{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
DISTRIBUTION
 
DEMONSTRATION
==SUBJECT:==
SYSTEM SUBJECT: Revises response to violations
Revises response to violations noted in Insp Repts 50-259/89-16,50-260/89-16
noted in Insp Repts 50-259/89-16,50-260/89-16
&50-296/89-16 re area walkdowns; DISTRIBUTION CODE: IE01D COPXES RECEIVED:LTR ENCL~SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:1 Copy each to: B.Wilson,S.
&50-296/89-16
BLACK 1 Copy each to: S.Black,B.WILSON 1 Copy each to: S.Black,B.WILSON D/05000259 05000260 05000296 D REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ESSION NBR:9012070138 DOC.DATE: 90/12/03 NOTARIZED:
re area walkdowns;
NO DOCKET ACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 95000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH;NAME AUTHOR AFFILIATION MEDFORD,M.O.
DISTRIBUTION
Tennessee Valley Authority RECIP.NAME RECXPIENT AFFILIATION Document Control Branch (Document Control Desk)RECIPIENT ID CODE/NAME HEBDON,F ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA/OEAB
CODE: IE01D COPXES RECEIVED:LTR
'RR/DRIS/DIR NRR/PMAS/ILRB12 OE DIR IL 02 EXTERNAL EG&G/BRY CE I J~H~NSIC NOTES COPIES LTTR ENCL 2 1 1 1 1'1 1'RECIPIENT ID CODE/NAME ROSS,T.AEOD AEOD/TPAB NRR MOR I S S EAU I D NRR/DLPQ/LPEB10 NRR/DRE P/PEPB9 D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:
ENCL~SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
PLEASE HELP US TO REDUCE O'ASTE!CONTACT THE DOCUMENT CONTROL DESK, t ROOXI Pl-."'7 (EYT.2II79)TO ELli~llNATE YOUR NAiXIE FROivl DISTRIBUTION I.ISTS FOR DOCUP,IENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL D D  
of Violation Response NOTES:1 Copy each to: B.Wilson,S.
'\
BLACK 1 Copy each to: S.Black,B.WILSON
Tenn mrs'ee Va!,'ey Aurncn'.y)10>Ma<<e'.S!ice;Chai:ancoga, Tennessee 37402 fuIark O.Medforo vice presidenrNucrea Assurance t ce s"y ana Fels DEC 09 1990 U.S.Nuclear Regulatory Commission ATTN: 'ocument Control Desk Washington, D.CD 20555 Gentlemen:
1 Copy each to: S.Black,B.WILSON
D/05000259 05000260 05000296 D REGULATORY
INFORMATION
DISTRIBUTION
SYSTEM (RIDS)ESSION NBR:9012070138
DOC.DATE: 90/12/03 NOTARIZED:
NO DOCKET ACIL:50-259
Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 95000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH;NAME AUTHOR AFFILIATION
MEDFORD,M.O.
Tennessee Valley Authority RECIP.NAME
RECXPIENT AFFILIATION
Document Control Branch (Document Control Desk)RECIPIENT ID CODE/NAME HEBDON,F ACRS AEOD/DEIIB
DEDRO NRR SHANKMAN,S
NRR/DOEA/OEAB
'RR/DRIS/DIR
NRR/PMAS/ILRB12
OE DIR IL 02 EXTERNAL EG&G/BRY CE I J~H~NSIC NOTES COPIES LTTR ENCL 2 1 1 1 1'1 1'RECIPIENT ID CODE/NAME ROSS,T.AEOD AEOD/TPAB NRR MOR I S S EAU I D NRR/DLPQ/LPEB10
NRR/DRE P/PEPB9 D NRR/DST/DIR
8E2 NUDOCS-ABSTRACT
OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE O'ASTE!CONTACT THE DOCUMENT CONTROL DESK, t ROOXI Pl-."'7 (EYT.2II79)TO ELli~llNATE
YOUR NAiXIE FROivl DISTRIBUTION
I.ISTS FOR DOCUP,IENTS
YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL D D  
'\  
Tenn mrs'ee Va!,'ey Aurncn'.y)10>Ma<<e'.S!ice;Chai:ancoga, Tennessee 37402 fuIark O.Medforo vice presidenrNucrea
Assurance t ce s"y ana Fels DEC 09 1990 U.S.Nuclear Regulatory
Commission
ATTN: 'ocument Control Desk Washington, D.CD 20555 Gentlemen:
In the Hatter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296.BROWNS FERRY NUCLEAR PLANT,(BFN)
In the Hatter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296.BROWNS FERRY NUCLEAR PLANT,(BFN)
-UNITS 1, 2 AND 3-NRC INSPECTION
-UNITS 1, 2 AND 3-NRC INSPECTION REPORT NOS.50-259/89-16, 50-260/89-16, 50-296/89-16
REPORT NOS.50-259/89-16, 50-260/89-16, 50-296/89-16
-REVISION To NOTICE OF VIOLATION RESPONSE  
-REVISION To NOTICE OF VIOLATION RESPONSE References:
 
