component supports.
G               PDR 8 Pages OC0884-0002B-NL02
: 1) Date: July 19, 1984 2) 3) 4) Corporate Headquarters:
 
Plant: Unit No: 1 Consumers Power Company 212 W Michigan Ave Jackson, MI 49201 Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043 5) Commercial Service Date: December 31, 1971 6) Gross Generating Capacity:
INSERVICE   lNSPECTION-0~  PC?-PSO-C PAI.ISADES NUCLE.\R POWER PLANT ISI RECORD OF EXi'\HINATION PERIOD 12/16/83 - 05/04/84 REVIEWS   AND APPROVALS General Office                                           Palisades Nuclear Power Plant Reviews                                                  Reviews z1r6   lf" 1.,fr"*:r 1,. l~cou/t
830 Mw electric 2400 Mw thermal 7,8,9,10)
* Prepared by (NPS                                                                   Date 0roj  Eng)
See attached table and the remainder of the ISI Report 11) Completion Date for Inspections:
Date 1fa<'.LJL'!
May 4, 1984 12) Code Inspector(s):
Date rfN/ll'v~
Derald C Young Ed Resell Ian Wright 13) Authorized Inspection Agency: Protection Mutual, Norwood, MA 14) Abstract:
Pl~nt General Manager
See ISI Report MI0384-0028B-NS03 Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE Manufacturer State Assigned National Board
                                                                                  -th.t?l~1 Date Approval                                             Approval
* Components or Appurtenance Manufacturer Serial No No No -PCP-P50-C Byron-Jackson 0766 N/A N/A r :-U0484-0030B-NS03 i; *;' _ _____J
.Ml0484-0030B-NS03
 
PALISADES NUCLEAR PLANT INSERVICE INSPECTION OF PCP-P50-C Submitted in accordance with ASME Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through Summer, 1978 for components. 1977 Edition, Winter 1978 Addenda for component supports.
: 1)   Date: July 19, 1984
: 2)   Corporate Headquarters:     Consumers Power Company 212 W Michigan Ave Jackson, MI 49201
: 3)  Plant:                      Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043
: 4)  Unit No:    1
: 5)   Commercial Service Date:   December 31, 1971
: 6)   Gross Generating Capacity:       830 Mw electric 2400 Mw thermal 7,8,9,10)   See attached table and the remainder of the ISI Report
: 11) Completion Date for Inspections:     May 4, 1984
: 12) Code Inspector(s):   Derald C Young Ed Resell Ian Wright
: 13) Authorized Inspection Agency:     Protection Mutual, Norwood, MA
: 14) Abstract:   See ISI Report MI0384-0028B-NS03
                                                                            ~-**
 
Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE
                                                                                                    -
Manufacturer     State Assigned National Board
* Components or Appurtenance Manufacturer         Serial No           No             No PCP-P50-C         Byron-Jackson         0766             N/A           N/A r
:-U0484-0030B-NS03 i;
*;'                                                                                                 ______
* PALISADES NUCLEAR POWER PLANT Inservice Inspection of PCP-PSOC The Inservice Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in accordance with the Palisades Plant Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports.
* PALISADES NUCLEAR POWER PLANT Inservice Inspection of PCP-PSOC The Inservice Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in accordance with the Palisades Plant Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports.
The NDT examinations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques.
The NDT examinations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques.
Indications were recorded in compliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant wen:! documented and transmitted to CPCo, Nuclear Plant Support personnel for evaluation.
Indications were recorded in compliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant wen:!
NPS evaluated all reportabie indications and dispositioncd these by "accepting as is". The examination agency which was utilized in on-site NDT-ISI activities was CPCo System Protection and Laboratory Services (SP&LS). Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code. All records of procedures, personnel and equipment certifications, examination data and dispositions of all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall Rd, Jackson, Michigan.
documented and transmitted to CPCo, Nuclear Plant Support personnel for evaluation. NPS evaluated all reportabie indications and dispositioncd these by "accepting as is".
MI0684-0001A-NS03 Component Primary Coolant Pump P50-C '(Pump Casing) TABLE 1 Resolution of Reportable Indications Examination Condition Reporting Methods Reported Mechanism PT,VT Linear DN//DMZ 122383-1 Indications DR{/D-PAL-83-398 Page 1 of 1 Disposition Re-inspection Accept as N/A is.* *All noted are in.the diffuser vanes, far removed from the pressure boundary surface of the casing and therefore do not challenge the integrity of *the pressure boundary.
The examination agency which was utilized in on-site NDT-ISI activities was CPCo System Protection and Laboratory Services (SP&LS).
The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface. For further information on this refer to DR#D-PAL-83-398.  
Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code.
,,. MI0684-0001A-NS03 Page 1 of 1 TABLE 2 Summary of Areas Examined and Results Final ASME Section XI ASME Section XI Exam Component Examination Item No. Category No. Methods Identification Results B6 *. 190 B-G-1 MT,UT 2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.190 B-G-1 MT 2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B6.200 B-G..:.l VT-1 2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.200 B-G-1 VT-1 2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B-G-1 VT-1 Ligaments Acceptable Bl2.20 B-1-2* VT-1,PT 2A-C, Pump Casing Acceptable  
All records of procedures, personnel and equipment certifications, examination data and dispositions of all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall Rd, Jackson, Michigan.
.**
MI0684-0001A-NS03
FOAS-1 OWNER'S REPORT FOR INSERVICE.PECTIONS As required by the Provisions of the ASME Code Rules Consume.rs Power Company, 212 W Michican Ave, J.ackson, MI !19201 1. Owner ___ _ (Name and of Owner) Palisades Nuclear Plant, Route 2, Box 154, Covert, MI 49043 2. Plant ____________________________
 
_ (Nam*: and Address of Plant) 1 N/A 3. Plant Unit __________
Page 1 of 1 TABLE 1 Resolution of Reportable Indications Examination     Condition     Reporting Component              Methods         Reported       Mechanism         Disposition      Re-inspection Primary Coolant Pump P50-C '(Pump Casing)            PT,VT       Linear         DN//DMZ 122383-1   Accept as            N/A Indications   DR{/D-PAL-83-398   is.*
: 4. Owner Certificate of Authorization (if required)
*All indicati~ns noted are in.the diffuser vanes, far removed from the pressure boundary surface of the casing and therefore do not challenge the integrity of *the pressure boundary. The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface.
_______ _ 5. Commercial Service Date 12/3l/7l 6. N.itior.al Board Number for Unit _N_B_2_0_8_2_7 ________ _ 7. Components Inspected Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No. PCP-P50-C Byron-Jackson 0766 N/A N/A Note: Supplcmrnt:il sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8\li in. x 11 in., {2) informalillll in .it.::111s I through 6 011 this.report is included on each sheet, and (3) each sheet is numbned and the number of sheets is recorded at the top of this form. (12/82) This Form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y. 10017 I I
For further information on this refer to DR#D-PAL-83-398.
* FORM NIS-1 (Back) 12/16/83 05/04/84 . 11/10/83 11/10/93 8. Examination o'ates ______ co____ _ 9. lnspecnon Interval from co _____ _ 10. Abstract of Examinations.
                        ,,.
Include a list of examinaciom.
MI0684-0001A-NS03
and a statement concerning status of work requircJ for current interval.
 
See ISI Report, Table 2 11. Abstract of Conditions Noted See ISI Heport, 'rn.ble 1 12. Absrr:1cr of Corrective Measures Recommended and Tak1:n See ISI Hepor t, Table 1 We certify th:tt the statements made in this fl'{lort arc correct and the examinations and corrective surcs takc*r. conforn: tu the of the AS1'.1E Code, Scctic*n :\I. 1977 Edi ti on, Summer 78. Addenda .!:'er Compon: 0:nt3, (o Addenda for Supports Certificate of Autliori1.ation No. (if applicable) l I____ Expiration Date N/ A Date_
Page 1 of 1 TABLE 2 Summary of Areas Examined and Results Final ASME Section XI   ASME Section XI         Exam           Component                     Examination Item No.         Category No.             Methods         Identification               Results B6 *. 190             B-G-1           MT,UT           2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.190               B-G-1           MT             2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B6.200               B-G..:.l         VT-1           2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.200               B-G-1           VT-1           2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B6~200                B-G-1           VT-1           Ligaments                     Acceptable Bl2.20               B-1-2*           VT-1,PT         2A-C, Pump Casing             Acceptable
____ 1 9 _&"'L_s;gncd Consumers Power Co By z1W //. L(vn ifl<<L_ 0 (f Owner CERTIFICATE OF INS:ERVICE INSPECTION 1 I, the holding a valid issued by the N .* tional Board of antPresst}nc and the State or l'ro\incc of Micln3an :rnd employell bylro .LOn _
                      .**
* of N)r*oo'l.
~I0684-0001A-NS03
Ml\ nsw ""nee DJJ.dtanv
 
