|
|
Line 3: |
Line 3: |
| | issue date = 10/08/2008 | | | issue date = 10/08/2008 |
| | title = Summary of the September 16, 2008, Pre-Application Meeting with Entergy Nuclear Operations, Inc to Discuss Spent Fuel Criticality Amendment for Palisades Nuclear Plant (Tac No. MD9561) | | | title = Summary of the September 16, 2008, Pre-Application Meeting with Entergy Nuclear Operations, Inc to Discuss Spent Fuel Criticality Amendment for Palisades Nuclear Plant (Tac No. MD9561) |
| | author name = Chawla M L | | | author name = Chawla M |
| | author affiliation = NRC/NRR/DORL/LPLIII-1 | | | author affiliation = NRC/NRR/DORL/LPLIII-1 |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000255 | | | docket = 05000255 |
| | license number = DPR-020 | | | license number = DPR-020 |
| | contact person = Chawla M L, NRR/DORL, 415-8371 | | | contact person = Chawla M, NRR/DORL, 415-8371 |
| | case reference number = FOIA/PA-2009-0008A | | | case reference number = FOIA/PA-2009-0008A |
| | document type = Meeting Summary | | | document type = Meeting Summary |
Line 21: |
Line 21: |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE SEPTEMBER 16, 2008, PRE-APPLICATION MEETING WITH Et"HERGY NUCLEAR OPERATIONS, INC REGLARDING SPENT FUEL CRITICALITY AMENDMENT (TAC NO. MD9561) On September 16,2008, the U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of Entergy Nuclear Operations, Inc. (ENO) at NRC Headquarters in Rockville, MD. The purpose of the meeting was to discuss future license amendment request which Entergy plans to submit for resolution of Spent Fuel Pool (SFP) Criticality issue for Palisades Nuclear Plant (PNP). A list of attendees is provided as Enclosure | | OF THE SEPTEMBER 16, 2008, PRE-APPLICATION MEETING WITH Et"HERGY NUCLEAR OPERATIONS, INC REGLARDING SPENT FUEL CRITICALITY AMENDMENT (TAC NO. MD9561) On September 16,2008, the U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of Entergy Nuclear Operations, Inc. (ENO) at NRC Headquarters in Rockville, MD. The purpose of the meeting was to discuss future license amendment request which Entergy plans to submit for resolution of Spent Fuel Pool (SFP) Criticality issue for Palisades Nuclear Plant (PNP). A list of attendees is provided as Enclosure |
| : 1. The licensee's handout material has been docketed and is publicly available at Agencywide Documents Access and Management System (ADAMS) Accession No. ML08261 0237. During the meeting, Palisades SFP layout and historical background of the current issue with SFP racks and SFP criticality was discussed between the licensee and the NRC staff. The licensee presented their proposed plan for resolving Palisades SFP criticality issue, consisting of two phases. In the first phase, licensee plans to submit a license amendment request (LAR) to re-establish compliance with their Technical Specifications and Title 10 of the Code of Federal Regulations (10 CFR) 50.68. This submittal will be particularly straight forward and conservative to facilitate an expeditious review and approval by the NRC. During the meeting the NRC staff stressed the importance of a high quality clearly articulated submittal in order to provide the best opportunity to meet the licensee's scheduled refueling outage. In the second phase, a more rigorous analysis incorporating appropriate surveillance requirements will be incorporated into a LAR to be submitted by the licensee in 2009. The second phase LAR will include a more complex analysis that removes excess conservatism intended to facilitate the review of the first, and restores as much SFP storage capacity as is practical. | | : 1. The licensee's handout material has been docketed and is publicly available at Agencywide Documents Access and Management System (ADAMS) Accession No. ML082610237. During the meeting, Palisades SFP layout and historical background of the current issue with SFP racks and SFP criticality was discussed between the licensee and the NRC staff. The licensee presented their proposed plan for resolving Palisades SFP criticality issue, consisting of two phases. In the first phase, licensee plans to submit a license amendment request (LAR) to re-establish compliance with their Technical Specifications and Title 10 of the Code of Federal Regulations (10 CFR) 50.68. This submittal will be particularly straight forward and conservative to facilitate an expeditious review and approval by the NRC. During the meeting the NRC staff stressed the importance of a high quality clearly articulated submittal in order to provide the best opportunity to meet the licensee's scheduled refueling outage. In the second phase, a more rigorous analysis incorporating appropriate surveillance requirements will be incorporated into a LAR to be submitted by the licensee in 2009. The second phase LAR will include a more complex analysis that removes excess conservatism intended to facilitate the review of the first, and restores as much SFP storage capacity as is practical. |