1.Letter from H.0.Hedford to NRC dated April 9, 1990,"Browns Ferry Nuclear Plant (BFN)-Units 1, 2 and 3, NRC Inspection
==References:==
Report Nos.50-259/89-16, 50-260/89-16, and 50-296/89-16
 
-Response to Notice of Violation" 2.Letter from M.0.Medford to NRC dated August 14, 1990,"Browns Ferry Nuclear Plant (BFN)-Units 1, 2 and 3-NRC:.nspection
1.Letter from H.0.Hedford to NRC dated April 9, 1990,"Browns Ferry Nuclear Plant (BFN)-Units 1, 2 and 3, NRC Inspection Report Nos.50-259/89-16, 50-260/89-16, and 50-296/89-16
Report Nos.50-259/89-16, 50-260/89-16, 50-296/89-16
-Response to Notice of Violation" 2.Letter from M.0.Medford to NRC dated August 14, 1990,"Browns Ferry Nuclear Plant (BFN)-Units 1, 2 and 3-NRC:.nspection Report Nos.50-259/89-16, 50-260/89-16, 50-296/89-16
-Revision to Notice of Violation Response" TVA committed in Reference 2 to complete area walkdowns by December 3, 1990.This commitment
-Revision to Notice of Violation Response" TVA committed in Reference 2 to complete area walkdowns by December 3, 1990.This commitment date was based on a scheduled Unit 2 restart date of December 5, 1990, and the need to conduct the walkdowns after completion of all modification and maintenance activities.
date was based on a scheduled Unit 2 restart date of December 5, 1990, and the need to conduct the walkdowns after completion
This letter is provided to extend the completion date for this item.The performance of Unit 2 area walkdowns will be completed by restart.Current levels of maintenance and modification activities in the plant make it inappropriate to perform the area walkdowns by December 3, 1990.  
of all modification
 
and maintenance
U.S.Nuclear Regulatory Commission OEC 03 1gPP The enclosure to this letter provides the revised commitment date., If you have any questions, please call Patrick P.Carier at (205)729-3566.Very truly yours, TENNESSEE VALLEY AUTHORITY.'ark 0.Medford Enclosures cc (Enclosures):
activities.
Ms.S.C.Black, Deputy Director Project Directorate 11-4 U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Mr.Thierry M.Ross, Project Manager U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 iMr.B.A.Wilson, Project Chief U.S.Nuclea Regulatory Commission Region II 101 iMarietta Street, NW, Suite 2900 Atlanta, Georgia 30323  
This letter is provided to extend the completion
 
date for this item.The performance
ENCLOSURE SUi&IARY OF COI'NITMENTS Area walkdowns will be completed for Unit 2 by restart: (Violation A, Example 3: Violation B, Examples l, 2, and 7)
of Unit 2 area walkdowns will be completed by restart.Current levels of maintenance
V!~}}
and modification
activities
in the plant make it inappropriate
to perform the area walkdowns by December 3, 1990.  
U.S.Nuclear Regulatory
Commission
OEC 03 1gPP The enclosure to this letter provides the revised commitment
date., If you have any questions, please call Patrick P.Carier at (205)729-3566.Very truly yours, TENNESSEE VALLEY AUTHORITY.'ark 0.Medford Enclosures
cc (Enclosures):
Ms.S.C.Black, Deputy Director Project Directorate
11-4 U.S.Nuclear Regulatory
Commission
One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000
Mr.Thierry M.Ross, Project Manager U.S.Nuclear Regulatory
Commission
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 iMr.B.A.Wilson, Project Chief U.S.Nuclea Regulatory
Commission
Region II 101 iMarietta Street, NW, Suite 2900 Atlanta, Georgia 30323  
ENCLOSURE SUi&IARY OF COI'NITMENTS
Area walkdowns will be completed for Unit 2 by restart: (Violation
A, Example 3: Violation B, Examples l, 2, and 7)  
V!~
}}

Revision as of 02:18, 17 August 2019

Revises Response to Violations Noted in Insp Repts 50-259/89-16,50-260/89-16 & 50-296/89-16 Re Area Walkdowns
ML18033B568
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 12/03/1990
From: Medford M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9012070138
Download: ML18033B568 (8)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM

SUBJECT:

Revises response to violations noted in Insp Repts 50-259/89-16,50-260/89-16

&50-296/89-16 re area walkdowns; DISTRIBUTION CODE: IE01D COPXES RECEIVED:LTR ENCL~SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:1 Copy each to: B.Wilson,S.

