ML072430076: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 08/31/2007
| issue date = 08/31/2007
| title = 8/31/07 Perry-Mid-Cycle Performance Review and Inspection Plan
| title = 8/31/07 Perry-Mid-Cycle Performance Review and Inspection Plan
| author name = Caldwell J L
| author name = Caldwell J
| author affiliation = NRC/RGN-III/ORA
| author affiliation = NRC/RGN-III/ORA
| addressee name = Allen B S
| addressee name = Allen B
| addressee affiliation = FirstEnergy Nuclear Operating Co
| addressee affiliation = FirstEnergy Nuclear Operating Co
| docket = 05000440
| docket = 05000440

Revision as of 20:13, 12 July 2019

8/31/07 Perry-Mid-Cycle Performance Review and Inspection Plan
ML072430076
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 08/31/2007
From: Caldwell J
Region 3 Administrator
To: Allen B
FirstEnergy Nuclear Operating Co
References
Download: ML072430076 (7)


Text

August 31, 2007 Mr. Barry S. Allen Site Vice President

FirstEnergy Nuclear Operating Company

Perry Nuclear Power Plant

P. O. Box 97, 10 Center Road, A-PY-290

Perry, OH 44081-0097

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PERRY NUCLEAR POWER PLANT, UNIT 1

Dear Mr. Allen:

On August 14, 2007, the NRC staff completed its performance review of Perry for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The

purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security-Related Information" will

include the security cornerstone review and resultant inspection plan.

On May 1, 2007, the NRC staff completed an update of our assessment of the Perry Nuclear Power Plant. Our May 2, 2007, letter informed FirstEnergy Nuclear Operating Company that

all actions had been completed for Perry to exit the Multiple/Repetitive Degraded Cornerstone

column of the NRC's Action Matrix. Therefore, effective the second quarter 2007, the Perry

plant exited the Multiple/Repetitive Degraded Cornerstone column and was placed in the

Regulatory Response column, based on the White Emergency AC Power System mitigating

systems performance index from January 2007.

Regarding the White Performance Index, Region III conducted Supplemental Inspection 95001, "Inspection for One or Two White Inputs

in a Strategic Performance Area," during the week of August 20 to assess the root cause

analysis and implementation of corrective actions for the performance index. The results will be documented in a report within 30 days of the end of the supplemental inspection.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan is provided to allow for the resolution of any

scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. Of note, the plan includes a component design bases inspection scheduled for April 2008. The

inspections scheduled within the last nine months of the inspection plan are tentative and may

be revised at the end-of-cycle review.

B. Allen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC

Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise

the inspection plan, we will contact you to discuss the change as soon as possible. Please

contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this

letter or the inspection plan.

Sincerely,/RA/James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58

Enclosure:

Perry Inspection/Activity Plan DISTRIBUTION See next page B. Allen In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC

Public Document Room or from the Pub licly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances cause us to revise

the inspection plan, we will contact you to discuss the change as soon as possible. Please

contact Bruce Burgess at (630) 829-9629 with any questions you may have regarding this

letter or the inspection plan.

Sincerely,/RA/James L. Caldwell Regional Administrator Docket No. 50-440 License No. NPF-58

Enclosure:

Perry Inspection/Activity Plan DISTRIBUTION See next pageDOCUMENT NAME:G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Perry\Perry MOC 2007 letter.wpdX Publicly Available G Non-Publicly Available G SensitiveX Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIIRIIIRIIINAMEGWright:dtpBBurgessAHsia for CPederson JCaldwellDATE08/21/0708/21/0708/28/0708/29/07 OFFICIAL RECORD COPY Letter to B. Allen from J. Caldwell dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PERRY NUCLEAR POWER PLANT, UNIT 1cc w/encl:J. Hagan, President and Chief Nuclear Officer - FENOC J. Lash, Senior Vice President of Operations and