!
FOAS-1 OWNER'S REPORT FOR INSERVICE.PECTIONS As required by the Provisions of the ASME Code Rules I
inspected the components described in this Owner's Reporturir."g the oerind _J_?./J.C>/J)
Consume.rs Power Company, 212 W Michican Ave, J.ackson, MI !19201
___ to __ Q_'i.LOli.J_ll) , and sta*te that to the best of my knowledge and belief, the Owner ! has performed examinations and taken corrective measurt"s described in this Owner's Report in accordance with the rcquirc*ments of the Code, Section XI. Ily signing this cntit'ieatc neither the Inspector nor his employer makes any warranty, expressed or implied. concerning the cxarnin:itions and corrective measures dc:;cribcd in this Owner's Report. Furthermore, neither the Inspcctor nor his employ..:r shall be liable in any manner for any personal injury or property damage or a loss of any *kind arising from or connected with this inspection. . . J,\ ! t ) I . ft_
: 1. Owner _ _ __
__
(Name and     Addrcs~  of Owner)
J)_,8
Palisades Nuclear Plant, Route 2, _Box 154,
* 7 S-{ o 1111 *c.. '-{It __
: 2. Plant ____________________________                                                Covert, MI 49043 (Nam*: and Address of Plant)
National Board, State, Province, and Endorsem<::nts Date 19 VL(_ (12/82) consumers Power company [TC OI DRMA FILE General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 August 2, 1984 James G Keppler, Administrator Region Ill US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS In accordance with the Palisades Plant Technical Specifications, ASME Code and 10 CFR 50.55, a summary, that includes Approval Sheet, Title Page, NIS-1 Form and Tables that give a summary of the results ot the Inservice Inspection of PCP-P50C is transmitted for your use. This report covers the examination period of December 16, 1983 to May 4, 1984. These examinations were performed after the beginning of the second inspection interval (November 10, 1983) and Consumers Power Company is therefore taking credit tor them in the second interval.
: 3. Plant Unit _ _ _ _        1 _ _ _ _ _ _ 4. Owner Certificate of Authorization (if required) _ _        N/A
Copies of the attached report are being transmitted to S J Miergwa Chief -Boiler Division, State of Michigan Department of Labor per ments of the ASME Code. Brian D Johnson (Signed) Brian D Johnson Staff Licensing Engineer CC Director, Office ot Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector  
_ _ _ _ __
-Palisades Attachment OC0884-0002-NL02 OC0884-0002B-NL02 Consumers Power Company Palisades Plant -Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984 8 Pages INSERVICE INSPECTION-OF PC?-PSO-C PAJ.ISADES NUCLE.\::l POWER PI.ANT ISI RECORD OF EXl\HINATION PERIOD 12/16/83 -05/04/84 REVIEWS AND APPROVALS General Off ice Palisades Nuclear Power *Plant Reviews :zJ,,._(A l( I .fr::** (
: 5. Commercial Service Date           12 /3l/7l     6. N.itior.al Board Number for Unit   _N_B_2_0_8_2_7_________
Prepared by (NPS Vroj Eng) Approval
: 7. Components Inspected Manufacturer Component or                         Manufacturer                   or Installer           State or             National Appurtenance                           or Installer                   Serial No.         Province No.           Board No.
!L, L Director.
PCP-P50-C                     Byron-Jackson                             0766                 N/A                 N/A Note: Supplcmrnt:il sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8\li in. x 11 in.,
NPS .Ml0484-0030B-NS03 Reviews
{2) informalillll in .it.::111s I through 6 011 this.report is included on each sheet, and (3) each sheet is numbned and the number of sheets is recorded at the top of this form.
* f Ii\-: ... -*-*-*-.) Prant3c-,.:1mical Supt .  
(12/82)                   This Form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y. 10017
..
* FORM NIS-1 (Back) 12/16/83
* Da r.e
: 8. Examination o'ates _ _ _ _ _ _ c o _ _ _ _
'Dat'e Plant Cericral Manager Approval
05/04/84 _ 9.             .
.;..;l-... -----Late .. , /, ' /" ._r ,/ "-'*.' . Date *1 . Date PALISADF.S NUCLEAR PLANT INSERVICE INSPECTION OF PCP-P50-C Submitted in accordance with ASME Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through_ Summer, 1978 for components.
lnspecnon Interval from 11/10/83 co _____
1977 Edition, Winter 1978 Addenda for component supports.
11/10/93    _
: 1) Date: July 19, 1984 2) Corporate Headquarters:
: 10. Abstract of Examinations. Include a list of examinaciom. and a statement concerning status of work requircJ for current interval.
: 3) Plant: 4) Unit No: 1 Consumers Power Company 212 W Michigan Ave Jackson, MI 49201 Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043 5) Conunercial Service Date: December 31, 1971 6) Gross Generating Capacity:
See ISI Report, Table 2
830 Mw electric 2400 Mw thermal 7,8,9,10)
: 11. Abstract of Conditions Noted See ISI Heport, 'rn.ble 1
See attached table and the remainder of the ISI Report 11) Completion Date for Inspections:
: 12. Absrr:1cr of Corrective Measures Recommended and Tak1:n See ISI Hepor t, Table 1 We certify th:tt the statements made in this fl'{lort arc correct and the examinations and corrective 111c;,i-surcs takc*r. conforn: tu the 1-,u~s of the AS1'.1E Code, Scctic*n :\I. 1977 Edi ti on, Summer 78. Addenda .!:'er Compon: :nt3, lhr1tt~1* (o Addenda for CompoW~Rt Supports 0
May 4, 1984 12) Code Inspector(s):
Certificate of Autliori1.ation No. (if applicable)             l I____         Expiration Date         N/ A Date_   -*--J:.d.~;-L<;f_ ____ 19 _&"'L_s;gncd           Consumers Power Co             By z1W //. L(vn ifl<<L_
Derald C Young Ed Resell Ian Wright 13) Authorized Inspection Agency: Protection Mutual, Norwood, MA 14) Abstract:
0 (f 1
See ISI Report Ml0384-0028B-NS03
Owner CERTIFICATE OF INS:ERVICE INSPECTION I, the t111L!ersi~;ncd, holding a valid con!mis~ion issued by the N .* tional Board of ~oile{ antPresst}nc Yes~~! Insp~ctor::
'* . I Components or Appurtenance PCP-P50-C
and the State or l'ro\incc of               Micln3an                 :rnd employell bylro e~ .LOn _ -~'tuu.._
,.
* of
Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE Manufacturer Byron-Jackson Manufacturer Serial No 0766 State Assigned No N/A National Board
_t_'~-..,.--~-'----------havc inspected the components described in this Owner's Reporturir."g the oerind N)r*oo'l. Ml\                                                                          nsw ""nee DJJ.dtanv                  !
* No N/A ...
_J_?./J.C>/J)           ___ to __Q_'i.LOli.J_ll)     , and sta*te that to the best of my knowledge and belief, the Owner     !
has performed examinations and taken corrective measurt"s described in this Owner's Report in accordance with the rcquirc*ments of the i\S~lE Code, Section XI.
Ily signing this cntit'ieatc neither the Inspector nor his employer makes any warranty, expressed or implied.
concerning the cxarnin:itions and corrective measures dc:;cribcd in this Owner's Report. Furthermore, neither the Inspcctor nor his employ..:r shall be liable in any manner for any personal injury or property damage or a loss of any
*kind arising from or connected with this inspection.                                                           .
. J,\           ! t       ) I                   .                                                     ft_
  -~J.~'iJ~,(__(:__ __ ~//i-<_:1_~fL__commissions J)_,8
* 7 S-{ o         1111 *c.. '-{It             __
lnspcctor'!-/Signat1J~--                                National Board, State, Province, and Endorsem<::nts Date   -~L~1J_~----- 19 VL(_
(12/82)
 
consumers Power company
[TC   OI DRMA FILE General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 August 2, 1984 James G Keppler, Administrator Region Ill US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS In accordance with the Palisades Plant Technical Specifications, ASME Code and 10 CFR 50.55, a summary, that includes Approval Sheet, Title Page, NIS-1 Form and Tables that give a summary of the results ot the Inservice Inspection of PCP-P50C is transmitted for your use. This report covers the examination period of December 16, 1983 to May 4, 1984. These examinations were performed after the beginning of the second inspection interval (November 10, 1983) and Consumers Power Company is therefore taking credit tor them in the second interval. Copies of the attached report are being transmitted to S J Miergwa Chief - Boiler Division, State of Michigan Department of Labor per require-ments of the ASME Code.
Brian D Johnson (Signed)
Brian D Johnson Staff Licensing Engineer CC   Director, Office ot Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment OC0884-0002-NL02
 
Consumers Power Company Palisades Plant - Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984 8 Pages OC0884-0002B-NL02
 
INSERVICE INSPECTION-OF PC?-PSO-C PAJ.ISADES NUCLE.\::l POWER PI.ANT ISI RECORD OF EXl\HINATION PERIOD 12/16/83 - 05/04/84 REVIEWS AND APPROVALS Palisades Nuclear Power *Plant General Off ice Reviews                                                               Reviews
:zJ,,._(A l( I .fr::** ( 1.~r/!t11\        7/1q/-;~1                                                        7 ,?<i.~l1*
                                                                                                            ----- .;..;l- ...
Prepared by (NPS          Vroj    Eng)    ~                                                                    Late a/1~)
* __,4:~*;,-~ ~; ~;
                                                                                                            .., / , ' /" ._r f  Ii\-: ... *~. /~-- - * - * - * - .)    ,/   '~ "- '*.' .
* Da r.e          Prant3c-,.:1mical Supt                            Date
                                                            . C~------       ..
7/~o/Ji.( rf!Nlr_i'\~.
                                                  'Dat'e            Plant Cericral Manager
                                                                                                          *1
                                                                                                          . Date h.i:,/~1 Approval                                                      Approval U~""':_' !L, L Director. NPS
.Ml0484-0030B-NS03
 
PALISADF.S NUCLEAR PLANT INSERVICE INSPECTION OF PCP-P50-C Submitted in accordance with ASME Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through_
Summer, 1978 for components. 1977 Edition, Winter 1978 Addenda for component supports.
: 1)  Date: July 19, 1984
: 2)   Corporate Headquarters:     Consumers Power Company 212 W Michigan Ave Jackson, MI 49201                          . I
: 3)   Plant:                       Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043
: 4)   Unit No:   1
: 5)  Conunercial Service Date:    December 31, 1971
: 6)  Gross Generating Capacity:      830 Mw electric 2400 Mw thermal 7,8,9,10)  See attached table and the remainder of the ISI Report
: 11)  Completion Date for Inspections:      May 4, 1984
: 12)  Code Inspector(s):  Derald C Young Ed Resell Ian Wright
: 13)  Authorized Inspection Agency:      Protection Mutual, Norwood, MA
: 14)  Abstract:  See ISI Report
                                                                        '*
Ml0384-0028B-NS03
 
                                                                                                ...
Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE Manufacturer    State Assigned National Board
* Components or Appurtenance Manufacturer        Serial No            No            No PCP-P50-C          Byron-Jackson          0766              N/A            N/A
                        ,.
~I0484-0030B-NS03
 
PALISADES NUCLEAR POWER PLANT Inservicc Inspection of PCP-P50C The Inservicc Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in accordance with the Palisades Plant Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports.
PALISADES NUCLEAR POWER PLANT Inservicc Inspection of PCP-P50C The Inservicc Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in accordance with the Palisades Plant Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports.
The NDT exaQinations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques.
The NDT exaQinations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques.
Indications were recorded in coQpliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant were documented and transmitted to CPCo, Nuclear Plant Support personnel for evaluation.
Indications were recorded in coQpliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant were documented and transmitted to CPCo, Nuclear Plant Support personnel for evaluation. NPS evaluated all reportable indications and dispositioncd these by "accepting as is".
NPS evaluated all reportable indications and dispositioncd these by "accepting as is". The examination agency which was utilized in on-site NDT-ISI activities was CPCo Protection and Laboratory Services (SP&LS). Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code. All records of procedvres, personnel and equipment certifications, examination data and dispositions of all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall Rd, Jackson, Michigan.
The examination agency which was utilized in on-site NDT-ISI activities was CPCo Syst~m Protection and Laboratory Services (SP&LS).
MI0684-0001A-NS03 Component Primary Coolant Pump P50-C *(Pump Casing) TABLE 1 Resolution of Reportable Indications Examination Condition Reporting Methods Reported Mechanism* . PT, VT Linear DN/IDMZ 122383-1 Indications DR{ID-PAL-83-398 Page 1 of 1 Disposition Re-inspection Accept as N/A
Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code.
*All indicati<?ns noted.are in.the diffuser vanes, far removed from the pressure*
All records of procedvres, personnel and equipment certifications, examination data and dispositions of all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall Rd, Jackson, Michigan.
boundary of the casing and therefore do not challenge the integrity of the pressure boundary.
MI0684-0001A-NS03
The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface. For further information on this refer to DR#D-PAL-83-398.
 
