|
|
Line 3: |
Line 3: |
| | issue date = 06/19/2007 | | | issue date = 06/19/2007 |
| | title = IR 05000219-07-404, on 05/23/2007; Oyster Creek Generating Station; Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC) | | | title = IR 05000219-07-404, on 05/23/2007; Oyster Creek Generating Station; Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC) |
| | author name = Lorson R K | | | author name = Lorson R |
| | author affiliation = NRC/RGN-I/DNMS/DB | | | author affiliation = NRC/RGN-I/DNMS/DB |
| | addressee name = Crane C M | | | addressee name = Crane C |
| | addressee affiliation = AmerGen Energy Co, LLC | | | addressee affiliation = AmerGen Energy Co, LLC |
| | docket = 05000219 | | | docket = 05000219 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 June 19, 2007Mr. Christopher M. CranePresident and CNO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 June 19, 2007Mr. Christopher M. CranePresident and CNO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348SUBJECT:OYSTER CREEK GENERATING STATION - NRC INSPECTION REPORT 05000219/2007404 |
| | |
| SUBJECT: OYSTER CREEK GENERATING STATION - NRC INSPECTION REPORT 05000219/2007404
| |
|
| |
|
| ==Dear Mr. Crane:== | | ==Dear Mr. Crane:== |
| On May 23, 2007, the United States Nuclear Regulatory Commission completed an inspectionat your Oyster Creek Generating Station. The enclosed inspection report documents the inspection results which were discussed on May 23, 2007, with Mr. A. Farenga of your staff.This inspection examined activities conducted under your license as they relate to safety,common defense and security, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was based upon Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC). The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection, no violations were identified. No reply to this letter isrequired. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | On May 23, 2007, the United States Nuclear Regulatory Commission completed an inspectionat your Oyster Creek Generating Station. The enclosed inspection report documents the inspection results which were discussed on May 23, 2007, with Mr. A. Farenga of your staff.This inspection examined activities conducted under your license as they relate to safety,common defense and security, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was based upon Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC). The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection, no violations were identified. No reply to this letter isrequired. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| Sincerely,/RA/Raymond Lorson, ChiefDecommissioning Branch Division of Nuclear Materials SafetyDocket No.05000219 License Nos.DPR-16 | | Sincerely, |
| | /RA/Raymond Lorson, ChiefDecommissioning Branch Division of Nuclear Materials SafetyDocket No.05000219 License Nos.DPR-16 |
|
| |
|
| ===Enclosure:=== | | ===Enclosure:=== |
| Inspection Report 05000219/2007404 | | Inspection Report 05000219/2007404w/Attachment: Supplemental Information |
|
| |
|
| ===w/Attachment:===
| | ML071720072DOCUMENT NAME: G:\D&LB\RAMQC Non-Safeguards Inspection Reports\Oyster Creek Inspection Report TI 2201-001.wpdAfter declaring this document "An Official Agency Record" it will/be released to the Public.To receive a copy of this document, indicate in the box: |
| Supplemental Information
| | " C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copyOFFICEDNMS/RIEDNMS/RIDNMS/RINAMELKauffman/lapSChaudhary/skcRLorson/rklDATE06/12/0706/12/0706/19/07 C. M. Crane2 |
|
| |
|
| ML071720072DOCUMENT NAME: G:\D&LB\RAMQC Non-Safeguards Inspection Reports\Oyster Creek Inspection Report TI 2201-001.wpdAfter declaring this document "An Official Agency Record" it will/be released to the Public.To receive a copy of this document, indicate in the box:
| | REGION IDocket No:50-219 License No:DPR-16 Report No:05000219/2007404 Licensee:AmerGen Energy Company, LLC (AmerGen) |
