IR 05000424/2017410
| ML18019A741 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/19/2018 |
| From: | Binoy Desai Division of Reactor Safety II |
| To: | Mcgavin S Southern Nuclear Operating Co |
| References | |
| IR 2017410 | |
| Download: ML18019A741 (6) | |
Text
January 19, 2018
SUBJECT:
REISSUE - VOGTLE ELECTRIC GENERATING PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000424/2017410 AND 05000425/2017410
Dear Mr. McGavin:
January 4, 2018
SUBJECT:
REISSUE - VOGTLE ELECTRIC GENERATING PLANT - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT 05000424/2017410 AND 05000425/2017410
Dear Mr. McGavin:
On November 30, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Vogtle Electric Generating Plant, Units 1 and 2, and discussed the results of this inspection with Mr. D. Komm and other members of the licensees staff. The results of this inspection are documented in the enclosed report.
The NRC inspector did not identify any findings or violations of more than minor significance.
This letter will be made available for public inspection and copying at https://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in Enclosure 1 accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Binoy Desai, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81
Enclosure:
Inspection Report 05000424/2017410, and 05000425/2017410 w/Attachment:
Supplemental Info (OUO)
cc: (See page 3) cc :
Michael P. Long, Fleet Nuclear Security Operations Manager Southern Nuclear Operating Co., Inc.
40 Inverness Center Parkway (Bin B042)
Birmingham, AL 35242
Steven M. Shipman Fleet Security Project Manager Southern Nuclear Operating Co., Inc.
40 Inverness Center Parkway (BIN B042)
Birmingham, AL 35201-1295
Lisa B. Hogg Fleet Security Project Manager Southern Nuclear Operating Co. Inc.
40 Inverness Center Parkway (BIN B042)
Birmingham, AL 35242
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS/PSB RII:DRS/PSB RII:DRP
SIGNATURE JHW2 BBD AJB3
NAME J. Wallo B. Desai A. Blamey
DATE 1/ 4 /2018 1/ 4 /2018 1/ 4 /2018
E-MAIL COPY YES NO YES NO YES NO