MI0684-0001A-NS03 TABLE 2 Page 1 of 1 Summary of Areas Examined and Results Final
Page 1 of 1 TABLE 1 Resolution of Reportable Indications Examination     Condition     Reporting Component                Methods         Reported       Mechanism*       Disposition        Re-inspection Primary Coolant Pump P50-C *(Pump Casing)            . PT, VT      Linear        DN/IDMZ 122383-1 Accept as              N/A Indications   DR{ID-PAL-83-398 is~*
* ASME Section XI ASME Section XI Exam Component Examination Item No. Category No. Methods Identification Results Il6." 190 B-G-1 MT,UT 2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.190 B-G-1 MT 2A-1BT-N.:..l 1 thru 16, Pump Closure Nuts Acceptable B6.200 B-G,;.l VT-1 2A-1BT-'S-l 1 thru 16, Pump Closure Studs Acceptable B6.200 B-G-1 VT-1 2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B-G-1 VT-1 Ligaments Acceptable B12.20 B-L-2 VT-1,PT 2A-C, Pump Casing Acceptable
*All indicati<?ns noted.are in.the diffuser vanes, far removed from the pressure* boundary surfa~e of the casing and therefore do not challenge the integrity of the pressure boundary. The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface.
: :1:j684-ooo lA-;;soJ 9* A FORM NIS-1 OWNER'!i REPORT FOR As required by the l'n>visions of the ASME Code Rules Consumers Power Comrany, 212 W Michican Ave, Jackson, MI
For further information on this refer to DR#D-PAL-83-398.
: 1. Owner ___ _ ---------**------
MI0684-0001A-NS03
(!',jame anJ of Owner) 2. Plant Palisades Nuclear Plruit, Route 2, Box 154, Covert, MI 49043 *-----*-----*----*  
 
------*-* (Nam*: and Address of Plant) 3. Plant Unit 1 N/A ------4. Owner Certificate of Authorization (if required)_.  
Page 1 of 1 TABLE 2 Summary of Areas Examined and Results ASME Section XI Item No.
---------S. Commercial Service Date 12/3l/7l 6. Nitior.al Board Number for Unit __ N_B_2_0_8_2_7 _______ _ 7. Components Inspected Manufacturer Component or Manufacturer*
Il6." 190 ASME Section XI Category No.
or Installer State or National Appurtenance or Installer Serial No. Province No. Board No. -PCP-P50-C Byron-Jackson 0766 N/A N/A ' Note: Suppkllll'nlJI shccts in form of lists, sketches, or drawings may be used, provided (I) size is Sliz in. x 11 in., (2) i11formatllln in .itcms I through 6 on this.rl*port is indudl'U on each sht:cl, and (3) ead1 sheet is numbl*red and thl' number of shl'l'ts is recorded at the top of this form. (12/t12l This Form (E00029) may be ol>tain<?d from the Order Dept,. ASME, 345 E. 47th St., New*York, N.Y. 10017 I I 
B-G-1 Exam Methods MT,UT Component Identification 2A-1BT-S-l Final Examination Results
*. FORM NIS-1 (B:ick) 12/16/83 05/04/84 11/10/83 11/10/93 8. Examination o':itcs ------to____
* 1 thru 16, Pump Closure Studs Acceptable B6.190               B-G-1           MT             2A-1BT-N.:..l 1 thru 16, Pump Closure Nuts Acceptable B6.200               B-G,;.l         VT-1           2A-1BT-'S-l 1 thru 16, Pump Closure Studs Acceptable B6.200               B-G-1           VT-1           2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B6~200              B-G-1           VT-1           Ligaments                     Acceptable B12.20               B-L-2           VT-1,PT       2A-C, Pump Casing             Acceptable
_ 9. Inspection Interval from to 10. A!Jsr-racc of Examinations.
: :1:j684-ooo lA-;;soJ
Include a list of examinatiom and a statement concerning status of work requircJ for l"urrcnt intcrv:il.
 
See ISI Report, Table 2 11. Abstract of Con.litions Noted See ISI Peport, 'rable 1 12. Absrr:ict of Corrective Measures Recommended anJ See ISI I\cport, Table 1 We certify t!::1t the statements made in this rL'Jlc>rl arc correct and the examinations and corrective surcs tJ!:,*r. confor;::
I 9*                                                   A FORM NIS-1 OWNER'!i REPORT FOR INSERVIC~SPECTIONS As required by the l'n>visions of the ASME Code Rules Consumers Power Comrany, 212 W Michican Ave, Jackson, MI 4~201
t-i tlil' ru1.l;*s of th.:
: 1. Owner _ _ __
Code. Scctir.n XI. 1977 Edition, Sum.TJler 78 Addenda Cornp.'.)r!":n-::.s, Hi!1t,0>:*  
                                    ---------**------
*10 Adden(ta for Supports Certifi,:atc of Authorization No. (if applicable)  
(!',jame anJ   AJJres.~ of Owner)
*I.!....___
: 2. Plant Palisades Nuclear Plruit, Route 2, Box 154, Covert, MI 49043
Expiration Date N/ A Date.-*--
                            * - - - - - *-----*----* ------*-*
l9 .d'L s;gned Consumers Power Co By z3;tl V'. IA'in /,,7""-'\_
(Nam*: and Address of Plant)
(/ (f Owner CERTIFICATE OF IN SERVICE INSPECTION I, the lwlding a valid issued by be N 1tional Board of Boile,r and d's I'* f '*J1cl11cr"n d 1 db.Protec-c.J..on  
: 3. Plant Unit 1                                                                               N/A
... . _t:i;_ ._t 2 tc !'()\ 111.::i.:
                          - - - - - - 4. Owner Certificate of Authorization (if required)_.- - - - - - - - -
o 1
S. Commercial Service Date 12 /3l/7l 6. Nitior.al Board Number for Unit __N_B_2_0_8_2_7________
*in emp oye Y Ilr::, Ul 2.llc e C:'J,:, , o! No.i 1''-'
: 7. Components Inspected Manufacturer Component or                     Manufacturer*                   or Installer           State or             National Appurtenance                     or Installer                   Serial No.           Province No.           Board No.
impcctcd the components described Ill this Owner's H.eport durir{g the t:'er;;,,i
PCP-P50-C                 Byron-Jackson
_J.? / J0_i.).l__
                                                      -            0766                   N/A                 N/A
____ to_05.lQlVJ.l),_
                                            '
____ , and sta:L' that to the best of my knowledge and belief. the o .... nc; has performed exa:11in:;i inns :ind taken com:ctive me::isuft's d,:scribed in this Owner's Report in accordance with i:*,c requir,*1ncl!ts of !ht:
Note: Suppkllll'nlJI shccts in form of lists, sketches, or drawings may be used, provided (I) size is Sliz in. x 11 in.,
Code, Section XI. Ily si'.:ning this l*ntifiL':.:k neither the Inspector nor t..is employer makes any warranty, expressed or imp!kcl. conc<*rnini; the: cxai11i11:1lions and corrective measures dc:;cribcd in this Owner's Report. Furthermore, neither 1)1..: Insprct"r nor his cmployi.:r shall be li:ihle in any manner for any personal injury or property damage or a loss of any kind from or co:im*ctcd with this inspection.
(2) i11formatllln in .itcms I through 6 on this.rl*port is indudl'U on each sht:cl, and (3) ead1 sheet is numbl*red and thl' number of shl'l'ts is recorded at the top of this form.
_&sect;JJ:-: .. dLC:__ L//
(12/t12l               This Form (E00029) may be ol>tain<?d from the Order Dept,. ASME, 345 E. 47th St., New*York, N.Y. 10017
__ commissions  
 