| " C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copyOFFICEDNMS/RIEDNMS/RIDNMS/RINAMELKauffman/lapSChaudhary/skcRLorson/rklDATE06/12/0706/12/0706/19/07 C. M. Crane2cc w/encl:Chief Operating Officer, AmerGen Site Vice President, Oyster Creek Nuclear Generating Station, AmerGen Plant Manager, Oyster Creek Generating Station, AmerGen Regulatory Assurance Manager, Oyster Creek, AmerGen Senior Vice President - Nuclear Services, AmerGen Vice President - Mid-Atlantic Operations, AmerGen Vice President - Operations Support, AmerGen Vice President - Licensing and Regulatory Affairs, AmerGen Director Licensing, AmerGen Manager Licensing - Oyster Creek, AmerGen Vice President, General Counsel and Secretary, AmerGen T. O'Neill, Associate General Counsel, Exelon Generation Company J. Fewell, Assistant General Counsel, Exelon Nuclear Correspondence Control Desk, AmerGen J. Matthews, Esquire, Morgan, Lewis & Bockius LLP Mayor of Lacey Township K. Tosch, Chief, NJ Bureau of Nuclear Engineering, Dept of Environmental Protection R. Shadis, New England Coalition Staff N. Cohen, Coordinator - Unplug Salem Campaign E. Gbur, Chairwoman - Jersey Shore Nuclear Watch E. Zobian, Coordinator - Jersey Shore Anti Nuclear Alliance P. Baldauf, Assistant Director, NJ Radiation Protection Programs C. M. Crane3Distribution w/encl:(via E-mail)S. Collins, RAM. Dapas, DRA B. Holian, RI M. Thaggard, RI L. Kauffman, RI R. Lorson, RI R. Bellamy, DRP S. Barber, DRP M. Ferdas, DRP, Senior Resident Inspector R. Treadway, DRP, Resident Inspector J. DeVries, DRP, Resident OA J. Lamb, RI OEDO H. Chernoff, NRR J. Lubinski, NRR E. Miller, PM, NRR J. Hughey, NRR, Backup B. Westrich, NSIR G. Purdy, NSIR M. Gray, DRP C. Khan, DRP Region I Docket Room (with concurrences)ROPreports@nrc.gov EnclosureU.S. NUCLEAR REGULATORY COMMISSIONREGION IDocket No:50-219 License No:DPR-16 Report No:05000219/2007404 Licensee:AmerGen Energy Company, LLC (AmerGen)
| |
| Facility:Oyster Creek Generating Station Location:Forked River, NJ 08731 Date:May 23, 2007 Inspectors:L. Kauffman, Health PhysicistS. Chaudhary, Reactor EngineerApproved by:Raymond Lorson, ChiefDecommissioning Branch Division of Nuclear Materials Safety Enclosure | | Facility:Oyster Creek Generating Station Location:Forked River, NJ 08731 Date:May 23, 2007 Inspectors:L. Kauffman, Health PhysicistS. Chaudhary, Reactor EngineerApproved by:Raymond Lorson, ChiefDecommissioning Branch Division of Nuclear Materials Safety Enclosure |
|
| |
|
|
---|
Category:Inspection Report
MONTHYEARIR 07200015/20244012024-10-30030 October 2024 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200015/2024401 IR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23214A2472023-08-22022 August 2023 – NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 – NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 – NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 IR 05000219/20210042022-01-26026 January 2022 NRC Inspection Report No. 05000219/2021004 IR 05000219/20214022022-01-26026 January 2022 EA-21-041: Confirmatory Order Related to Oyster Greek Nuclear Generating Station - NRC Investigation Report I-2020-007; NRC Inspection Report Nos. 05000219/2021402 & 07200015/2021401 IR 05000219/20214032021-12-21021 December 2021 EA-21-093 Notice of Violation and Proposed Imposition of Civil Penalty - $150,000, Inspection Report No. 05000219/2021403 IR 05000219/20210032021-11-16016 November 2021 NRC Inspection Report No. 05000219/2021003 IR 05000219/20214042021-08-26026 August 2021 NRC Independent Spent Fuel Storage Security Inspection Report No. 07200015/2021402 and Security Decommissioning Inspection Report 05000219/2021404 - (Public) ML21202A2312021-07-28028 July 2021 Discretionary Security Decommissioning Inspection Report No. 05000219/2021403 - Public Version IR 05000219/20210022021-07-27027 July 2021 NRC Inspection Report No. 05000219/2021002 and Independent Spent Fuel Storage Installation Report 07200015/2021002 IR 05000219/20210012021-05-18018 May 2021 NRC Inspection Report No. 05000219/2021001 and Independent Spent Fuel Storage Installation Report 07200015/2021001, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station IR 05000219/20204022020-12-14014 December 2020 Security Decommissioning Inspection Report 05000219/2020402 (Public - No Findings) IR 05000219/20200032020-10-21021 October 2020 NRC Inspection Report No. 05000219/2020003, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20204012020-07-27027 July 2020 Security Baseline Inspection Report 05000219/2020401 IR 05000219/20200022020-07-20020 July 2020 NRC Inspection Report No. 05000219/2020002, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20200012020-04-20020 April 2020 Forked River, New Jersey, NRC Inspection Report 05000219/2020001 IR 05000219/20190042020-01-0606 January 