{{#Wiki_filter:ADMINISTRATIVE CONTROLS COMPOSITION 6.5.1.2 The Station Operations Review Committee shall be composed of the: Chairman:
{{#Wiki_filter:ADMINISTRATIVE CONTROLS COMPOSITION 6.5.1.2 The Station Operations Review Committee shall be composed of the:
Vice Chairman:
Chairman:                 Assistant General Manager - Salem Operations Vice Chairman:            Operations Manager Vice Chairman:            Technical Manager Vice Chairman:            Maintenance Manager Member:                  Operating Engineer Member:                  I&C Engineer Member:                  Senior Shift Supervisor Member:                  Technical Engineer Member:                  Maintenance Engineer Member:                  Radiation Protection Engineer Member:
Vice Chairman:
Member:
Vice Chairman:
Station Planning Engineer Chemistry Engineer I
Member: Member: Member: Member: Member: Member: Member: Member: Member: ALTERNATES Assistant General Manager -Salem Operations Operations Manager Technical Manager Maintenance Manager Operating Engineer I&C Engineer Senior Shift Supervisor Technical Engineer Maintenance Engineer Radiation Protection Engineer Station Planning Engineer Chemistry Engineer Safety Review Engineer 6.5.1.3 All alternate members shall be appointed in writing by the SORC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in SORC activities at any one time. MEETING FREQUENCY 6.5.1.4 The SORC shall meet at least once per calendar month and as convened by the SORC Chairman or his designated alternate.
Member:                  Safety Review Engineer                           I ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the SORC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in SORC activities at any one time.
MEETING FREQUENCY 6.5.1.4 The SORC shall meet at least once per calendar month and as convened by the SORC Chairman or his designated alternate.
QUORUM 6.5.1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.
QUORUM 6.5.1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.
RESPONSIBILITIES 6.5.1.6 The Station Operations Review Committee shall be responsible for: a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) all programs required by Specification 6.8 and changes thereto, and 3) any other proposed procedures or changes thereto as determined by the General Manager -Salem Operations to affect nuclear safety. b. Review of all proposed tests and experiments that affect nuclear safety. c. Review of all proposed changes to Appendix "A" Technical Specifications.
RESPONSIBILITIES 6.5.1.6   The Station Operations Review Committee shall be responsible for:
SALEM -UNIT 1 ---8369:300279 830923 PDR ADOCK 05000272 p. PDR 6-7 I I ADMINISTRATIVE CONTROLS COMPOSITION 6.5.1.2 The Station Operations Review Committee shall be composed of the: Chairman:
: a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) all programs required by Specification 6.8 and changes thereto, and 3) any other proposed procedures or changes thereto as determined by the General Manager - Salem Operations to affect nuclear safety.
Vice Chairman:
: b. Review of all proposed tests and experiments that affect nuclear safety.
Vice Chairman:
: c. Review of all proposed changes to Appendix "A" Technical Specifications.
Vice Chairman:
SALEM - UNIT 1                         6-7
Member: Member: Member: Member: Member: Member: Member: Member: Member: ALTERNATES Assistant General Manager -Salem Operations Operations Manager Technical Manager Maintenance Manager Operating Engineer I&C Engineer Senior Shift Supervisor Technical Engineer Maintenance Engineer Radiation Protection Engineer Station Planning Engineer Chemistry Engineer Safety Review Engineer 6.5.1.3 All alternate members shall be appointed in writing by the SORC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in SORC activities at any one time. MEETING FREQUENCY 6.5.1.4 The SORC shall meet at least once per calendar month and as convened by the SORC Chairman or his designated alternate.
-- - 8369:300279 830923 PDR   ADOCK 05000272
: p.                   PDR
 
