|
|
Line 3: |
Line 3: |
| | issue date = 05/05/2010 | | | issue date = 05/05/2010 |
| | title = Request for Withholding Information from Public Disclosure | | | title = Request for Withholding Information from Public Disclosure |
| | author name = Wang A B | | | author name = Wang A |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
| | addressee name = Becker J R | | | addressee name = Becker J |
| | addressee affiliation = Pacific Gas & Electric Co | | | addressee affiliation = Pacific Gas & Electric Co |
| | docket = 05000275, 05000323 | | | docket = 05000275, 05000323 |
Line 21: |
Line 21: |
|
| |
|
| ==Dear Mr. Becker:== | | ==Dear Mr. Becker:== |
| By letter dated April 9, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 101100646), you submitted an affidavit dated April 9, 2010, executed by James R. Becker, Site Vice President, Pacific Gas and Electric Company (PG&E), requesting that the information contained in the follOWing document (Enclosure 1 of the April 9, 2010, letter) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: Topical Report: "Process Protection System Replacement Diversity | | By letter dated April 9, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101100646), you submitted an affidavit dated April 9, 2010, executed by James R. Becker, Site Vice President, Pacific Gas and Electric Company (PG&E), requesting that the information contained in the follOWing document (Enclosure 1 of the April 9, 2010, letter) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: Topical Report: "Process Protection System Replacement Diversity |
| & in-Depth Assessment," Rev 0, March 2010 A nonproprietary copy of this document, provided as Enclosure 3 to the letter dated April 9, 2010, has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the ADAMS Public Electronic Reading Room in ADAMS Accession No. ML 101100647. | | & in-Depth Assessment," Rev 0, March 2010 A nonproprietary copy of this document, provided as Enclosure 3 to the letter dated April 9, 2010, has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the ADAMS Public Electronic Reading Room in ADAMS Accession No. ML101100647. |
| The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of [PG&E's] knowledge or belief. Further, this information has substantial commercial value. It consist of technical design details that support a robust design for a digital upgrade of the reactor trip system and engineered safety features actuation system. Use of the technical design details by a competitor would reduce their expenditure of resources in licensing a similar digital upgrade to the reactor trip system and engineered safety features actuation system. | | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of [PG&E's] knowledge or belief. Further, this information has substantial commercial value. It consist of technical design details that support a robust design for a digital upgrade of the reactor trip system and engineered safety features actuation system. Use of the technical design details by a competitor would reduce their expenditure of resources in licensing a similar digital upgrade to the reactor trip system and engineered safety features actuation system. |
| J. -2Pu.blic disclosure of this confidential information is likely to cause substantial harm to the competitive position of PG&E because it would enable others to use the information to meet NRC requirements for licensing documentation for digital upgrades without purchasing the right to use the information. The development of the design details for the digital upgrade of the reactor trip system and engineered safety features actuation system is the result of applying the results of many years of experience in an extensive PG&E effort and the expenditure of a considerable sum of money. In order for competitors of PG&E to duplicate this information, similar technical design details would have to be developed and a significant manpower effort, having the requisite talent and experience, would have to be expended. | | J. -2Pu.blic disclosure of this confidential information is likely to cause substantial harm to the competitive position of PG&E because it would enable others to use the information to meet NRC requirements for licensing documentation for digital upgrades without purchasing the right to use the information. The development of the design details for the digital upgrade of the reactor trip system and engineered safety features actuation system is the result of applying the results of many years of experience in an extensive PG&E effort and the expenditure of a considerable sum of money. In order for competitors of PG&E to duplicate this information, similar technical design details would have to be developed and a significant manpower effort, having the requisite talent and experience, would have to be expended. |