| -2 There were not any members of the public present at the meeting. No comments or feedback was received at this time. Please direct any inquiries to Mr. Mahesh Chawla, NRC Project Manager for PNP, at 301-415-8371, or @ Mahesh.chawla@nrc.gov. | | -2 There were not any members of the public present at the meeting. No comments or feedback was received at this time. Please direct any inquiries to Mr. Mahesh Chawla, NRC Project Manager for PNP, at 301-415-8371, or @ Mahesh.chawla@nrc.gov. |
| Sincerely, CW,fttl-Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket 1\10. 50-255 | | Sincerely, CW,fttl-Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket 1\10. 50-255 |
Revision as of 06:37, 12 July 2019
Letter Sequence Request |
---|
|
|
MONTHYEARML0826102372008-09-16016 September 2008 Spent Fuel Pool Storage Interim Criticality Analysis Project stage: Request ML0826811402008-10-0808 October 2008 Summary of the September 16, 2008, Pre-Application Meeting with Entergy Nuclear Operations, Inc to Discuss Spent Fuel Criticality Amendment for Palisades Nuclear Plant (Tac No. MD9561) Project stage: Request ML0907207082009-03-12012 March 2009 Meeting Handouts for Pre-Application Meeting with Entergy Operations, Inc. (Eno), to Discuss Spent Fuel Criticality Amendment for Palisades Nuclear Plant Project stage: Meeting ML0908404732009-04-13013 April 2009 Summary of Pre-Application Meeting with Entergy Nuclear Operations, Inc., Palisades, to Discuss Spent Fuel Criticality Amendment Project stage: Meeting 2008-09-16
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24267A2962024-10-0101 October 2024 Summary of Conference Call Regarding Steam Generator Tube Inspections ML24257A0582024-09-26026 September 2024 Summary of August 1, 2024, Hybrid Public Meeting on the Potential Palisades Nuclear Plant Restart ML24212A0592024-08-0606 August 2024 May 15, 2024, Summary of Meeting with Holtec Decommissioning International,Llc Regarding LAR to Approve Biasi Critical Heat Flux Correlation for Use with Main Steam Line Break Analysis to Support Potential Reauthorization of Power Operation ML24166A2912024-06-25025 June 2024 April 29, 2024, Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a Quality Assurance Program Manual to Support Potential Reauthorization of Power Operations at Palisades Nuclear Plant ML24141A0632024-05-23023 May 2024 Summary of April 17, 2024, Hybrid Public Outreach Meeting ML24089A2472024-04-0808 April 2024 March 18, 2024, Summary of Pre-Submittal Meeting with Holtec Decommissioning International, LLC Regarding Proposed Emergency Plan for Resumption of Power Operations at the Palisades Nuclear Plant ML24051A0942024-02-27027 February 2024 Summary of February 6, 2024, Pre-Submittal Meeting with Holtec Decommissioning International, LLC Regarding Technical Specifications Administrative Controls and Quality Assurance Program ML24016A0052024-01-23023 January 2024 Summary of Meeting with Holtec Decommissioning International, LLC, Regarding Power Operations Technical Specifications ML23303A2132023-11-0101 November 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit a License Transfer Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23263A0012023-09-27027 September 2023 Summary of August 29, 2023, Meeting with Holtec Decommissioning International, LLC Regarding Plan to Submit an Exemption Request as Part of a Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclea ML23171B1222023-06-22022 June 2023 Summary of Meeting with Holtec Decommissioning International, LLC Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML23107A1212023-04-20020 April 2023 Summary of Meeting with Holtec Decommissioning International, Llc Regarding Regulatory Path for Potentially