2020 NRC Inspection Report 05000219/2019004, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20190032019-10-28028 October 2019 NRC Inspection Report No. 05000219/2019003, Holtec Decommissioning International, LLC, Oyster Creek Nuclear Generating Station, Forked River, New Jersey IR 05000219/20190022019-07-24024 July 2019 NRC Inspection Report 05000219/2019002 IR 05000219/20190012019-04-15015 April 2019 NRC Inspection Report No. 05000219/2019001, Oyster Creek Nuclear Generating Station IR 05000219/20194012019-03-25025 March 2019 NRC Inspection Report No. 05000219/2019401 (Public) IR 05000219/20180122019-02-19019 February 2019 NRC Inspection Report No. 05000219/2018012, Oyster Creek Nuclear Generating Station IR 05000219/20180032018-11-0808 November 2018 Integrated Inspection Report 05000219/2018003 IR 05000219/20180022018-08-0202 August 2018 Integrated Inspection Report 05000219/2018002 and Independent Spent Fuel Storage Installation Report 0700015/2018001 IR 05000219/20184102018-06-18018 June 2018 Security Inspection Report 05000219-2018410 (Cover Letter) IR 05000219/20180012018-05-0808 May 2018 Integrated Inspection Report 05000219-2018001 and Exercise of Enforcement Discretion IR 05000219/20180102018-02-28028 February 2018 Design Bases Assurance Inspection (Programs) Report 05000219/2018010 IR 05000219/20170062018-02-28028 February 2018 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Reports 05000219/2017006 05000219/2017402 and 05000219/2017501) IR 05000219/20170042018-01-24024 January 2018 NRC Integrated Inspection Report 05000219/2017004 IR 05000219/20170092017-11-30030 November 2017 Temporary Instruction 2515-191 Inspection Report 05000219/2017009 IR 05000219/20174052017-10-25025 October 2017 Problem Identification and Resolution Sample Security Inspection Report 05000219/2017405 (Cover Letter) IR 05000219/20170032017-10-17017 October 2017 Integrated Inspection Report 05000219/2017003 IR 05000219/20170082017-10-17017 October 2017 Supplemental Inspection Report 05000219/2017008 and Assessment Follow-Up Letter IR 05000219/20175022017-10-16016 October 2017 Evaluated Emergency Preparedness Exercise Inspection Report 05000219-2017502 IR 05000219/20170052017-08-28028 August 2017 Updated Inspection Plan Report 05000219 2017005 with Report 22 IR 05000219/20174042017-08-15015 August 2017 Problem Identification and Resolution Cyber Security Inspection Report 05000219/2017404 (Cover Letter) IR 05000219/20170022017-08-0303 August 2017 Integrated Inspection Report 05000219/2017002 IR 05000219/20174032017-05-0909 May 2017 Security Inspection Report 05000219-2017403 (Cover Letter) IR 05000219/20170012017-05-0808 May 2017 Integrated Inspection Report 05000219/2017001 IR 05000219/20170072017-05-0101 May 2017 IR 05000219/20160042017-04-13013 April 2017 Final Significance Determination for a White Finding with Assessment Follow-up and Notice of Violation - Inspection Report 05000219/2016004 IR 05000219/20160062017-03-0101 March 2017 Annual Assessment Letter for Oyster Creek Nuclear Generating Station (Report 05000219/2016006) with Report 22 2024-09-05
[Table view] Category:Letter
MONTHYEARIR 07200015/20244012024-10-30030 October 2024 NRC Independent Spent Fuel Storage Installation Security Inspection Report No. 07200015/2024401 ML24303A2822024-10-29029 October 2024 License Termination Plan Supplemental Submittal for Technical Bases Documents ML24284A1972024-10-10010 October 2024 Cover Letter Oyster Creek, License Termination Plan Acceptance Review ML24269A0462024-10-0404 October 2024 Cover Letter for Oyster Creek Nuclear Generating Station, License Amendment Request, License Termination Plan, Acceptance Review Request for Additional Information ML24274A0822024-09-25025 September 2024 Independent Spent Fuel Storage Installation Security Plan, Training Qualification Plan, Safeguards Contingency Plan, Revisions 1 and 2 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000219/20240022024-09-0505 September 2024 – NRC Inspection Report 05000219/2024002 and 07200015/2024001 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24214A0372024-08-0101 August 2024 License Amendment Request to Revise Renewed Facility Operating License to Add License Condition 2.C.