Line 33: |
Line 33: |
| Sincerely, otvn Alan B. Wang, prOjeoYManager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv J. Becker -3 If you have any questions regarding this matter, I may be reached at 301-415-1445. | | Sincerely, otvn Alan B. Wang, prOjeoYManager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv J. Becker -3 If you have any questions regarding this matter, I may be reached at 301-415-1445. |
| Sincerely, IRAJ Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv DISTRIBUTION: | | Sincerely, IRAJ Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv DISTRIBUTION: |
| PUBLIC LPL4 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEicb Resource RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMDiabloCanyon Resource RidsOgcRp Resource RidsRgn4MailCenter Resource ADAMS Accession No. ML 101130176 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DE/EICB/BC NRR/LPL4/BC NRR/LPL4/PM I NAME AWang JBurkhardt WKemper MMarkley CFLyon for AWang DATE 4/28/10 4/28/10 5/3110 5/4/10 5/5110 OFFICIAL RECORD}} | | PUBLIC LPL4 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEicb Resource RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMDiabloCanyon Resource RidsOgcRp Resource RidsRgn4MailCenter Resource ADAMS Accession No. ML101130176 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DE/EICB/BC NRR/LPL4/BC NRR/LPL4/PM I NAME AWang JBurkhardt WKemper MMarkley CFLyon for AWang DATE 4/28/10 4/28/10 5/3110 5/4/10 5/5110 OFFICIAL RECORD}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML1011006472010-03-31031 March 2010 Topical Report, Process Protection System Replacement Diversity & Defense-in-Depth Assessment, Revision 0 Project stage: Request ML1011301762010-05-0505 May 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1013704512010-05-17017 May 2010 Acceptance Review Email, Review of the Topical Report, Process Protection System Replacement Diversity and Defense-in-Depth Assessment, Rev. 0, Related to License Amendment Request for Digital Upgrade (TAC ME3722-ME3733) Project stage: Acceptance Review ML1019304982010-07-12012 July 2010 Email, Request for Additional Information Regarding Diversity and Defense in Depth Topical Report Project stage: RAI 2010-05-17
[Table View] |
|
---|
Category:Letter
MONTHYEARML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A1922024-11-0101 November 2024 Ltr to G. Frausto Coastal Band of Chumash Indians Re DCPP Dseis ML24302A1952024-11-0101 November 2024 Ltr to M. Olivas Tucker Ytt Re DCPP Dseis ML24302A1912024-11-0101 November 2024 Ltr to C. Mcdarment Tule River Tribe Re DCPP Dseis ML24302A1942024-11-0101 November 2024 Ltr to K. Kahn Santa Ynez Band of Chumash Indians Re DCPP Dseis ML24302A1962024-11-0101 November 2024 Ltr to SLO County Chumash Indians Re DCPP Dseis ML24302A1932024-11-0101 November 2024 Letter to G. Pierce Salinan Tribe of Monterey, SLO Re DCPP Dseis ML24302A1972024-11-0101 November 2024 Letter to V. Sage Walker Northern Chumash Tribal Council Re DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 IR 05000275/20240032024-10-30030 October 2024 Integrated Inspection Report 05000275/2024003 and 05000323/2024003 and Independent Spent Fuel Storage Installation Report 07200026/2024001 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24284A3122024-10-28028 October 2024 Ltr to P Ting, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants ML24284A3112024-10-28028 October 2024 Ltr to a Peck, Diablo Canyon Nuclear Power Plant Units 1 and 2 Notice of Avail of Draft Supplement 62 to the GEIS for Lic Renew of Nuclear Plants IR 05000275/20240132024-10-28028 October 2024 – License Renewal Report 05000275/2024013 and 05000323/2024013 DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application 2024-09-09
[Table view] Category:Proprietary Information Review
MONTHYEARDCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure ML16113A2512016-05-0505 May 2016 Request for Withholding Information from Public Disclosure, 3/12/14 and 4/9/14 Affidavits Executed by B. Herschthal, Invensys/Schneider Electric Five Proprietary Documents ML16112A4052016-04-28028 April 2016 Request for Withholding Information from Public Disclosure, 4/25/13 Affidavit Executed by S. Roberts, CS Innovations, Five Proprietary Documents ML16113A0092016-04-28028 April 2016 Request for Withholding Information from Public Disclosure, 12/20/12 and 2/26/13 Affidavits Executed by R. Shaffer, Invensys Operations Management Six Proprietary Documents ML16110A4032016-04-28028 April 2016 Request for Withholding Information from Public Disclosure, 1/30/13, 1/30/13, and 1/28/13 Affidavits Executed by J. Gresham, Westinghouse WCAP-17696-P, WCAP-17706-P, and LTR-RAM-I-13-002-P ML16056A5272016-03-0707 March 2016 Request for Withholding Information from Public Disclosure, 2/11/16 Affidavit Executed by B. Haynes, Invensys/Schneider Electric; 17 Proprietary Documents ML16032A4222016-02-24024 February 2016 Request for Withholding Information from Public Disclosure, 10/27/15 Affidavit Executed by J. Gresham, Westinghouse Electric Company; 17 Proprietary Documents ML16033A0282016-02-24024 February 2016 Request for Withholding Information from Public Disclosure, 1/5/16 Affidavit Executed by J. Gresham, Westinghouse Electric Company; 1 Proprietary Document (Letter from Vendor) ML15257A2482015-09-18018 September 2015 Request for Withholding Information from Public Disclosure - 7/29/15 Affidavit Executed by J. Gresham, Westinghouse Information to Support Relief Request from Inspection Requirements for Main Steam Nozzle Inner Radius ML15201A0742015-08-25025 August 2015 Request for Withholding Information from Public Disclosure - 6/25/15 Affidavit Executed by H. Sepp, Westinghouse Electric Company LLC, Licensee'S 7/8/15 Responses to Request for Additional Information ML15044A2772015-03-0909 March 2015 Request for Withholding Information from Public Disclosure, 1/15/15 Affidavit Executed by J. Gresham, Westinghouse Electric Company; Four Proprietary Documents ML14309A1562014-11-12012 November 2014 Request for Withholding Information from Public Disclosure - 7/29/2014 Affidavit Executed by James Gresham, Westinghouse SFAD-14-79, Attachment 1 ML13295A6242013-11-25025 November 2013 Request for Withholding Information from Public Disclosure, 8/22/13 Affidavit Executed by J. Gresham, Westinghouse Electric Company; Five Proprietary Documents ML13170A1962013-07-11011 July 2013 Request for Withholding Information from Public Disclosure - 3/5/2013 Affidavit Executed by G. Elliott, Areva Np Inc., Regarding Areva Calculations Provided for Relief Request REP-1 U2, Revision 2 ML13028A5052013-02-28028 February 2013 Request for Withholding Information from Public Disclosure, 11/26/12 Affidavit Executed by S. Roberts, CS Innovations, LLC, Five Proprietary Documents ML13025A3482013-02-28028 February 2013 Request for Withholding Information from Public Disclosure, 11/1/12 Affidavit Executed by R. Shaffer, Invensys Operations Management, Nine Invensys Documents Via 11/27/12 Letters ML12228A4042012-10-10010 October 2012 Request for Withholding Information from Public Disclosure, 7/23/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, for 993754-1-802 R2, 993754-1-813 R1, and 993754-1-906 R1 ML12178A1152012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by J. Gresham, Westinghouse on 1 Proprietary Document ML12177A2312012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by Scott Roberts, CS Innovations, LLC on 10 Proprietary Documents ML12142A1112012-05-24024 May 2012 Request for Withholding Information from Public Disclosure, 4/10/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, Maximum Tsap Scan Time ML1025707772010-10-25025 October 2010 Request for Withholding Information from Public Disclosure - 6/14/2010 Affidavit Executed by J. Gresham, Westinghouse ML1028004462010-10-20020 October 2010 Withholding from Public Disclosure, Diablo Canyon Power Plant Topical Report, Process Protection System Replacement Diversity & Defense-in-Depth Assessment, Revision 1 ML1025605302010-10-0808 October 2010 Request for Withholding Information from Public Disclosure - 8/12/10 Affidavit Executed by J. Becker, PG&E ML1011301762010-05-0505 May 2010 Request for Withholding Information from Public Disclosure ML0733402552007-12-13013 December 2007 Request for Withholding Information from Public Disclosure 2.390 Finding for 8/9/07 Letter (Tac Nos, MD3992 and MD3993) ML0705700132007-03-0101 March 2007 Westinghouse Electric Company Request for Withholding Information from Public Disclosure (CAW-06-2224) ML0609702712006-04-0404 April 2006 Withholding from Public