ADMINISTRATIVE CONTROLS COMPOSITION 6.5.1.2 The Station Operations Review Committee shall be composed of the:
Chairman:                 Assistant General Manager - Salem Operations Vice Chairman:            Operations Manager Vice Chairman:            Technical Manager Vice Chairman:            Maintenance Manager Member:                    Operating Engineer Member:                    I&C Engineer Member:                    Senior Shift Supervisor Member:                  Technical Engineer Member:                    Maintenance Engineer Member:                  Radiation Protection Engineer Member:
Member:
Station Planning Engineer Chemistry Engineer I
Member:                    Safety Review Engineer                           t ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the SORC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in SORC activities at any one time.
MEETING FREQUENCY 6.5.1.4 The SORC shall meet at least once per calendar month and as convened by the SORC Chairman or his designated alternate.
QUORUM 6.5.1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.
QUORUM 6.5.1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.
RESPONSIBILITIES 6.5.1.6 The Station Operations Review Committee shall be responsible for: a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) all programs required by Specification 6.8 and changes thereto, and 3) any other proposed procedures or changes thereto as determined by the General Manager -Salem Operations to affect nuclear .safety. b. Review of all proposed tests and experiments that affect nuclear safety. c. Review of all proposed changes to Appendix 11 A 11 Technical Spec ifi cations. SALEM -UNIT 2 6-7 I t}}
RESPONSIBILITIES 6.5.1.6 The Station Operations Review Committee shall be responsible for:
: a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) all programs required by Specification 6.8 and changes thereto, and 3) any other proposed procedures or changes thereto as determined by the General Manager - Salem Operations to affect nuclear
          .safety.
: b. Review of all proposed tests and experiments that affect nuclear safety.
: c. Review of all proposed changes to Appendix   11 A11 Technical Spec ifi cations.
SALEM - UNIT 2                         6-7}}

Latest revision as of 13:30, 21 October 2019

Proposed Tech Specs Re Administrative Controls for Overtime Limitations,Porv & Safety Valve Challenge/Failure Reporting & Audits
ML18089A382
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/23/1983
From:
Public Service Enterprise Group
To:
Shared Package
ML18089A381 List:
References
NUDOCS 8309300279
Download: ML18089A382 (2)


Text

ADMINISTRATIVE CONTROLS COMPOSITION 6.5.1.2 The Station Operations Review Committee shall be composed of the:

Chairman: Assistant General Manager - Salem Operations Vice Chairman: Operations Manager Vice Chairman: Technical Manager Vice Chairman: Maintenance Manager Member: Operating Engineer Member: I&C Engineer Member: Senior Shift Supervisor Member: Technical Engineer Member: Maintenance Engineer Member: Radiation Protection Engineer Member:

Member:

Station Planning Engineer Chemistry Engineer I

Member: Safety Review Engineer I ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the SORC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in SORC activities at any one time.

MEETING FREQUENCY 6.5.1.4 The SORC shall meet at least once per calendar month and as convened by the SORC Chairman or his designated alternate.

QUORUM 6.5.1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.

RESPONSIBILITIES 6.5.1.6 The Station Operations Review Committee shall be responsible for:

a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) all programs required by Specification 6.8 and changes thereto, and 3) any other proposed procedures or changes thereto as determined by the General Manager - Salem Operations to affect nuclear safety.
b. Review of all proposed tests and experiments that affect nuclear safety.
c. Review of all proposed changes to Appendix "A" Technical Specifications.

SALEM - UNIT 1 6-7

-- - 8369:300279 830923 PDR ADOCK 05000272

p. PDR

ADMINISTRATIVE CONTROLS COMPOSITION 6.5.1.2 The Station Operations Review Committee shall be composed of the:

Chairman: Assistant General Manager - Salem Operations Vice Chairman: Operations Manager Vice Chairman: Technical Manager Vice Chairman: Maintenance Manager Member: Operating Engineer Member: I&C Engineer Member: Senior Shift Supervisor Member: Technical Engineer Member: Maintenance Engineer Member: Radiation Protection Engineer Member:

Member:

Station Planning Engineer Chemistry Engineer I

Member: Safety Review Engineer t ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the SORC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in SORC activities at any one time.

MEETING FREQUENCY 6.5.1.4 The SORC shall meet at least once per calendar month and as convened by the SORC Chairman or his designated alternate.

QUORUM 6.5.1.5 The minimum quorum of the SORC necessary for the performance of the SORC responsibility and authority provisions of these technical specifications shall consist of the Chairman or his designated alternate and four members including alternates.

RESPONSIBILITIES 6.5.1.6 The Station Operations Review Committee shall be responsible for:

a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) all programs required by Specification 6.8 and changes thereto, and 3) any other proposed procedures or changes thereto as determined by the General Manager - Salem Operations to affect nuclear

.safety.

b. Review of all proposed tests and experiments that affect nuclear safety.
c. Review of all proposed changes to Appendix 11 A11 Technical Spec ifi cations.

SALEM - UNIT 2 6-7