(18) to Include License Termination Plan Requirements ML24179A1842024-07-23023 July 2024 June 20, 2024, Clarification Call on Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000219/20240012024-05-14014 May 2024 Decommissioning Intl, LLC Oyster Creek Nuclear Generating Station - NRC Inspection Report No. 05000219/2024001 ML24120A0412024-04-29029 April 2024 Annual Radioactive Environmental Operating Report for 2023 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24120A0402024-04-29029 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24094A2142024-04-19019 April 2024 Preapplication Readiness Assessment of the Holtec Decommissioning International License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24089A2492024-03-29029 March 2024 Reply to Notice of Violation EA-2024-024 ML24085A7902024-03-28028 March 2024 – Preapplication Readiness Assessment of the License Termination Plan ML24081A2882024-03-21021 March 2024 Request Preliminary Review and Feedback on Chapter 6 of the Draft License Termination Plan ML24046A1242024-02-29029 February 2024 – NRC Inspection Report 05000219/2023003 ML24033A3272024-02-0202 February 2024 Request Preliminary Review and Feedback on Chapter 5 of the Draft License Termination Plan ML23342A1162024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 IR 05000219/20230022023-11-0909 November 2023 EA-23-076 Oyster Creek Nuclear Generating Station - Notice of Violation and Proposed Imposition of Civil Penalty - $43,750 - NRC Inspection Report No. 05000219/2023002 ML23286A1552023-10-13013 October 2023 Defueled Safety Analysis Report (DSAR) ML23249A1212023-09-0606 September 2023 – NRC Inspection Report 05000219/2023002, Apparent Violation (EA-23-076) ML23242A1162023-08-30030 August 2023 Biennial 10 CFR 50.59 and 10 CFR 72.48 Change Summary Report – January 1, 2021 Through December 31, 2022 ML23214A2472023-08-22022 August 2023 – NRC Inspection Report 05000219/2023002 IR 05000219/20230012023-05-31031 May 2023 – NRC Inspection Report No. 05000219/2023001 IR 07200015/20234012023-05-16016 May 2023 – NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2023401 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 ML23114A0872023-04-24024 April 2023 Annual Radioactive Environmental Operating Report for 2022 ML23114A0912023-04-24024 April 2023 Annual Radioactive Effluent Release Report for 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000219/20220022023-02-0909 February 2023 NRC Inspection Report No. 05000219/2022002 ML23031A3012023-02-0808 February 2023 Discontinuation of Radiological Effluent Monitoring Location in the Sewerage System ML23033A5052023-02-0202 February 2023 First Use Notification of NRC Approved Cask RT-100 ML23025A0112023-01-24024 January 2023 LLRW Late Shipment Investigation Report Per 10 CFR 20, Appendix G ML22347A2732022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML22297A1432022-12-15015 December 2022 Part 20 App G Exemption Letter L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 IR 07200015/20224012022-12-0606 December 2022 NRC Independent Spent Fuel Storage Installation Security Inspection Report 07200015/2022401 (Letter & Enclosure 1) ML22280A0762022-11-0202 November 2022 Us NRC Analysis of Holtec Decommissioning Internationals Funding Status Report for Oyster Creek, Indian Point and Pilgrim Nuclear Power Station ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22286A1402022-10-13013 October 2022 NRC Confirmatory Order EA-21-041 IR 05000219/20220012022-08-11011 August 2022 NRC Inspection Report 05000219/2022001 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I475 ALLENDALE ROADKING OF PRUSSIA, PENNSYLVANIA 19406-1415 June 19, 2007Mr. Christopher M. CranePresident and CNO AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348SUBJECT:OYSTER CREEK GENERATING STATION - NRC INSPECTION REPORT 05000219/2007404
Dear Mr. Crane:
On May 23, 2007, the United States Nuclear Regulatory Commission completed an inspectionat your Oyster Creek Generating Station. The enclosed inspection report documents the inspection results which were discussed on May 23, 2007, with Mr. A. Farenga of your staff.This inspection examined activities conducted under your license as they relate to safety,common defense and security, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was based upon Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC). The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.Based on the results of this inspection, no violations were identified. No reply to this letter isrequired. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, itsenclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/Raymond Lorson, ChiefDecommissioning Branch Division of Nuclear Materials SafetyDocket No.05000219 License Nos.DPR-16