Disclosure, CAW-06-2112, MD0385 & MD0386 ML0508302722005-03-17017 March 2005 Request for Withholding Information from Public Disclosure (Tac. MC5143 and MC5144) ML0432704352004-11-19019 November 2004 Withholding from Public Disclosure, WCAP-14529-P, Revision 0 (CAW-04-1895) ML0432304352004-11-17017 November 2004 Request for Withholding Information from Public Disclosure (CAW-04-1804, CAW-04-1846, and CAW-04-1881) (Tac Nos. MC0893 and MC0894) ML0420201832004-07-19019 July 2004 7/19/04 Diablo Canyon - Requests for Withholding Information from Public Disclosure (CAW-04-1853). (Tacs. MC1210 and MC1211) ML0411702852004-04-26026 April 2004 Diablo Canyon, Request for Withholding Information from Public Disclosure (CAW-03-1747) ML0411200492004-04-19019 April 2004 4/19/04, Request for Withholding Information from Public Disclosure (CAW-03-1741) ML0333809922003-12-0202 December 2003 Request for Withholding Information from Public Disclosure (CAW-03-1680) (Tac. MC1210 and MC1211) ML0330203802003-10-28028 October 2003 Request for Withholding Information from Public Disclosure, WCAP-11082, Revision 6, (CAW-03-1609) (Tac Nos. MC0893 and MC0894) ML0300804142003-01-0808 January 2003 Withholding from Public Disclosure, WCAP-15113, RCS Flow Measurement Using Elbow Tap Methodology, MB6760 & MB6761 2023-07-27
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 May 5, 2010 Mr. James R. Becker Site Vice President Pacific Gas and Electric Company Diablo Canyon Power Plant Mail Code 104/5/601 P.O. Box 56 Avila Beach, CA 93424 REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR DIABLO CANYON POWER PLANT, UNIT NOS. 1 AND 2 (TAC NOS. ME3732 AND ME3733)
Dear Mr. Becker:
By letter dated April 9, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML101100646), you submitted an affidavit dated April 9, 2010, executed by James R. Becker, Site Vice President, Pacific Gas and Electric Company (PG&E), requesting that the information contained in the follOWing document (Enclosure 1 of the April 9, 2010, letter) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: Topical Report: "Process Protection System Replacement Diversity
& in-Depth Assessment," Rev 0, March 2010 A nonproprietary copy of this document, provided as Enclosure 3 to the letter dated April 9, 2010, has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the ADAMS Public Electronic Reading Room in ADAMS Accession No. ML101100647.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of [PG&E's] knowledge or belief. Further, this information has substantial commercial value. It consist of technical design details that support a robust design for a digital upgrade of the reactor trip system and engineered safety features actuation system. Use of the technical design details by a competitor would reduce their expenditure of resources in licensing a similar digital upgrade to the reactor trip system and engineered safety features actuation system.
J. -2Pu.blic disclosure of this confidential information is likely to cause substantial harm to the competitive position of PG&E because it would enable others to use the information to meet NRC requirements for licensing documentation for digital upgrades without purchasing the right to use the information. The development of the design details for the digital upgrade of the reactor trip system and engineered safety features actuation system is the result of applying the results of many years of experience in an extensive PG&E effort and the expenditure of a considerable sum of money. In order for competitors of PG&E to duplicate this information, similar technical design details would have to be developed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
J. Becker -If you have any questions regarding this matter, I may be reached at 301-415-1445.
Sincerely, otvn Alan B. Wang, prOjeoYManager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv J. Becker -3 If you have any questions regarding this matter, I may be reached at 301-415-1445.
Sincerely, IRAJ Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL4 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEicb Resource RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMDiabloCanyon Resource RidsOgcRp Resource RidsRgn4MailCenter Resource ADAMS Accession No. ML101130176 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DE/EICB/BC NRR/LPL4/BC NRR/LPL4/PM I NAME AWang JBurkhardt WKemper MMarkley CFLyon for AWang DATE 4/28/10 4/28/10 5/3110 5/4/10 5/5110 OFFICIAL RECORD