).)_.[]
*.
* 7 r { o 1111.c.lt.  
FORM NIS-1 (B:ick) 12/16/83           05/04/84                                       11/10/83               11/10/93
'-{I c _
: 8. Examination o':itcs - - - - - - t o _ _ _ _                      _ 9. Inspection Interval from                         to
National Board, State, Province, and Endorsemo::nts . Date _'J._::__'J._J_-:_
: 10. A!Jsr-racc of Examinations. Include a list of examinatiom and a statement concerning status of work requircJ for l"urrcnt intcrv:il.
____ 19 _t!:{_ (12/82)   
See ISI Report, Table 2
. consumers Power company General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 August 2, 1984 . James G Keppler, Administrator Region Ill US Nuclear Regulatory Connnission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 -LICENSE DPR-20 -e PAO SGA EIC DRMJ.\ PALISADES PLANT -INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS In accordance with the Palisades Plant Technical Specifications, ASME Code and 10 CFR 50.55, a summary, that includes Approval Sheet, Title Page, NIS-1 Form and Tables that give a summary of the results ot the Inservice Inspection of PCP-J:>50C is transmitted for your use. This report covers the examination period of December 16, 1983 to May 4, 1984.
: 11. Abstract of Con.litions Noted See ISI Peport, 'rable 1
examinations were performed after the beginning of the second inspection interval (November 10, 1983) and Consumers Power Company is therefore taking credit tor them in the second interval.
: 12. Absrr:ict of Corrective Measures Recommended anJ                 1'ak.~n See ISI I\cport, Table 1 We certify t!::1t the statements made in this rL'Jlc>rl arc correct and the examinations and corrective ni.:J-surcs tJ!:,*r. confor;:: t-i tlil' ru1.l;*s of th.: :\S~!E Code. Scctir.n XI. 1977 Edition, Sum.TJler 78 Addenda .:~c:*
Copies of the attached report are being transmitted to S J Miergwa Chief -Boiler Division, State of Michigan Department of Labor per ments of the ASME Code. Brian D Johnson (Signed) Brian D Johnson Staff Licensing Engineer CC Director, Office ot Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector  
Cornp.'.)r!":n-::.s, Hi!1t,0>:* *10 Adden(ta for               ComJJo~e~t        Supports Certifi,:atc of Authorization No. (if applicable)                     *I.!....___         Expiration Date             N/ A Date.-*--       ~!.:.l~f-L~f--- l9 .d'L s;gned                   Consumers Power Co               By   z3;tl V'. IA'in /,,7""-'\_
-Palisades Attachment OC0884-0002-NL02
(/ (f                                                           Owner CERTIFICATE OF IN SERVICE INSPECTION I, the tinckrsi~:nl'd. lwlding a valid co!1!mis~ion issued by be N 1tional Board of Boile,r and J'resst)~<; V,e,~~l Insp-:!.:tor~
., . l OC0884-0002B-NL02 Consumers Power Company Palisades Plant -Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984 8 Pages INSERVICE INSPECTION-OF PC?-P50-C PAI.lSADES NUCLL\:Z POWER PLANT ISI RECORD OF EXAMINATION PERIOD 12/16/83 -05/04/84 REVIEWS AND APPROVALS General Off ice Palisades Nuclear Pcwer Plant Reviews Approval j .... c .  
              ' s._t 2tc ~~t-I!'()\
*H t,.1-i Director, r1<.L NPS .Ml0484-0030B-NS03 Reviews ,,_.;.r-:::,-... ) !' , .I -*-*--I  
                                '*             f     1'*J1cl11cr"n                     d         db.Protec-c.J..on ... 1.rc~~-                  .
....  
a1~ d  _t:i;_                 111.::i.: o                 ~c..                  *in emp 1oye  YIlr::, Ul 2.llc e C:'J,:, ~'C.!l ,       o!
--*;, Prant '1cdmical Supt  
No.i '~~~'..:.'....~ ''-'
--1/o":/N  
1                        h~vc impcctcd the components described Ill this Owner's H.eport durir{g the t:'er;;,,i
'Dat 1 e Plant General Manager Approval Plant General Manager Late .--/,. /**-r I , I J .. I , .,. -*. Date 1 l1..i:1l Date 7 /'l--i. I
_J.? / J0_i.).l______ to_05.lQlVJ.l),_____ , and sta:L' that to the best of my knowledge and belief. the o . . nc; has performed exa:11in:;i inns :ind taken com:ctive me::isuft's d,:scribed in this Owner's Report in accordance with i:*,c requir,*1ncl!ts of !ht: ;\:~:in: Code, Section XI.
-'1 Date PALISADF.S NUCLEAR PLANT. INSERVICE INSPECTION OF PCP-PSO-C Submitted in accordance with Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through Summer, 1978 for components.
Ily si'.:ning this l*ntifiL':.:k neither the Inspector nor t..is employer makes any warranty, expressed or imp!kcl.
1977 Edition, Winter 1978 Addenda for component supports.
conc<*rnini; the: cxai11i11:1lions and corrective measures dc:;cribcd in this Owner's Report. Furthermore, neither 1)1..:
: 1) Date: July 19, 1984 2) torporate Headquarters:
Insprct"r nor his cmployi.:r shall be li:ihle in any manner for any personal injury or property damage or a loss of any kind ari~ing from or co:im*ctcd with this inspection.
: 3) Plant: 4) Unit No: 1 Consumers Power Company 212 W Michigan Ave Jackson, MI 49201 Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043 5) Conunercial Service Date: December 31, 1971 6) Gross Generating Capacity:
_&sect;JJ:-:. dLC:__ L// *'1-~V_ _
830 Mw electric 2400 Mw thermal 7,8,9,10)
Insprc!or\ 1 Sig11:1t1J~--
See attached table and the remainder of the IS! Report 11) Completion Date for Inspections:
commissions ).)_.[]
May 4, 1984 12) Code Inspector(s):
* 7r { o             1111.c.lt. '-{I c _
Derald C Young Ed Resell Ian Wright 13) Authorized Inspection Agency: Protection Mutual, Norwood, MA 14) Abstract:
National Board, State, Province, and Endorsemo::nts
See !SI Report MI0384-0028B-NS03  
    . Date     _'J._::__'J._J_-:_ ____ 19 _t!:{_
'*
(12/82)
Components or Appurtenance PCP-P50-C Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE Manufacturer Byron-Jackson Manufacturer Serial No 0766 State Assigned No N/A National Board
 
* No N/A ...
  .
PALISADES NUCLEAR POWER PLANT Inservicc Inspection of PCP-PSOC The Inservicc Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in *accordance with the Palisades Plani Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports.
~-
e ett0-t~
consumers Power                                                   PAO company                                                 SGA EIC DRMJ.\
General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 August 2, 1984 .
James G Keppler, Administrator Region Ill US Nuclear Regulatory Connnission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR   PALISADES PLANT - INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS In accordance with the Palisades Plant Technical Specifications, ASME Code and 10 CFR 50.55, a summary, that includes Approval Sheet, Title Page, NIS-1 Form and Tables that give a summary of the results ot the Inservice Inspection of PCP-J:>50C is transmitted for your use. This report covers the examination period of December 16, 1983 to May 4, 1984. ~hese examinations were performed after the beginning of the second inspection interval (November 10, 1983) and Consumers Power Company is therefore taking credit tor them in the second interval. Copies of the attached report are being transmitted to S J Miergwa Chief - Boiler Division, State of Michigan Department of Labor per require-ments of the ASME Code.
Brian D Johnson (Signed)
Brian D Johnson Staff Licensing Engineer CC   Director, Office ot Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment
                                                                                          .,
                                                                                        . l OC0884-0002-NL02
 
Consumers Power Company Palisades Plant - Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984 8 Pages OC0884-0002B-NL02
 
INSERVICE INSPECTION-OF PC?-P50-C PAI.lSADES NUCLL\:Z POWER PLANT ISI RECORD OF EXAMINATION PERIOD 12/16/83 - 05/04/84 REVIEWS AND APPROVALS Palisades Nuclear Pcwer Plant General Off ice Reviews Reviews Late
                                                        ,,_.;.r-:::,-...
                                                ~///'.,o'j )                          .--/,.
                                              !' I'~*-* , .I            -*-*- -         I        , /**-r I J ..
I                . . --
:"'<~----- ~--*              *;,   I    , .,. -  *.
Prant '1cdmical Supt                           Date c~;>      --
1/o":/N 1
                                    'Dat e rf!N./r_~'vs-~
Plant General Manager 1    l1..i:1l ~1 Date Approval Approval ew\V\,0,.~                                    /'l--i. I &_J~'1 c  j
. ~0-l( *H
            ....
t,.1- i Director, NPS r1<.L                      Plant General Manager 7
                                                                                        -
Date
.Ml0484-0030B-NS03
 
PALISADF.S NUCLEAR PLANT.
INSERVICE INSPECTION OF PCP-PSO-C Submitted in accordance with ASM~ Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through Summer, 1978 for components. 1977 Edition, Winter 1978 Addenda for component supports.
: 1)   Date: July 19, 1984
: 2)   torporate Headquarters:   Consumers Power Company 212 W Michigan Ave Jackson, MI 49201
: 3)  Plant:                    Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043
: 4)  Unit No:    1
: 5)   Conunercial Service Date: December 31, 1971
: 6)   Gross Generating Capacity:     830 Mw electric 2400 Mw thermal 7,8,9,10)   See attached table and the remainder of the IS! Report
: 11) Completion Date for Inspections:   May 4, 1984
: 12) Code Inspector(s):   Derald C Young Ed Resell Ian Wright
: 13) Authorized Inspection Agency:   Protection Mutual, Norwood, MA
: 14) Abstract:   See !SI Report
                                                                        '*
MI0384-0028B-NS03
 
                                                                                                ... ~
Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE Manufacturer     State Assigned National Board
* Components or Appurtenance Manufacturer        Serial No            No            No PCP-P50-C          Byron-Jackson         0766             N/A           N/A
~I0484-00JOB-NS03
 
PALISADES NUCLEAR POWER PLANT Inservicc Inspection of PCP-PSOC The Inservicc Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in
*accordance with the Palisades Plani Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports.
The NDT exDninations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques.
The NDT exDninations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques.
Indications were recorded.
Indications were recorded. in compliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant were documented and transmitted to CPCo. Nuclear Plant Support personnel for evaluation. NPS evaluated all reportable indications and dispositioncd thes~
in compliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant were documented and transmitted to CPCo. Nuclear Plant Support personnel for evaluation.
by "accepting as is".
NPS evaluated all reportable indications and dispositioncd by "accepting as is". The examination agency which was utilized in on-site NDT-ISI activities was CPCo System Protection and Laboratory Services (SP&LS). Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code. All records of procedures, personnel and equipment certifications, examination data and dispositions 6&#xa3; all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall.Rd, Jackson, Michigan.
The examination agency which was utilized in on-site NDT-ISI activities was CPCo System Protection and Laboratory Services (SP&LS).
MI0684-0001A-NS03 Component Primary Coolant Pump P50-C '(Pump Casing) TABLE 1 Resolution of Reportable Indications Examination Methods PT,VT Condition Reported Linear Indications Reporting Mechanism DN//DMZ 122383-1 DR/ID-PAL-83-398 Disposition Accept as is.* Page 1 of 1 Re-inspection N/A *All noted are in.the diffuser vanes; far removed from the pressure boundary surface of the casing and therefore do not challenge the integrity of the pressure boundary.
Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code.
The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface. For further information on this refer to DR#D-PAL-83-398.
All records of procedures, personnel and equipment certifications, examination data and dispositions 6&#xa3; all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall.Rd, Jackson, Michigan.
MI0684-0001A-NS03 Page 1 of 1 TABLE 2 Summary of Areas Examined and Results Final -ASME Section XI ASME Section XI Exam Component Examination Item No. Category No. Methods Identification Results Il6.190 B-G-1 MT,UT 2A-1BT-S-l 1 thru 16, Pump Closure Acceptable B6.190 B-G-1 MT 2A-1BT-N;_l 1 thru 16, Pump Closure Nuts Acceptable B6.200 B-G..:..1 VT-1 2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.200 B-G-1 VT-1 2A-1BT-N-1 1 thru . 16. Pump Closure Nuts Acceptable B-G-1 VT-1 Ligaments Acceptable Bl2.20 B-L-2 VT-I ,PT 2A-C, Pump Casing Acceptable
MI0684-0001A-NS03
: :1:jG84-ooo 11i-;;soJ FOR!llS-1 OWNER'!) REPORT FOR INSERVICISPECTIONS As required by the Provisions of the ASME Code Rules Consumers Power Company, 212 W Michican Ave, Jackson, MI
 
