{{#Wiki_filter:August 28, 2017
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 28, 2017 Mr. Darin Site Vice President Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 SUBJECT: UPDATED INSPECTION PLAN FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 - NRC REPORT 05000424/2017005 AND 05000425/2017005
 
==SUBJECT:==
UPDATED INSPECTION PLAN FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 - NRC REPORT 05000424/2017005 AND 05000425/2017005


==Dear Mr. Myers:==
==Dear Mr. Myers:==

Revision as of 09:06, 13 July 2019

Updated Inspection Plan NRC Inspection Report 05000424/2017005 and 05000425/2017005
ML17240A082
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/28/2017
From: Shane Sandal
NRC/RGN-II/DRP/RPB2
To: Myers D
Southern Nuclear Operating Co
References
IR 2017005
Download: ML17240A082 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 28, 2017 Mr. Darin Site Vice President Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830 SUBJECT: UPDATED INSPECTION PLAN FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2 - NRC REPORT 05000424/2017005 AND 05000425/2017005

Dear Mr. Myers:

The enclosed inspection plan lists the inspections scheduled through June 30 , 201 9 for Vogtle Electric Generating Plant, Units 1 and 2

. The NRC provides the inspection plan to allow for th e resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

Also , on August 28, 2017 , the NRC began the Supplemental Inspection (IP 95001) for a White finding associated with the failure to maintain a standard emergency classification scheme

. Specifically, the emergency classifications RG1 & RS1 contained effluent radiation monitor threshold values significantly different than appropriate.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC

's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (404) 997-4513 with any questions you have regarding this letter.

Sincerely,

/RA/

Shane R. Sandal, Chief Reactor Projects Branch 2 Division of Reactor Projects

Docket Nos.:

50-424, 50-425 License Nos.:

NPF-68 and NPF-81 Enclosure:

Vogtle Inspection/Activity Plan 0 8/01/2017-06/30/2019 Distribution via Listserv SUBJECT: UPDATED INSPECTION PLAN FOR VOGTLE ELECTRIC GENERATING PLANT UNITS 1 AND 2

- NRC REPORT 05000424/2017005 AND 05000425/2017005 August 28, 2017 DISTRIBUTION:

M. Kowal, RII K. Sloan, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMVogtleResource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

ADAMS Accession Number: ML OFFICE RII:DRP RII:DRP NAME DMas SSandal DATE 8/23/2017 8/25/2017 OFFICIAL AGENCY RECORD

Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteVogtleInspection / Activity Plan 08/01/2017-06/30/2019 Page 1 of 2 08/23/2017 10:31:50 95001-VOGTLE 95001 INSPECTION 4 1, 2 IP Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area 95001 08/28/2017 09/01/2017 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 09/25/2017 09/29/2017 RP-RP PUBLIC INSPECTION 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/25/2017 09/29/2017 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 09/25/2017 09/29/2017OL EXAM-INITIAL LICENSE EXAM 4 1 VOGTLE/UNIT 1 APRIL 2017 INITIAL EXAM AT POWER FACILITIES V23491 10/06/2017 10/17/2017 EQI-DESIGN BASES ASSURANCE INSPECTION (PROGR 4 1, 2 IP Design Bases Assurance Inspection (Programs)7111121N11/06/201711/10/2017 1, 2 IP Design Bases Assurance Inspection (Programs)7111121N11/27/2017 12/01/2017 1, 2 IP Design Bases Assurance Inspection (Programs)7111121N12/11/2017 12/15/2017TI-191-MITIGATING STRATEGIES 4 1, 2 IP Inspection of Licensee's Responses to Order EA-12-049, EA-12-051 & EP Info Request March 12, 2012 2515/19111/13/201711/17/2017 RP-RP PUBLIC INSPECTION 2 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 12/04/2017 12/08/2017 1, 2 IP Radiological Environmental Monitoring Program71124.07 12/04/2017 12/08/2017 1, 2 IP Performance Indicator Verification71151 12/04/2017 12/08/2017 EP-EP EXERCISE 6 1, 2 IP Exercise Evaluation7111401 05/14/2018 05/18/2018 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/14/2018 05/18/2018 1, 2 IP Exercise Evaluation - Scenario Review7111408 05/14/2018 05/18/2018 1, 2 IP ERO Readiness71151-EP02 05/14/2018 05/18/2018 MODS-PLANT MODIFICATIONS INSPECTION 3 1, 2 IP Evaluations of Changes, Tests, and Experiments7111117T 08/27/2018 08/31/2018 ISI-UNIT 1 IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 1 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 09/24/2018 09/28/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 09/24/2018 09/28/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 09/24/2018 09/28/2018 1, 2 IP Occupational Dose Assessment71124.04 09/24/2018 09/28/2018 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.

Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on SiteVogtleInspection / Activity Plan 08/01/2017-06/30/2019 Page 2 of 2 08/23/2017 10:31:50 RP-RP OCCUPATIONAL - WEEK 1 2 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 09/24/2018 09/28/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 09/24/2018 09/28/2018 SGISI-UNIT 1 SG IN-SERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 09/24/2018 09/28/2018 RP-RP OCCUPATIONAL - WEEK 2 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 10/15/2018 10/19/2018 1, 2 IP Occupational ALARA Planning and Controls71124.02 10/15/2018 10/19/2018 1, 2 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 10/15/2018 10/19/2018 1, 2 IP Occupational Dose Assessment71124.04 10/15/2018 10/19/2018 1, 2 IP Occupational Exposure Control Effectiveness71151-OR01 10/15/2018 10/19/2018 1, 2 IP RETS/ODCM Radiological Effluent Occurrences71151-PR01 10/15/2018 10/19/2018OL EXAM-INITIAL LICENSE EXAM PREP 3 1 VOGTLE U1/ DECEMBER 2018 INITIAL EXAM AT POWER FACILITIES V23520 10/29/201811/02/2018OL EXAM-INITIAL LICENSE EXAM 3 1 VOGTLE U1/ DECEMBER 2018 INITIAL EXAM AT POWER FACILITIES V2352011/26/2018 12/14/2018 RP-RP INSTRUMENTS 1 1, 2 IP Radiation Monitoring Instrumentation71124.05 12/03/2018 12/07/2018 ISI-UNIT 2 IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/18/2019 03/22/2019 RP-RP RADHAZARDS 1 1, 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/18/2019 03/22/2019 SGISI-UNIT 2 SG IN-SERVICE INSPECTION 1 2 IP Inservice Inspection Activities - PWR7111108P 03/18/2019 03/22/2019 PI&R-PROBLEM IDENTIFICATION AND RESOLUTION 5 1, 2 IP Problem Identification and Resolution71152B 04/22/2019 04/26/2019 1, 2 IP Problem Identification and Resolution71152B 05/06/2019 05/10/2019 EP-EP PROGRAM INSPECTION 3 1, 2 IP A lert and Notification System Testing7111402 05/06/2019 05/10/2019 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 05/06/2019 05/10/2019 1, 2 IP Emergency Action Level and Emergency Plan Changes7111404 05/06/2019 05/10/2019 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 05/06/2019 05/10/2019 1, 2 IP Performance Indicator Verification71151 05/06/2019 05/10/2019 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.