Chief Operating Officer - FENOC

D. Pace, Senior Vice President, Fleet Engineering - FENOC

J. Rinckel, Vice President, Fleet Oversight - FENOC

R. Anderson, Vice President, Nuclear Support - FENOC

Director, Fleet Regulatory Affairs - FENOC

Manager, Fleet Licensing - FENOC

Manager, Site Regulatory Compliance - FENOC

D. Jenkins, Attorney, FirstEnergy Corp.

Public Utilities Commission of Ohio

Ohio State Liaison Officer

R. Owen, Ohio Department of Health

President, Geauga County Board

Director, Department of Emergency Services

Geauga County Sheriff

President, Ashtabula County Board of Commissioners

Ashtabula County Sheriff

Director, Ashtabula County Emergency

Management Agency

Mayor, Village of Genoa

Genoa Village Administrator

President, Lake County Board of Commissioners

Lake County Sheriff

Painesville City Manager

Lake County Administrator

Director, Lake County Emergency Management Agency

President, Village of Fairport Harbor

Mayor, City of Eastlake

Mayor, City of Wickliffe

President, Geneva City Council

City Manager, Geneva

Mayor, City of Kirtland

Mayor, City of Mentor

City Manager, Mentor

Mayor, City of Mentor on the Lake

Administrative Director

Mayor, City of Willoughby Hills

Mayor, City of Willoughby

Mayor, City of Willowick

Mayor, Village of Madison

Village Administrator, Village of Madison

Chairman, Board of Madison Township Trustees

Mayor, Village of Kirtland Hills

Mayor, Village of Geneva-on-the-Lake

Mayor, Lakeline Village

Mayor, Village of Timberlake

Mayor, Village of Grand River

INPO Letter to B. Allen from J. Caldwell dated August 31, 2007

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -

PERRY NUCLEAR POWER PLANT, UNIT 1 DISTRIBUTION

RAG1 TJW2 TEB RidsNrrDirslpab

JLC1 MAS KGO RML2 SAM9 SRI Perry

DRPIII DRSIII PLB1 TXN Perry Inspection / Activity Plan 09/01/2007

-12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 08/28/2007 Report 22 2 BI ENG-ENGINEERING MODIFICATIONS / 50.59 INSP.

Baseline Inspections 08/27/2007 09/14/2007 1 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 08/27/2007 09/14/2007 1 7111117B IP Permanent Plant Modifications 1 BI EP-EP ROUTINE INSPECTION / PI VERIFICATION Baseline Inspections 10/16/2007 10/20/2007 1 7111402 IP A lert and Notification System Testing Baseline Inspections 10/16/2007 10/20/2007 1 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 10/16/2007 10/20/2007 1 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 10/16/2007 10/20/2007 1 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/16/2007 10/20/2007 1 71151-EP02 IP ERO Drill Participation Baseline Inspections 10/16/2007 10/20/2007 1 71151-EP03 IP A lert & Notification System 1 95003-INDEPENDENT CAP FOLLOW UP Supplemental Progra m 10/01/2007 11/30/2007 1 95003 IP Inspection For Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multipl e 2 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/22/2007 10/26/2007 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 10/22/2007 10/26/2007 1 7112102 IP A LARA Planning and Controls Baseline Inspections 10/22/2007 10/26/2007 1 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/22/2007 10/26/2007 1 71151-PR01 IP RETS/ODCM Radiological Effluent 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 12/10/2007 12/14/2007 1 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1 RPV HEAD-RPV HEAD DROP ANALYSIS INSPECTION Baseline Inspections 01/07/2008 02/15/2008 1 7111120 IP Refueling and Other Outage Activities 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/10/2008 03/14/2008 1 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P Baseline Inspections 03/10/2008 03/14/2008 1 71151-PR01 IP RETS/ODCM Radiological Effluent 5 BI ENG-COMPONENT DESIGN BASES INSPECTION Baseline Inspections 04/14/2008 05/16/2008 1 7111121 IP Component Design Bases Inspection 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/08/2008 09/12/2008 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 09/08/2008 09/12/2008 1 71151-OR01 IP Occupational Exposure Control Effectiveness 3 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION Baseline Inspections 10/06/2008 10/10/2008 1 7111401 IP Exercise Evaluation Baseline Inspections 10/06/2008 10/10/2008 1 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/06/2008 10/10/2008 1 71151-EP02 IP ERO Drill Participation Baseline Inspections 10/06/2008 10/10/2008 1 71151-EP03 IP A lert & Notification System This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Perry Inspection / Activity Plan 09/01/2007

-12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/28/2007 Report 22 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/13/2008 10/17/2008 1 7112102 IP A LARA Planning and Controls Baseline Inspections 10/13/2008 10/17/2008 1 71151-BI01 IP Reactor Coolant System Activity 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 11/17/2008 11/21/2008 1 7112202 IP Radioactive Material Processing and Transportation 2 BI OL-BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 12/01/2008 12/05/2008 1 7111111B IP Licensed Operator Requalification Program This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.