Enclosure:
Inspection Report 05000219/2007404w/Attachment: Supplemental Information
ML071720072DOCUMENT NAME: G:\D&LB\RAMQC Non-Safeguards Inspection Reports\Oyster Creek Inspection Report TI 2201-001.wpdAfter declaring this document "An Official Agency Record" it will/be released to the Public.To receive a copy of this document, indicate in the box:
" C" = Copy without attachment/enclosure " E" = Copy with attachment/enclosure " N" = No copyOFFICEDNMS/RIEDNMS/RIDNMS/RINAMELKauffman/lapSChaudhary/skcRLorson/rklDATE06/12/0706/12/0706/19/07 C. M. Crane2
REGION IDocket No:50-219 License No:DPR-16 Report No:05000219/2007404 Licensee:AmerGen Energy Company, LLC (AmerGen)
Facility:Oyster Creek Generating Station Location:Forked River, NJ 08731 Date:May 23, 2007 Inspectors:L. Kauffman, Health PhysicistS. Chaudhary, Reactor EngineerApproved by:Raymond Lorson, ChiefDecommissioning Branch Division of Nuclear Materials Safety Enclosure
SUMMARY OF FINDINGS
IR 05000219/2007404; 05/23/2007; Oyster Creek Generating Station; Inspection of AdditionalSecurity Measures for Radioactive Material Quantities of Concern (RAMQC)The report covered an announced one-day inspection related to safety, common defense andsecurity, and compliance with NRC Orders related to the transportation of radioactive material and the handling of safeguards information. The inspection was conducted by two regional inspectors and was based upon Temporary Instruction (TI) 2201/001, "Inspection of Additional Security Measures for Radioactive Material Quantities of Concern (RAMQC)." The inspectors determined that the licensee had developed an adequate program for the transportation of radioactive material and the handling of safeguards information.A.
NRC Identified and Self-Revealing Findings
Cornerstone: Physical Security
None.
B.Licensee-Identified Violations
None.
Enclosure
REPORT DETAILS
4OA5Other Activities.1Temporary Instruction (TI) 2201/001 - Inspection of Additional Security Measures forRadioactive Material Quantities of Concern (RAMQC) - 1 sample
a. Inspection Scope
The inspectors reviewed the RAMQC program to assess the licensee'simplementation of the additional security measures (ASM) imposed by NRC Order EA-05-007, "Imposing Additional Security Measures on the Transportation of RAMQC," issued July 19, 2005. The inspectors also reviewed the implementation of the Safeguards Information-Modified Handling (SGI-M) protection requirements specified in NRC Order EA-04-0191, "Imposing Requirements for the Protection of Certain Safeguards Information," issued November 5, 2004.The inspectors reviewed each ASM and SGI-M requirement identified in the ordersreferenced above. The inspectors interviewed personnel and reviewed program documents and implementing procedures.b.Findings and ObservationsNo findings of significance were identified. The inspectors concluded that AmerGenpersonnel developed an adequate RAMQC program.40A6Meetings, Including ExitExit Meeting SummaryOn May 23, 2007, the NRC inspectors presented the inspection results toMr. A. Farenga. The inspectors confirmed that proprietary and safeguards information were not included in this inspection report.Attachment:Supplemental Information A-1Attachment
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
AmerGen Energy Company
- A. Farenga, Radiation Protection Technical Support Manager
- G. Ewart, Site Security Supervisor
- M. McKenna, Operations Shift Supervisor
LIST OF ITEMS
OPENED, CLOSED AND DISCUSSEDOPENTemporary Inspection (TI) 2201/001 - Inspection of Additional SecurityMeasures for Radioactive Material Quantities of Concern (RAMQC)CLOSEDTemporary Inspection (TI) 2201/001 - Inspection of Additional SecurityMeasures for Radioactive Material Quantities of Concern (RAMQC)
LIST OF DOCUMENTS REVIEWED
Section 4OA5 Other ActivitiesProceduresRP-AA-600, "Radioactive Material/Waste Shipments"RP-AA-600-1006, "Notification Requirements for Radioactive/Waste Shipments Greater than the Radioactive Material Quantities of Concern (RAMQC)"
ASMAdditional Security MeasuresRAMQCRadioactive Material Quantities of Concern
SGI-MSafeguards Information-Modified Handling
- TIT emporary Instruction