Requesting Reauthorization of Power Operations at Palisades Nuclear Plant ML22292A2612022-10-31031 October 2022 PSDAR Meeting Summary ML22132A0892022-05-12012 May 2022 Summary of the April 26, 2022, Public Outreach to Discuss the NRC 2021 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21200A2262021-07-19019 July 2021 Summary of the July 1, 2021, Public Outreach to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML21145A0482021-06-0202 June 2021 Summary of May 12, 2021, Teleconference with Entergy Nuclear Operations, Inc. to Discuss Potential License Amendment Request Related to Permanently Defueled Technical Specifications for Palisades Nuclear Plant ML21012A0382021-01-14014 January 2021 December 8, 2020, Summary of Public Teleconference with Entergy Nuclear Operations Inc. Regarding Pre-submittal of a License Transfer Application to Holtec International for Palisades Nuclear Plant ML20309A2372020-11-0606 November 2020 Summary of Public Teleconference with Entergy Nuclear Operations, Inc. to Discuss Future Request for One-Time Exemption from Certain Requirements of 10 CFR 50, Appendix E, Section Iv.F. at Palisades Nuclear Plant (EPID L-2020-LRM-0091 ML20304A1442020-11-0202 November 2020 Summary of September 21, 2020, Public Teleconference with Entergy Nuclear Operations Inc. Regarding a Proposed Alternative for Repair of Reactor Vessel Head Penetrations for Palisades Nuclear Plant ML20280A6952020-10-13013 October 2020 Letter - Palisades Nuclear Plant- Summary of September 11, 2020, Conference Call with Entergy Nuclear Operations Inc. Regarding the Fall 2020 Steam Generator Tube Inspections at Palisades Nuclear Plant EPID L-2020-LRO-0051 ML20280A6962020-10-13013 October 2020 20200912 NRC Mid Outage Q and a for Phone Call for Palisades 1R27 (Revised) ML20280A6972020-10-13013 October 2020 20200910 NRC Mid Outage Q and a for Phone Call for Palisades 1R27-Entergy Responses ML20231A2202020-08-17017 August 2020 Summary of Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of the Palisades Nuclear Plant ML19296D0632019-11-0101 November 2019 August 2019 Palisades NEIMA 108 Public Meeting Summary ML19136A2552019-05-16016 May 2019 Summary of the Public Outreach/Open House to Discuss the NRC 2018 End-of-Cycle Plant Performance Assessment of the Palisades Nuclear Plant ML18351A2382018-12-18018 December 2018 Summary of Public Teleconference Call with Entergy Nuclear Operations. Inc., Regarding Emergent Alternative Request for Repair of Central Rod Drive Nozzles at Palisades Nuclear Plant ML18340A0072018-12-0606 December 2018 Summary of Call with Entergy Nuclear Operations, Inc. - Verbal Authorization of Request for Alternative for the Repair of Reactor Vessel Closure Head Penetrations ML18268A2802018-09-26026 September 2018 Summary of Public Teleconference Call with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Relocate Surveillance Frequencies to Licensee Control ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML18113A6592018-04-23023 April 2018 Summary of Open House to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Palisades Nuclear Plant ML18099A0712018-04-16016 April 2018 March 20, 2018, Summary of Meeting with the Nuclear Energy Institute and Other Industry Representatives Regarding the Surveillance Frequency Control Program ML18008A2302018-01-10010 January 2018 Summary of Public Teleconference Meeting with Entergy Nuclear Operations, Inc., Regarding Request to Extend Enforcement Discretion for Tornado-Generated Missile Non-Conformances at Palisades Nuclear Plant ML17335A0262017-12-0505 December 2017 Summary of November 27, 2017 Public Meeting with Entergy Nuclear Operations, Inc. Regarding Request to Extend Enforcement Discretion for Tornado Missle Non-Confomances ML17338B0502017-12-0505 December 2017 Summary of November 28, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding a Potential Request Associated with an Alternative to the Reexamination Frequency for a Relevant Condition ML17227A2742017-08-14014 August 2017 Summary of the July 26, 2017, Public Meeting Regarding Palisades Nuclear Plant ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17164A3112017-06-27027 June 2017 Summary of 06/12/2017, Pre-Submittal Meeting with Entergy Nuclear Operations, Inc. to Discuss Palisades Nuclear Plant Post Shutdown Emergency Plan and Administrative Technical Specification