UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
May 19, 2017
Mr. B. Keith Taber
Vice President
Southern Nuclear Operating Company, Inc.
Vogtle Electric Generating Plant
7821 River Road
Waynesboro, GA 30830
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC
GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND
Dear Mr. Taber:
In a telephone conversation on May 4, 2017, Mr. David Lanyi, Senior Operations Engineeer and
Mr. Ken Jenkins, Initial Exam Lead made arrangements for the NRC to inspect the licensed
operator requalification program at Vogtle Electric Generating Plant Units 1 and 2. The
inspection is planned for the week of June 26, 2017, which coincides with your regularly
scheduled requalification examination cycle. The staff at your facility should prepare and
conduct the requalification examinations in accordance with your NRC-approved requalification
program. It is our understanding that you have committed to maintain your plant-referenced
simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear
Power Plant Simulators for Use in Operator Training and Examination.
In accordance with 10 CFR 55.59, the NRC has requested that you submit June 2, 2017, the
material as specified in paragraph A of the Enclosure, in order to support the NRC's inspection
program needs. The NRC has further requested that you have all items as specified in
paragraph B of the Enclosure available for review for the inspectors on the first day they arrive
on site. Mr. Jenkins has been advised of this request and provided with the name and address
of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget, approval number Part 55 (3150-0018).
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per
response, including the time for reviewing instructions, gathering and maintaining the data
needed, and completing and reviewing the collection of information. Send comments on any
aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0101), Office of Management and Budget, Washington, DC 20503.
B. Taber
2
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
of information unless it displays a currently valid OMB approval number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRCs document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html. (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this
inspection please contact Mr. Lanyi at (404) 997-4487, (Internet E-mail: david.lanyi@nrc.gov),
or me at (404) 997-4551, (Internet E-mail: Gerald.mccoy@nrc.gov).
Sincerely,
/RA/
Gerald J. McCoy, Chief
Operations Branch 1
Division of Reactor Safety
Docket Nos.: 50-424, 50-425
Enclosure: Materials Request List
cc: Distribution via Listserv
B. Taber
3
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC
GENERATING PLANT UNITS 1 AND 2 05000424/2017002 AND
05000425/2017002 DATED : MAY 19, 2017
DISTRIBUTION:
S. Sandal, RII, DRP
C. Kontz, RII, SPE
D. Mas-Peneranda, PE
A. Patz, RII DRP
M. Endress, RII SRI
A. Alen, RII, RI
S. Price, ORA/RC
K. Sloan, RII, EICS
PUBLICLY AVAILABLE
NON-PUBLICLY AVAILABLE
SENSITIVE
NON-
SENSITIVE
ADAMS:
Yes
ACCESSION NUMBER:_______
SUNSI REVIEW COMPLETE
FORM 665 ATTACHED
OFFICE
RII/ OB1
RII/ OB1
SIGNATURE
DRL
GXM
NAME
D. Lanyi
G. McCoy
DATE
5/19/2017
5/19/2017
5/ /2017
5/ /2017
5/ /2017
5/ /2017
E-MAIL COPY?
YES
NO YES
NO
YES
NO
YES
NO YES
NO
YES
NO
OFFICIAL
RECORD
COPY DOCUMENT
NAME:
G:\\DRSII\\OBII\\SITES\\VOGTLE\\REQUAL
INSPECTIONS\\VOGTLE 2017\\REQUAL LETTER.DOCX
Enclosure
Materials Request List
The items listed below are necessary to support the Licensed Operator Requalification Program
inspection (IP-71111.11) in June 2017 at Vogtle Electric Generating Plants Units 1 & 2. Items
listed under In-office inspection material must be received in the NRC Region II office by the
due dates specified below. Items listed under On-site inspection material should be ready for
review upon arrival of the inspectors on June 26, 2017.
A.
In-office inspection material:
1. List of all licensed individuals (active and inactive; RO and SRO) including license
restrictions (June 2, 2017)
2. Organizational Chart for the training department, including the simulator fidelity staff,
with phone number/email contact information (June 2, 2017)
3. Weekly examination schedules for the weeks that the 2017 annual operating exams will
be administered, including a list of personnel scheduled for testing the week of June 26.
2017 (June 2, 2017)
4. All 2016 biennial written examinations, final answer keys, re-take examinations, and
spreadsheets or outlines that show the usage of written examination questions on the
different versions of these written examinations (June 2, 2017)
5. Site procedure(s) governing the conduct (process and content) of license operator
requalification training (classroom and simulator), examination
development/administration, remedial training, and examination security (June 2, 2017)
6. Site procedure(s) governing simulator configuration control, maintenance, and fidelity
testing methods used to fulfill ANSI/ANS 3.5-1985 requirements (June 2, 2017)
7. All JPMs, including spreadsheets or outlines that show the usage of the JPMs in all of
the 2017 Segment 3 annual exam weeks (June 2, 2017, EXAM SECURITY RELATED)
8. All simulator scenarios that will be administered in the 2017 Segment 3 annual exam
weeks, including which scenarios are assigned to a specific week (June 2, 2017, EXAM
SECURITY RELATED)
9. Self-assessment reports, condition reports, and/or Licensee Event Reports, written since
August 2015 (last biennial requalification inspection), which document operator errors or
performance problems that occurred in the actual plant/main control room, including the
corrective actions (June 2, 2017]
B.
On-site inspection material (due June 26, 2017):
1. Requalification training attendance records for the current two year biennial training
cycle
2. Examination results since last requalification inspection (weekly operating & written
examinations); copies of examinations with pass/failure rates outside the average
3. Copies of the simulator scenarios for the inspectors to observe the operating crews and
evaluators
4. All remedial training documentation for any licensed operator that failed an examination
since the last requalification inspection, (i.e., since August 2015)
5. List of all operators that reactivated their licenses since the last requalification
inspection, (i.e., since August 2015)
6. Records that support verification of time on shift under instruction and complete plant
tours for both the reactivating operator and the supervising active license, including
a. Documentation of time on shift under instruction
b. Security system and HP/dosimetry records for plant areas toured by reactivating
individual and accompanying licensed operator
2
7. Records providing documentation of maintenance of active license status (time on shift)
for all licensed operators since last requalification inspection, (i.e., since August 2015)
8. Medical records for all licensed (active and inactive) operators
9. Simulator maintenance and testing records, including
a. List of all open simulator discrepancies
b. List of all simulator discrepancies closed within the past 12 months
c. List of simulator performance tests
d. Simulator performance testing records and associated documentation