BLACK 1 Copy each to: S.Black,B.WILSON 1 Copy each to: S.Black,B.WILSON D/05000259 05000260 05000296 D REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ESSION NBR:9012070138 DOC.DATE: 90/12/03 NOTARIZED:

NO DOCKET ACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 95000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH;NAME AUTHOR AFFILIATION MEDFORD,M.O.

Tennessee Valley Authority RECIP.NAME RECXPIENT AFFILIATION Document Control Branch (Document Control Desk)RECIPIENT ID CODE/NAME HEBDON,F ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA/OEAB

'RR/DRIS/DIR NRR/PMAS/ILRB12 OE DIR IL 02 EXTERNAL EG&G/BRY CE I J~H~NSIC NOTES COPIES LTTR ENCL 2 1 1 1 1'1 1'RECIPIENT ID CODE/NAME ROSS,T.AEOD AEOD/TPAB NRR MOR I S S EAU I D NRR/DLPQ/LPEB10 NRR/DRE P/PEPB9 D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE O'ASTE!CONTACT THE DOCUMENT CONTROL DESK, t ROOXI Pl-."'7 (EYT.2II79)TO ELli~llNATE YOUR NAiXIE FROivl DISTRIBUTION I.ISTS FOR DOCUP,IENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL D D

'\

Tenn mrs'ee Va!,'ey Aurncn'.y)10>Ma<<e'.S!ice;Chai:ancoga, Tennessee 37402 fuIark O.Medforo vice presidenrNucrea Assurance t ce s"y ana Fels DEC 09 1990 U.S.Nuclear Regulatory Commission ATTN: 'ocument Control Desk Washington, D.CD 20555 Gentlemen:

In the Hatter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296.BROWNS FERRY NUCLEAR PLANT,(BFN)

-UNITS 1, 2 AND 3-NRC INSPECTION REPORT NOS.50-259/89-16, 50-260/89-16, 50-296/89-16

-REVISION To NOTICE OF VIOLATION RESPONSE

References:

1.Letter from H.0.Hedford to NRC dated April 9, 1990,"Browns Ferry Nuclear Plant (BFN)-Units 1, 2 and 3, NRC Inspection Report Nos.50-259/89-16, 50-260/89-16, and 50-296/89-16

-Response to Notice of Violation" 2.Letter from M.0.Medford to NRC dated August 14, 1990,"Browns Ferry Nuclear Plant (BFN)-Units 1, 2 and 3-NRC:.nspection Report Nos.50-259/89-16, 50-260/89-16, 50-296/89-16

-Revision to Notice of Violation Response" TVA committed in Reference 2 to complete area walkdowns by December 3, 1990.This commitment date was based on a scheduled Unit 2 restart date of December 5, 1990, and the need to conduct the walkdowns after completion of all modification and maintenance activities.

This letter is provided to extend the completion date for this item.The performance of Unit 2 area walkdowns will be completed by restart.Current levels of maintenance and modification activities in the plant make it inappropriate to perform the area walkdowns by December 3, 1990.

U.S.Nuclear Regulatory Commission OEC 03 1gPP The enclosure to this letter provides the revised commitment date., If you have any questions, please call Patrick P.Carier at (205)729-3566.Very truly yours, TENNESSEE VALLEY AUTHORITY.'ark 0.Medford Enclosures cc (Enclosures):

Ms.S.C.Black, Deputy Director Project Directorate 11-4 U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Mr.Thierry M.Ross, Project Manager U.S.Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 iMr.B.A.Wilson, Project Chief U.S.Nuclea Regulatory Commission Region II 101 iMarietta Street, NW, Suite 2900 Atlanta, Georgia 30323

ENCLOSURE SUi&IARY OF COI'NITMENTS Area walkdowns will be completed for Unit 2 by restart: (Violation A, Example 3: Violation B, Examples l, 2, and 7)

V!~