License Amendment Request ML17160A1812017-06-14014 June 2017 Summary of Conference Call with Palisades Nuclear Plant Regarding the Spring 2017 Steam Generator Inspections ML17080A1492017-03-23023 March 2017 Summary of March 20, 2017, Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Cyber Security Plan Implementation Schedule ML16344A0862016-12-20020 December 2016 Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding National Fire Protection Association Standard 805 ML16277A6772016-10-11011 October 2016 Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding the Proposed Closure Plant for Generic Safety Issue 191, Assessment of Debris Accumulation on Pressurized Water Reactor (PWR) Sump Performance ML16182A5142016-06-30030 June 2016 Summary of the June 23, 2016, Public Meeting Regarding Palisades Nuclear Plant ML16127A1722016-05-0505 May 2016 6/23/16 Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Palisades Nuclear Plant Performance for the 2015 Calendar Year ML16035A4252016-03-0101 March 2016 Summary of January 25, 2016, Pre-Application Teleconference Meeting with Entergy Nuclear Operations to Discuss a Forthcoming License Amendment Request Regarding Steam Generator Cold Leg Alternate Repair Criteria at Palisades Nuclear Plant ( ML15294A2972015-10-27027 October 2015 Steam Generator Tube Inspection Discussion During Palisades 2015 (RF24) Outage (Preliminary Information) ML15294A2922015-10-27027 October 2015 Summary of Conference Call with Palisades Nuclear Plant Regarding the Fall 2015 Steam Generator Inspections ML15272A0652015-09-30030 September 2015 Summary of Telephone Conference on September 28, 2015, Verbal Authorization of Relief Request for Palisades Nuclear Plant ML15261A0392015-09-21021 September 2015 September 17, 2015, Summary of Telephone Conference Verbal Authorization of Relief Request for Palisades Nuclear Plant ML15119A0442015-05-0606 May 2015 Summary of April 14, 2015, Meeting with Entergy Nuclear Operations, Inc. on Plans for Volumetric Examinations of Primary Coolant System Alloy 600 Welds ML15118A0352015-04-27027 April 2015 Meeting Summary with Public to Discuss the 2014 Annual Assessment Results for Palisades Nuclear Plant 2024-09-26
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 October 8, 2008 LICENSEE:
Entergy Nuclear Operations, Inc. FACILITY:
Palisades Nuclear Plant PALISAIDES NUCLEAR PLANT,
SUMMARY
OF THE SEPTEMBER 16, 2008, PRE-APPLICATION MEETING WITH Et"HERGY NUCLEAR OPERATIONS, INC REGLARDING SPENT FUEL CRITICALITY AMENDMENT (TAC NO. MD9561) On September 16,2008, the U.S. Nuclear Regulatory Commission (NRC) staff held a Category 1 public meeting with representatives of Entergy Nuclear Operations, Inc. (ENO) at NRC Headquarters in Rockville, MD. The purpose of the meeting was to discuss future license amendment request which Entergy plans to submit for resolution of Spent Fuel Pool (SFP) Criticality issue for Palisades Nuclear Plant (PNP). A list of attendees is provided as Enclosure
- 1. The licensee's handout material has been docketed and is publicly available at Agencywide Documents Access and Management System (ADAMS) Accession No. ML082610237. During the meeting, Palisades SFP layout and historical background of the current issue with SFP racks and SFP criticality was discussed between the licensee and the NRC staff. The licensee presented their proposed plan for resolving Palisades SFP criticality issue, consisting of two phases. In the first phase, licensee plans to submit a license amendment request (LAR) to re-establish compliance with their Technical Specifications and Title 10 of the Code of Federal Regulations (10 CFR) 50.68. This submittal will be particularly straight forward and conservative to facilitate an expeditious review and approval by the NRC. During the meeting the NRC staff stressed the importance of a high quality clearly articulated submittal in order to provide the best opportunity to meet the licensee's scheduled refueling outage. In the second phase, a more rigorous analysis incorporating appropriate surveillance requirements will be incorporated into a LAR to be submitted by the licensee in 2009. The second phase LAR will include a more complex analysis that removes excess conservatism intended to facilitate the review of the first, and restores as much SFP storage capacity as is practical.