: 1. Owner ___ _ (!'Jame and AJJress of Owner) 2. Plant Palisades Nuclear Plant, Route 2, Box 154, Covert, MI 49043 -----*----------*  
Page 1 of 1 TABLE 1 Resolution of Reportable Indications Examination     Condition      Reporting Component              Methods         Reported      Mechanism        Disposition      Re-inspection Primary Coolant Pump P50-C '(Pump Casing)            PT,VT       Linear         DN//DMZ 122383-1 Accept as              N/A Indications    DR/ID-PAL-83-398 is.*
------------(Nam*: and Address of Plane) 3. Plant Unit 1 N/A _______ 4. Owner Certificate of Authorization (if required)
*All indicati~ns noted are in.the diffuser vanes; far removed from the pressure boundary surface of the casing and therefore do not challenge the integrity of the pressure boundary. The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface.
_________
For further information on this refer to DR#D-PAL-83-398.
_ S. Commercial Service Date 12/3l/7l 6. Nuior.al Board Number for Unit _N_B_2_0_8_2_7 _______ _ 7. Components Inspected Manufacturer Component or Manufacturer or Installer State or National Appurtenance o*r Inst all er Serial No. Province No. Board No. -PCP-P50-C Byron-Jackson 0766 N/A N/A ' *-Noll*: Suppkml*ntal sheets in form of lists, sketches, or drawings may bi: used, provided (I) size is 8!/z in. x 11 in., (.:?) i11for111a11,111 i11.itc111s I
MI0684-0001A-NS03
6 011 this.rl*port is i11d11di:c..I on each shl*ct, and (3) cad1 shi:i:t is numbl*rcd and thl' numha of shl'l'ls is rci.:onlcd at thl' top of this form. ( 12/tl2) This Form (E00029) mav be obtainC?d from the Order OC?r>t., ASME, 345 E, 47th St., New York, N.Y. 10017
 
. ' ' ..
Page 1 of 1 TABLE 2 Summary of Areas Examined and Results ASME Section XI Item No.
* FORM NIS* I (l!Jck) 12/16/83 0'-J/04/81.i . 11/10/83 11/10/:13
ASME Section XI Category No.
: 8. Examin:Hion o'ates ------to ____ _ 9. Inspection Interval from to 10. Absr-ract of Examinations.
Exam Methods Component Identification Final Examination Results
Include a list of examinatiom and a statement concerning status of work requircJ for current intcrv:i.I.
                                                                                                                  -
See lSI Report, Table 2 11. Abstract of Conditions Noted See ISI Heport, Table 1 12. Absrr:1cr of Corrective Measures Recommended and Tak1:n See ISI Hcpor t, Table 1 We certify t!::it till' statements m:ide in this f*'P<Hl are correct and the examinations and corrective surcs confor;1:
Il6.190               B-G-1             MT,UT           2A-1BT-S-l 1 thru 16, Pump Closure   Stud~ Acceptable B6.190               B-G-1             MT             2A-1BT-N;_l 1 thru 16, Pump Closure Nuts   Acceptable B6.200               B-G..:..1         VT-1           2A-1BT-S-l 1 thru 16, Pump Closure Studs   Acceptable B6.200               B-G-1             VT-1           2A-1BT-N-1 1 thru . 16. Pump Closure Nuts Acceptable B6~200                B-G-1             VT-1           Ligaments                       Acceptable Bl2.20               B-L-2             VT-I ,PT       2A-C, Pump Casing               Acceptable
t.i th*'
: :1:jG84-ooo 11i-;;soJ
of. tJ1c :\S:\lli Code. Scctic n \I. 1977 Edi ti on, Sum_rner 78 Addenda 10 Anaencm !or Supports Ccrtifi,*atc:
 
of Authori1.ation No. (if applicable)  
FOR!llS-1 OWNER'!) REPORT FOR INSERVICISPECTIONS As required by the Provisions of the ASME Code Rules Consumers Power Company, 212 W Michican Ave, Jackson, MI                                             4~201
*I 1 Expiration Date N/ A Date .
: 1. Owner _ _ __
19 _<f'L s;gn<d Consumers Power Co By z"W v. j,,(t17 /,,/?!L'(_
(!'Jame and AJJress of Owner)
J Owncr CERTIFICATE OF INS:ERVICE INSPECTION I, the lwlding :i valid issued by t:1e N itional Board of and V,i.:'.).2d  
: 2. Plant Palisades Nuclear Plant, Route 2, Box 154, Covert, MI 49043
.* ' c: I' . f I*Jlc*l1io-"n d I db P, otec"G.1..on . anu t11c* ..
                                  - - - - - * - - --------* - - - - - -------
or r<n111.::c o i..;o"' '!O emp oye y o! Ny**---'<  
(Nam*: and Address of Plane)
..... hI::;U12..aCe CD ..
: 3. Plant Unit 1 _ _ _ _ _ _ 4. Owner Certificate of Authorization (if required) _________
1'"'
_                                                                                     N/A              _
inspected the components described m this Owner's H.eport durir.'g t:'er;,,_i J?/Jf-,/*'?
S. Commercial Service Date             12 /3l/7l         6. Nuior.al Board Number for Unit         _N_B_2_0_8_2_7________
n::!r.J./Ol . .
: 7. Components Inspected Manufacturer Component or                           Manufacturer                       or Installer             State or             National Appurtenance                           o*r Inst all er                     Serial No.           Province No.             Board No.
_____ to _ _;-2..L.J..l.:i..--il' , and sta:c that to the best of my knowledge and belief, the o .. "
PCP-P50-C                       Byron-Jackson
has pcrfo;*med
                                                                -                0766                     N/A                 N/A
:ind taken corn:ctive measurl's d.:scribed in this Owner's Report in accordance with i;-,.: requir,*111.:l!ts of the ;\,.;\!E Code, Section XI. Ily this vntific*;;r,*
                                                                                                        '
neitlwr the Inspector nor !:.is employer makes any warranty, expressed or implied. conc,*rnini; the cxarni11:1tions anJ corr.:i.:tin:
                                                                                                                                      *-
measures dc:;cribcd in this Owner's Report. Furthermore, neither th.: lnspl'.:t1*r nor his employc:r shall be liahle in any manner for any personal injury or property damage or a Joss of any kind ari>ing from or cu:im*rtcd with this inspection.
Noll*: Suppkml*ntal sheets in form of lists, sketches, or drawings may bi: used, provided (I) size is 8!/z in. x 11 in.,
__ commissions )J__B
(.:?) i11for111a11,111 i11.itc111s I throul~h 6 011 this.rl*port is i11d11di:c..I on each shl*ct, and (3) cad1 shi:i:t is numbl*rcd and thl' numha of shl'l'ls is rci.:onlcd at thl' top of this form.
* 7 r { o 1n, *c.tt. 41 c
( 12/tl2)                     This Form (E00029) mav be obtainC?d from the Order OC?r>t., ASME, 345 E, 47th St., New York, N.Y. 10017
* National Board, St:ite, Province, and Endorsements -Date _'J._:_JJ_-:
 
___ . __ 19 bJ_ (12/82) l}}
  ..
.~ ' '
* FORM NIS* I (l!Jck) l 12/16/83
: 8. Examin:Hion o'ates - - - - - - t o _ _ _ _
0'-J/04/81.i _ 9.         .
Inspection Interval from 11/10/83      to 11/10/:13
: 10. Absr-ract of Examinations. Include a list of examinatiom and a statement concerning status of work requircJ for current intcrv:i.I.
See lSI Report, Table 2
: 11. Abstract of Conditions Noted See ISI Heport, Table 1
: 12. Absrr:1cr of Corrective Measures Recommended and Tak1:n See ISI Hcpor t, Table 1 We certify t!::it till' statements m:ide in this f*'P<Hl are correct and the examinations and corrective lllc'J-surcs t~kt*r. confor;1: t.i th*' r.u~*s of. tJ1c :\S:\lli Code. Scctic n \I. 1977 Edi ti on, Sum_rner 78 Addenda ;,c~*
Cornp:)n,:n"~::>, 'd1~1t<~~* 10 Anaencm !or Com}Jo~~~t Supports Ccrtifi,*atc: of Authori1.ation No. (if applicable)                         *I 1             Expiration Date         N/ A Date .     *-*-->'-dr--L~f--- 19 _<f'L s;gn<d                         Consumers Power Co             By z"W v. j,,(t17 /,,/?!L'(_
J     ~                                                            Owncr CERTIFICATE OF INS:ERVICE INSPECTION I, the unckrsi~:nl'd. lwlding :i valid co!1!111is~ion issued by t:1e N itional Board of B~ile.r and J'resst~~i; V,i.:'.).2d Insp~.:tor>
                ' ..c: tat*~ or I' r<n111.::c anu.* t11c*                    .      of          I*Jlc*l1io-"n i..;o"'
d     I
                                                                                          '!O emp oye db y P, otec"G.1..on _._J:t~"'-          o!.
Ny**---'< 1.....                                                                                   hI::;U12..aCe CD .. ,~c..l'
        ~'~::'.._'='.:.'.._? '"'                       h~vc inspected the components described m this Owner's H.eport durir.'g th~ t:'er;,,_i J?/Jf-,/*'?                           n::!r.J./Ol
        -:~ _l'.J~.LL.____ _____ to _ _;-2..L.J..l.:i..--il'
                                                                                                                                    .      .
                                                                            , and sta:c that to the best of my knowledge and belief, the o . " n::.-~
has pcrfo;*med ex~:11in;iiions :ind taken corn:ctive measurl's d.:scribed in this Owner's Report in accordance with i;-,.:
requir,*111.:l!ts of the ;\,.;\!E Code, Section XI.
Ily si~:nin!; this vntific*;;r,* neitlwr the Inspector nor !:.is employer makes any warranty, expressed or implied.
conc,*rnini; the cxarni11:1tions anJ corr.:i.:tin: measures dc:;cribcd in this Owner's Report. Furthermore, neither th.:
lnspl'.:t1*r nor his employc:r shall be liahle in any manner for any personal injury or property damage or a Joss of any kind ari>ing from or cu:im*rtcd with this inspection.
fJJ:*.~dLC:__ LJ~~ **.!~V_ _
lnsper!or'!-/Sign:itiJ~--
commissions
                                                                            *
                                                                                        )J__B
* 7r { o           1n, *c.tt. 41 c National Board, St:ite, Province, and Endorsements
        -Date   _'J._:_JJ_-:___ .__ 19 bJ_
(12/82)}}

Revision as of 19:53, 21 October 2019

Inservice Insp Rept for 831216-840504.All Reportable Indications Re Primary Coolant Pumps Evaluated & Dispositioned to Accept as Is
ML18051B048
Person / Time
Site: Palisades Entergy icon.png
Issue date: 08/02/1984
From: Beach D, Esch H, Van Wagner B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18051B047 List:
References
NUDOCS 8408310165
Download: ML18051B048 (29)


Text

{{#Wiki_filter:.,,. Consumers Power Company Palisades Plant - Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984

    ,- 940831ofbs     840002=---~,
    '
  • PDR ADOCK 0500025~

G PDR 8 Pages OC0884-0002B-NL02

INSERVICE lNSPECTION-0~ PC?-PSO-C PAI.ISADES NUCLE.\R POWER PLANT ISI RECORD OF EXi'\HINATION PERIOD 12/16/83 - 05/04/84 REVIEWS AND APPROVALS General Office Palisades Nuclear Power Plant Reviews Reviews z1r6 lf" 1.,fr"*:r 1,. l~cou/t

  • Prepared by (NPS Date 0roj Eng)

Date 1fa<'.LJL'! Date rfN/ll'v~ Pl~nt General Manager

                                                                                  -th.t?l~1 Date Approval                                             Approval

.Ml0484-0030B-NS03

PALISADES NUCLEAR PLANT INSERVICE INSPECTION OF PCP-P50-C Submitted in accordance with ASME Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through Summer, 1978 for components. 1977 Edition, Winter 1978 Addenda for component supports.

1) Date: July 19, 1984
2) Corporate Headquarters: Consumers Power Company 212 W Michigan Ave Jackson, MI 49201
3) Plant: Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043
4) Unit No: 1
5) Commercial Service Date: December 31, 1971
6) Gross Generating Capacity: 830 Mw electric 2400 Mw thermal 7,8,9,10) See attached table and the remainder of the ISI Report
11) Completion Date for Inspections: May 4, 1984
12) Code Inspector(s): Derald C Young Ed Resell Ian Wright
13) Authorized Inspection Agency: Protection Mutual, Norwood, MA
14) Abstract: See ISI Report MI0384-0028B-NS03
                                                                            ~-**

Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE

                                                                                                   -

Manufacturer State Assigned National Board

  • Components or Appurtenance Manufacturer Serial No No No PCP-P50-C Byron-Jackson 0766 N/A N/A r
-U0484-0030B-NS03 i;
*;'                                                                                                  ______
  • PALISADES NUCLEAR POWER PLANT Inservice Inspection of PCP-PSOC The Inservice Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in accordance with the Palisades Plant Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports.

The NDT examinations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques. Indications were recorded in compliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant wen:! documented and transmitted to CPCo, Nuclear Plant Support personnel for evaluation. NPS evaluated all reportabie indications and dispositioncd these by "accepting as is". The examination agency which was utilized in on-site NDT-ISI activities was CPCo System Protection and Laboratory Services (SP&LS). Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code. All records of procedures, personnel and equipment certifications, examination data and dispositions of all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall Rd, Jackson, Michigan. MI0684-0001A-NS03

Page 1 of 1 TABLE 1 Resolution of Reportable Indications Examination Condition Reporting Component Methods Reported Mechanism Disposition Re-inspection Primary Coolant Pump P50-C '(Pump Casing) PT,VT Linear DN//DMZ 122383-1 Accept as N/A Indications DR{/D-PAL-83-398 is.*

  • All indicati~ns noted are in.the diffuser vanes, far removed from the pressure boundary surface of the casing and therefore do not challenge the integrity of *the pressure boundary. The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface.

For further information on this refer to DR#D-PAL-83-398.

                        ,,.

MI0684-0001A-NS03

Page 1 of 1 TABLE 2 Summary of Areas Examined and Results Final ASME Section XI ASME Section XI Exam Component Examination Item No. Category No. Methods Identification Results B6 *. 190 B-G-1 MT,UT 2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.190 B-G-1 MT 2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B6.200 B-G..:.l VT-1 2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.200 B-G-1 VT-1 2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B6~200 B-G-1 VT-1 Ligaments Acceptable Bl2.20 B-1-2* VT-1,PT 2A-C, Pump Casing Acceptable

                     .**

~I0684-0001A-NS03

FOAS-1 OWNER'S REPORT FOR INSERVICE.PECTIONS As required by the Provisions of the ASME Code Rules I Consume.rs Power Company, 212 W Michican Ave, J.ackson, MI !19201

1. Owner _ _ __

(Name and Addrcs~ of Owner) Palisades Nuclear Plant, Route 2, _Box 154,

2. Plant ____________________________ Covert, MI 49043 (Nam*: and Address of Plant)
3. Plant Unit _ _ _ _ 1 _ _ _ _ _ _ 4. Owner Certificate of Authorization (if required) _ _ N/A

_ _ _ _ __

5. Commercial Service Date 12 /3l/7l 6. N.itior.al Board Number for Unit _N_B_2_0_8_2_7_________
7. Components Inspected Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

PCP-P50-C Byron-Jackson 0766 N/A N/A Note: Supplcmrnt:il sheets in form of lists, sketches, or drawings may be used, provided (I) size is 8\li in. x 11 in., {2) informalillll in .it.::111s I through 6 011 this.report is included on each sheet, and (3) each sheet is numbned and the number of sheets is recorded at the top of this form. (12/82) This Form (E00029) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, N.Y. 10017

  • FORM NIS-1 (Back) 12/16/83
8. Examination o'ates _ _ _ _ _ _ c o _ _ _ _

05/04/84 _ 9. . lnspecnon Interval from 11/10/83 co _____ 11/10/93 _

10. Abstract of Examinations. Include a list of examinaciom. and a statement concerning status of work requircJ for current interval.

See ISI Report, Table 2

11. Abstract of Conditions Noted See ISI Heport, 'rn.ble 1
12. Absrr:1cr of Corrective Measures Recommended and Tak1:n See ISI Hepor t, Table 1 We certify th:tt the statements made in this fl'{lort arc correct and the examinations and corrective 111c;,i-surcs takc*r. conforn: tu the 1-,u~s of the AS1'.1E Code, Scctic*n :\I. 1977 Edi ti on, Summer 78. Addenda .!:'er Compon: :nt3, lhr1tt~1* (o Addenda for CompoW~Rt Supports 0

Certificate of Autliori1.ation No. (if applicable) l I____ Expiration Date N/ A Date_ -*--J:.d.~;-L<;f_ ____ 19 _&"'L_s;gncd Consumers Power Co By z1W //. L(vn ifl<<L_ 0 (f 1 Owner CERTIFICATE OF INS:ERVICE INSPECTION I, the t111L!ersi~;ncd, holding a valid con!mis~ion issued by the N .* tional Board of ~oile{ antPresst}nc Yes~~! Insp~ctor:: and the State or l'ro\incc of Micln3an :rnd employell bylro e~ .LOn _ -~'tuu.._

  • of

_t_'~-..,.--~-'----------havc inspected the components described in this Owner's Reporturir."g the oerind N)r*oo'l. Ml\ nsw ""nee DJJ.dtanv  ! _J_?./J.C>/J) ___ to __Q_'i.LOli.J_ll) , and sta*te that to the best of my knowledge and belief, the Owner  ! has performed examinations and taken corrective measurt"s described in this Owner's Report in accordance with the rcquirc*ments of the i\S~lE Code, Section XI. Ily signing this cntit'ieatc neither the Inspector nor his employer makes any warranty, expressed or implied. concerning the cxarnin:itions and corrective measures dc:;cribcd in this Owner's Report. Furthermore, neither the Inspcctor nor his employ..:r shall be liable in any manner for any personal injury or property damage or a loss of any

*kind arising from or connected with this inspection.                                                           .
. J,\           ! t        ) I                    .                                                      ft_
 -~J.~'iJ~,(__(:__ __ ~//i-<_:1_~fL__commissions J)_,8
  • 7 S-{ o 1111 *c.. '-{It __

lnspcctor'!-/Signat1J~-- National Board, State, Province, and Endorsem<::nts Date -~L~1J_~----- 19 VL(_ (12/82)

consumers Power company [TC OI DRMA FILE General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 August 2, 1984 James G Keppler, Administrator Region Ill US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS In accordance with the Palisades Plant Technical Specifications, ASME Code and 10 CFR 50.55, a summary, that includes Approval Sheet, Title Page, NIS-1 Form and Tables that give a summary of the results ot the Inservice Inspection of PCP-P50C is transmitted for your use. This report covers the examination period of December 16, 1983 to May 4, 1984. These examinations were performed after the beginning of the second inspection interval (November 10, 1983) and Consumers Power Company is therefore taking credit tor them in the second interval. Copies of the attached report are being transmitted to S J Miergwa Chief - Boiler Division, State of Michigan Department of Labor per require-ments of the ASME Code. Brian D Johnson (Signed) Brian D Johnson Staff Licensing Engineer CC Director, Office ot Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment OC0884-0002-NL02

Consumers Power Company Palisades Plant - Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984 8 Pages OC0884-0002B-NL02

INSERVICE INSPECTION-OF PC?-PSO-C PAJ.ISADES NUCLE.\::l POWER PI.ANT ISI RECORD OF EXl\HINATION PERIOD 12/16/83 - 05/04/84 REVIEWS AND APPROVALS Palisades Nuclear Power *Plant General Off ice Reviews Reviews

zJ,,._(A l( I .fr::** ( 1.~r/!t11\ 7/1q/-;~1 7 ,?<i.~l1*
                                                                                                           ----- .;..;l-  ...