-2 There were not any members of the public present at the meeting. No comments or feedback was received at this time. Please direct any inquiries to Mr. Mahesh Chawla, NRC Project Manager for PNP, at 301-415-8371, or @ Mahesh.chawla@nrc.gov.
Sincerely, CW,fttl-Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket 1\10. 50-255
Enclosure:
List of Attendees cc: Distribution via ListServ PRE-APPLICATION MEETING BETWEEN US.NUCLEAR REGULATORY ENTERGY I\JUCLEAR OPEARTIONS, LIST OF PALISADES, NUCLEAR PLANT SPENT FUEL POOL CRITICALITY SEPTEMBER 16, 2008 Organization In the order of signing up: Mahesh (Mac) Chawla f\lRC/NRR/Plant Licensing Branch 111-1 -Project Manager Emma Wong NRC/I\JRRIDCI/CSGB
-Staff Engineer John Ellegood NRC/R-III/BR-4/PALISADES
-Senior Resident Engineer Kent Wood NRRIDSS/SRXB
-Senior Staff Engineer Diane Jackson NRRIDSS/SRXB
-Senior Staff Engineer Greg Cranston NRC/DSS/SRXB
-Branch Chief Paul Broda AREVA -Project Manager Robert Smith AREVA -Staff Engineer Thomas W. Allen ENTERGY -Senior Engineer Michael R. McKinney ENTERGY -Supervisor
-PWR Fuel Engineering Laurie Lahti ENTERGY -PALISADES
-Licensing Manager Fred Smith ENTERGY -Manager -Fuel and Analysis Richard Schmidt ENTERGY -RE Supervisor Dick Deveney AREVA -Supervisor NT NRR -Office of Nuclear Reactor Regulation DCI-Division of Component Integrity CSGB -SG Tube Integrity and Chemical Engineering Branch DSS -Division of Safety Systems SRXB -Reactor Systems Branch October 8, 2008 -2 There were not any members of the public present at the meeting. No comments or feedback was received at this time. Please direct any inquiries to Mr. Mahesh Chawla, NRC Project Manager for PNP, at 301-415-8371, or @ Mahesh.chawla@nrc.gov.
Sincerely, lRAI Mahesh Chawla, Project Manager Plant Licensing Branch 111-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No.
List of cc: Distribution via ListServ DISTRIBUTION:
PUBLIC LPL3-1 r/f RidsNrrPMMChawla RidsAcrsAcnw&mMailCenter
RidsNrrGCranston Region 111-RTelson RBywater, EDO RidsRgn3Mailcenter RidsNrrBTully RidsNrrEWong
RidsNrrDJackson Region III -JEliegood Adams Accession:
ML082681140 1\ RidsNrrDorlLpl3-1 RidsOgcRp RidsNrrKWood RidsNrrLJames OFFICE LPL3*1/PM LPL3.1/LA_
l,-/ SRXB/BC REGION III/BC RTelson '/1.':[" 108 NAME GLappe.W +-en l.'f r GCranston DATE /0 1;L 108 ., L I 10/2/08 _/ /()I 7 108 -, t " "'}oj" .I LPL3-1/BC
- /? I LJames rJ"'y-yv (J l (J f("108 OFFICIAL RECORD COPY