Prepared by (NPS Vroj Eng) ~ Late a/1~)

  • __,4:~*;,-~ ~; ~;
                                                                                                            .., / , ' /" ._r f   Ii\-: ... *~. /~-- - * - * - * - .)     ,/    '~ "- '*.' .
  • Da r.e Prant3c-,.:1mical Supt Date
                                                           . C~------        ..

7/~o/Ji.( rf!Nlr_i'\~.

                                                 'Dat'e             Plant Cericral Manager
                                                                                                          *1
                                                                                                          . Date h.i:,/~1 Approval                                                       Approval U~""':_' !L, L Director. NPS

.Ml0484-0030B-NS03

PALISADF.S NUCLEAR PLANT INSERVICE INSPECTION OF PCP-P50-C Submitted in accordance with ASME Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through_ Summer, 1978 for components. 1977 Edition, Winter 1978 Addenda for component supports.

1) Date: July 19, 1984
2) Corporate Headquarters: Consumers Power Company 212 W Michigan Ave Jackson, MI 49201 . I
3) Plant: Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043
4) Unit No: 1
5) Conunercial Service Date: December 31, 1971
6) Gross Generating Capacity: 830 Mw electric 2400 Mw thermal 7,8,9,10) See attached table and the remainder of the ISI Report
11) Completion Date for Inspections: May 4, 1984
12) Code Inspector(s): Derald C Young Ed Resell Ian Wright
13) Authorized Inspection Agency: Protection Mutual, Norwood, MA
14) Abstract: See ISI Report
                                                                        '*

Ml0384-0028B-NS03

                                                                                               ...

Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE Manufacturer State Assigned National Board

  • Components or Appurtenance Manufacturer Serial No No No PCP-P50-C Byron-Jackson 0766 N/A N/A
                        ,.

~I0484-0030B-NS03

PALISADES NUCLEAR POWER PLANT Inservicc Inspection of PCP-P50C The Inservicc Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in accordance with the Palisades Plant Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports. The NDT exaQinations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques. Indications were recorded in coQpliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant were documented and transmitted to CPCo, Nuclear Plant Support personnel for evaluation. NPS evaluated all reportable indications and dispositioncd these by "accepting as is". The examination agency which was utilized in on-site NDT-ISI activities was CPCo Syst~m Protection and Laboratory Services (SP&LS). Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code. All records of procedvres, personnel and equipment certifications, examination data and dispositions of all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall Rd, Jackson, Michigan. MI0684-0001A-NS03

Page 1 of 1 TABLE 1 Resolution of Reportable Indications Examination Condition Reporting Component Methods Reported Mechanism* Disposition Re-inspection Primary Coolant Pump P50-C *(Pump Casing) . PT, VT Linear DN/IDMZ 122383-1 Accept as N/A Indications DR{ID-PAL-83-398 is~*

  • All indicati<?ns noted.are in.the diffuser vanes, far removed from the pressure* boundary surfa~e of the casing and therefore do not challenge the integrity of the pressure boundary. The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface.

For further information on this refer to DR#D-PAL-83-398. MI0684-0001A-NS03

Page 1 of 1 TABLE 2 Summary of Areas Examined and Results ASME Section XI Item No. Il6." 190 ASME Section XI Category No. B-G-1 Exam Methods MT,UT Component Identification 2A-1BT-S-l Final Examination Results

  • 1 thru 16, Pump Closure Studs Acceptable B6.190 B-G-1 MT 2A-1BT-N.:..l 1 thru 16, Pump Closure Nuts Acceptable B6.200 B-G,;.l VT-1 2A-1BT-'S-l 1 thru 16, Pump Closure Studs Acceptable B6.200 B-G-1 VT-1 2A-1BT-N-l 1 thru 16, Pump Closure Nuts Acceptable B6~200 B-G-1 VT-1 Ligaments Acceptable B12.20 B-L-2 VT-1,PT 2A-C, Pump Casing Acceptable
:1:j684-ooo lA-;;soJ

I 9* A FORM NIS-1 OWNER'!i REPORT FOR INSERVIC~SPECTIONS As required by the l'n>visions of the ASME Code Rules Consumers Power Comrany, 212 W Michican Ave, Jackson, MI 4~201

1. Owner _ _ __
                                    ---------**------

(!',jame anJ AJJres.~ of Owner)

2. Plant Palisades Nuclear Plruit, Route 2, Box 154, Covert, MI 49043
                           * - - - - - *-----*----* ------*-*

(Nam*: and Address of Plant)

3. Plant Unit 1 N/A
                          - - - - - - 4. Owner Certificate of Authorization (if required)_.- - - - - - - - -

S. Commercial Service Date 12 /3l/7l 6. Nitior.al Board Number for Unit __N_B_2_0_8_2_7________

7. Components Inspected Manufacturer Component or Manufacturer* or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

PCP-P50-C Byron-Jackson

                                                      -             0766                    N/A                 N/A
                                           '

Note: Suppkllll'nlJI shccts in form of lists, sketches, or drawings may be used, provided (I) size is Sliz in. x 11 in., (2) i11formatllln in .itcms I through 6 on this.rl*port is indudl'U on each sht:cl, and (3) ead1 sheet is numbl*red and thl' number of shl'l'ts is recorded at the top of this form. (12/t12l This Form (E00029) may be ol>tain<?d from the Order Dept,. ASME, 345 E. 47th St., New*York, N.Y. 10017

  • .

FORM NIS-1 (B:ick) 12/16/83 05/04/84 11/10/83 11/10/93

8. Examination o':itcs - - - - - - t o _ _ _ _ _ 9. Inspection Interval from to
10. A!Jsr-racc of Examinations. Include a list of examinatiom and a statement concerning status of work requircJ for l"urrcnt intcrv:il.

See ISI Report, Table 2

11. Abstract of Con.litions Noted See ISI Peport, 'rable 1
12. Absrr:ict of Corrective Measures Recommended anJ 1'ak.~n See ISI I\cport, Table 1 We certify t!::1t the statements made in this rL'Jlc>rl arc correct and the examinations and corrective ni.:J-surcs tJ!:,*r. confor;:: t-i tlil' ru1.l;*s of th.: :\S~!E Code. Scctir.n XI. 1977 Edition, Sum.TJler 78 Addenda .:~c:*

Cornp.'.)r!":n-::.s, Hi!1t,0>:* *10 Adden(ta for ComJJo~e~t Supports Certifi,:atc of Authorization No. (if applicable) *I.!....___ Expiration Date N/ A Date.-*-- ~!.:.l~f-L~f--- l9 .d'L s;gned Consumers Power Co By z3;tl V'. IA'in /,,7""-'\_ (/ (f Owner CERTIFICATE OF IN SERVICE INSPECTION I, the tinckrsi~:nl'd. lwlding a valid co!1!mis~ion issued by be N 1tional Board of Boile,r and J'resst)~<; V,e,~~l Insp-:!.:tor~

             ' s._t 2tc ~~t-I!'()\
                                '*             f      1'*J1cl11cr"n                     d         db.Protec-c.J..on ... 1.rc~~-                  .

a1~ d _t:i;_ 111.::i.: o ~c.. *in emp 1oye YIlr::, Ul 2.llc e C:'J,:, ~'C.!l , o! No.i '~~~'..:.'....~ -' 1 h~vc impcctcd the components described Ill this Owner's H.eport durir{g the t:'er;;,,i _J.? / J0_i.).l______ to_05.lQlVJ.l),_____ , and sta:L' that to the best of my knowledge and belief. the o . . nc; has performed exa:11in:;i inns :ind taken com:ctive me::isuft's d,:scribed in this Owner's Report in accordance with i:*,c requir,*1ncl!ts of !ht: ;\:~:in: Code, Section XI. Ily si'.:ning this l*ntifiL':.:k neither the Inspector nor t..is employer makes any warranty, expressed or imp!kcl. conc<*rnini; the: cxai11i11:1lions and corrective measures dc:;cribcd in this Owner's Report. Furthermore, neither 1)1..: Insprct"r nor his cmployi.:r shall be li:ihle in any manner for any personal injury or property damage or a loss of any kind ari~ing from or co:im*ctcd with this inspection. _§JJ:-:. dLC:__ L// *'1-~V_ _ Insprc!or\ 1 Sig11:1t1J~-- commissions ).)_.[]

  • 7r { o 1111.c.lt. '-{I c _

National Board, State, Province, and Endorsemo::nts

   . Date     _'J._::__'J._J_-:_ ____ 19 _t!:{_

(12/82)

.

~- e ett0-t~ consumers Power PAO company SGA EIC DRMJ.\ General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 August 2, 1984 . James G Keppler, Administrator Region Ill US Nuclear Regulatory Connnission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS In accordance with the Palisades Plant Technical Specifications, ASME Code and 10 CFR 50.55, a summary, that includes Approval Sheet, Title Page, NIS-1 Form and Tables that give a summary of the results ot the Inservice Inspection of PCP-J:>50C is transmitted for your use. This report covers the examination period of December 16, 1983 to May 4, 1984. ~hese examinations were performed after the beginning of the second inspection interval (November 10, 1983) and Consumers Power Company is therefore taking credit tor them in the second interval. Copies of the attached report are being transmitted to S J Miergwa Chief - Boiler Division, State of Michigan Department of Labor per require-ments of the ASME Code. Brian D Johnson (Signed) Brian D Johnson Staff Licensing Engineer CC Director, Office ot Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades Attachment

                                                                                         .,
                                                                                       . l OC0884-0002-NL02

Consumers Power Company Palisades Plant - Docket 50-255 INSERVICE INSPECTION REPORT OF PALISADES' PRIMARY COOLANT PUMPS August 2, 1984 8 Pages OC0884-0002B-NL02

INSERVICE INSPECTION-OF PC?-P50-C PAI.lSADES NUCLL\:Z POWER PLANT ISI RECORD OF EXAMINATION PERIOD 12/16/83 - 05/04/84 REVIEWS AND APPROVALS Palisades Nuclear Pcwer Plant General Off ice Reviews Reviews Late

                                                       ,,_.;.r-:::,-...
                                               ~///'.,o'j )                           .--/,.
                                              !' I'~*-* , .I            -*-*- -          I        , /**-r I  J ..

I . . --

"'<~----- ~--* *;, I , .,. - *.

Prant '1cdmical Supt Date c~;> -- 1/o":/N 1

                                   'Dat e rf!N./r_~'vs-~

Plant General Manager 1 l1..i:1l ~1 Date Approval Approval ew\V\,0,.~ /'l--i. I &_J~'1 c j . ~0-l( *H

           ....

t,.1- i Director, NPS r1<.L Plant General Manager 7

                                                                                       -

Date

.Ml0484-0030B-NS03

PALISADF.S NUCLEAR PLANT. INSERVICE INSPECTION OF PCP-PSO-C Submitted in accordance with ASM~ Boiler and Pressure Vessel Code, Section XI, Article IWA-6000, 1977 Edition with Addenda through Summer, 1978 for components. 1977 Edition, Winter 1978 Addenda for component supports.

1) Date: July 19, 1984
2) torporate Headquarters: Consumers Power Company 212 W Michigan Ave Jackson, MI 49201
3) Plant: Palisades Nuclear Power Plant Route 2, Box 154 Covert, MI 49043
4) Unit No: 1
5) Conunercial Service Date: December 31, 1971
6) Gross Generating Capacity: 830 Mw electric 2400 Mw thermal 7,8,9,10) See attached table and the remainder of the IS! Report
11) Completion Date for Inspections: May 4, 1984
12) Code Inspector(s): Derald C Young Ed Resell Ian Wright
13) Authorized Inspection Agency: Protection Mutual, Norwood, MA
14) Abstract: See !SI Report
                                                                        '*

MI0384-0028B-NS03

                                                                                               ... ~

Item 7, 8, 9, 10 MAJOR COMPONENTS INSPECTED TABLE Manufacturer State Assigned National Board

  • Components or Appurtenance Manufacturer Serial No No No PCP-P50-C Byron-Jackson 0766 N/A N/A

~I0484-00JOB-NS03

PALISADES NUCLEAR POWER PLANT Inservicc Inspection of PCP-PSOC The Inservicc Inspection of PCP-PSOC was conducted during the period of December 16, 1983 through May 4, 1984. Inspections were conducted in

  • accordance with the Palisades Plani Technical Specification, Section 4.3. The ASME Specification is as follows: Section XI 1977 Edition Summer 1978 Addenda for Components, 1977 Edition Winter 1978 Addenda for Components Supports.

The NDT exDninations were performed using magnetic particle (MP), manual ultrasonic (UT), and visual (VT), and liquid penetrant (PT) techniques. Indications were recorded. in compliance with applicable procedures; reportable indications which were judged by the examination agencies to be relevant were documented and transmitted to CPCo. Nuclear Plant Support personnel for evaluation. NPS evaluated all reportable indications and dispositioncd thes~ by "accepting as is". The examination agency which was utilized in on-site NDT-ISI activities was CPCo System Protection and Laboratory Services (SP&LS). Inspection personnel were qualified in accordance with the requirements set forth by IWA-2300, Section XI of ASME B&PV code. All records of procedures, personnel and equipment certifications, examination data and dispositions 6£ all reportable indications are on file at the Palisades Nuclear Plant and also in the General Office, 1945 W Parnall.Rd, Jackson, Michigan. MI0684-0001A-NS03

Page 1 of 1 TABLE 1 Resolution of Reportable Indications Examination Condition Reporting Component Methods Reported Mechanism Disposition Re-inspection Primary Coolant Pump P50-C '(Pump Casing) PT,VT Linear DN//DMZ 122383-1 Accept as N/A Indications DR/ID-PAL-83-398 is.*

  • All indicati~ns noted are in.the diffuser vanes; far removed from the pressure boundary surface of the casing and therefore do not challenge the integrity of the pressure boundary. The increasing section thickness of the vanes greatly reduces the likelihood of these indications propagating to the pressure retaining surface.

For further information on this refer to DR#D-PAL-83-398. MI0684-0001A-NS03

Page 1 of 1 TABLE 2 Summary of Areas Examined and Results ASME Section XI Item No. ASME Section XI Category No. Exam Methods Component Identification Final Examination Results

                                                                                                                  -

Il6.190 B-G-1 MT,UT 2A-1BT-S-l 1 thru 16, Pump Closure Stud~ Acceptable B6.190 B-G-1 MT 2A-1BT-N;_l 1 thru 16, Pump Closure Nuts Acceptable B6.200 B-G..:..1 VT-1 2A-1BT-S-l 1 thru 16, Pump Closure Studs Acceptable B6.200 B-G-1 VT-1 2A-1BT-N-1 1 thru . 16. Pump Closure Nuts Acceptable B6~200 B-G-1 VT-1 Ligaments Acceptable Bl2.20 B-L-2 VT-I ,PT 2A-C, Pump Casing Acceptable

:1:jG84-ooo 11i-;;soJ

FOR!llS-1 OWNER'!) REPORT FOR INSERVICISPECTIONS As required by the Provisions of the ASME Code Rules Consumers Power Company, 212 W Michican Ave, Jackson, MI 4~201

1. Owner _ _ __

(!'Jame and AJJress of Owner)

2. Plant Palisades Nuclear Plant, Route 2, Box 154, Covert, MI 49043
                                  - - - - - * - - --------* - - - - - -------

(Nam*: and Address of Plane)

3. Plant Unit 1 _ _ _ _ _ _ 4. Owner Certificate of Authorization (if required) _________

_ N/A _ S. Commercial Service Date 12 /3l/7l 6. Nuior.al Board Number for Unit _N_B_2_0_8_2_7________

7. Components Inspected Manufacturer Component or Manufacturer or Installer State or National Appurtenance o*r Inst all er Serial No. Province No. Board No.

PCP-P50-C Byron-Jackson

                                                               -                0766                     N/A                 N/A
                                                                                                       '
                                                                                                                                     *-

Noll*: Suppkml*ntal sheets in form of lists, sketches, or drawings may bi: used, provided (I) size is 8!/z in. x 11 in., (.:?) i11for111a11,111 i11.itc111s I throul~h 6 011 this.rl*port is i11d11di:c..I on each shl*ct, and (3) cad1 shi:i:t is numbl*rcd and thl' numha of shl'l'ls is rci.:onlcd at thl' top of this form. ( 12/tl2) This Form (E00029) mav be obtainC?d from the Order OC?r>t., ASME, 345 E, 47th St., New York, N.Y. 10017

 ..

.~ ' '

  • FORM NIS* I (l!Jck) l 12/16/83
8. Examin:Hion o'ates - - - - - - t o _ _ _ _

0'-J/04/81.i _ 9. . Inspection Interval from 11/10/83 to 11/10/:13

10. Absr-ract of Examinations. Include a list of examinatiom and a statement concerning status of work requircJ for current intcrv:i.I.

See lSI Report, Table 2

11. Abstract of Conditions Noted See ISI Heport, Table 1
12. Absrr:1cr of Corrective Measures Recommended and Tak1:n See ISI Hcpor t, Table 1 We certify t!::it till' statements m:ide in this f*'P<Hl are correct and the examinations and corrective lllc'J-surcs t~kt*r. confor;1: t.i th*' r.u~*s of. tJ1c :\S:\lli Code. Scctic n \I. 1977 Edi ti on, Sum_rner 78 Addenda ;,c~*

Cornp:)n,:n"~::>, 'd1~1t<~~* 10 Anaencm !or Com}Jo~~~t Supports Ccrtifi,*atc: of Authori1.ation No. (if applicable) *I 1 Expiration Date N/ A Date . *-*-->'-dr--L~f--- 19 _<f'L s;gn<d Consumers Power Co By z"W v. j,,(t17 /,,/?!L'(_ J ~ Owncr CERTIFICATE OF INS:ERVICE INSPECTION I, the unckrsi~:nl'd. lwlding :i valid co!1!111is~ion issued by t:1e N itional Board of B~ile.r and J'resst~~i; V,i.:'.).2d Insp~.:tor>

                ' ..c: tat*~ or I' r<n111.::c anu.* t11c*                    .      of          I*Jlc*l1io-"n i..;o"'

d I

                                                                                          '!O emp oye db y P, otec"G.1..on _._J:t~"'-           o!.

Ny**---'< 1..... hI::;U12..aCe CD .. ,~c..l'

        ~'~::'.._'='.:.'.._? '"'                        h~vc inspected the components described m this Owner's H.eport durir.'g th~ t:'er;,,_i J?/Jf-,/*'?                            n::!r.J./Ol
        -:~ _l'.J~.LL.____ _____ to _ _;-2..L.J..l.:i..--il'
                                                                                                                                    .      .
                                                                            , and sta:c that to the best of my knowledge and belief, the o . " n::.-~

has pcrfo;*med ex~:11in;iiions :ind taken corn:ctive measurl's d.:scribed in this Owner's Report in accordance with i;-,.: requir,*111.:l!ts of the ;\,.;\!E Code, Section XI. Ily si~:nin!; this vntific*;;r,* neitlwr the Inspector nor !:.is employer makes any warranty, expressed or implied. conc,*rnini; the cxarni11:1tions anJ corr.:i.:tin: measures dc:;cribcd in this Owner's Report. Furthermore, neither th.: lnspl'.:t1*r nor his employc:r shall be liahle in any manner for any personal injury or property damage or a Joss of any kind ari>ing from or cu:im*rtcd with this inspection. fJJ:*.~dLC:__ LJ~~ **.!~V_ _ lnsper!or'!-/Sign:itiJ~-- commissions

                                                                            *
                                                                                       )J__B
  • 7r { o 1n, *c.tt. 41 c National Board, St:ite, Province, and Endorsements
       -Date    _'J._:_JJ_-:___ .__ 19 bJ_

(12/82)}}