Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML0330203802003-10-28028 October 2003 Request for Withholding Information from Public Disclosure, WCAP-11082, Revision 6, (CAW-03-1609) (Tac Nos. MC0893 and MC0894) Project stage: Withholding Request Acceptance ML0432304352004-11-17017 November 2004 Request for Withholding Information from Public Disclosure (CAW-04-1804, CAW-04-1846, and CAW-04-1881) (Tac Nos. MC0893 and MC0894) Project stage: Withholding Request Acceptance ML0433803172004-12-0202 December 2004 TS Pages- Issuance of Amendment Revised Techical Specifications 3.3.1, Reactor Trip System Instrumentation and 3.3.2, Engineered Safety Feature Actuation System Instrumentation Project stage: Approval ML0430902372004-12-0202 December 2004 Issuance of Amendment Revised Technical Specifications 3.3.1, RTS Instrumentation, and 3.3.2 ESFAS Instrumentation Project stage: Approval 2004-11-17
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000275/20230042024-02-0909 February 2024 Integrated Inspection Report 05000275/2023004 and 05000323/2023004 ML24002B1802024-01-29029 January 2024 LRA Audit Plan DCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel ML24018A0152024-01-29029 January 2024 License Renewal Application Review Schedule Letter ML24017A2492024-01-24024 January 2024 Letter to Neil Peyron, Chairman, Tule River Tribe, Re. Diablo Canyon ML24024A1752024-01-24024 January 2024 Letter to Tribal Council San Luis Obispo County Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24003A8902024-01-24024 January 2024 Letter to P. Gerfen - Diablo Canyon Notice of Intent to Conduct Scoping and Prepare an Environmental Impact Statement ML24012A1582024-01-24024 January 2024 Letter to Hon. Violet Sage Walker, Chairwoman Northern Chumash Tribal Council on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0062024-01-24024 January 2024 Achp Scoping Letter for Diablo Canyon License Renewal ML24012A0552024-01-24024 January 2024 Letter to J. Polanco, Shpo, on Request to Initiate Section 106 Consultation and Scooping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1562024-01-24024 January 2024 Letter to Hon. Gabe Frausto, Coastal Band of Chumash Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1652024-01-24024 January 2024 Letter to Hon. Mona Olivas Tucker, Yak Tityu Tityu Yak Tilhini Northern Chumas Indians on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24024A1612024-01-24024 January 2024 Letter Hon. Gary Pierce, Salian Tribe of Monterey and San Luis Obispo Counties on Section 106 Consultation and Scoping Process for the Environmental Review of Diablo Canyon Nuclear Plant, Unit 1 and 2 License Renewal Application ML24012A0362024-01-24024 January 2024 Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000275/20230112024-01-12012 January 2024 NRC License Renewal Phase 1 Inspection Report 05000275/2023011 DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel ML23326A0122023-12-21021 December 2023 12-21-23 Letter to the Honorable Byron Donalds from Chair Hanson Responds to Letter Regarding 2.206 Petition to Close Diablo Canyon Nuclear Power Plant, Unit 1 ML23341A0042023-12-19019 December 2023 LRA Acceptance Letter ML23352A2342023-12-18018 December 2023 Notification of Age-Related Degradation Inspection (05000275/2024014 and 05000323/2024014) and Request for Information DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update ML23355A0952023-12-0808 December 2023 License Renewal Application Online Reference Portal DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 ML23291A2702023-11-28028 November 2023 Letter to Nakia Zavalla, Shpo, the Santa Ynez Band of Chumash Indians; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23320A2442023-11-28028 November 2023 Letter to Kerri Vera, Director of Department of Environmental Protection, Tule River Tribe; Re., Diablo Canyon ISFSI Initiating Section 106 Consultation ML23325A1382023-11-27027 November 2023 ISFSI Tribal Letter to San Luis Obispo County Chumash Indians ML23325A1322023-11-27027 November 2023 ISFSI Tribal Letter to Salian Tribe of Montgomery, San Luis Obispo ML23325A1332023-11-27027 November 2023 ISFSI Tribal Letter to Yak Tityu Tityu Northern Chumash Indians ML23307A0062023-11-27027 November 2023 ISFSI Tribal Letter to Northern Chumash Tribal Council ML24003A7242023-11-27027 November 2023 Independent Safety Committee; Diab Lo Canyon Nuclear Power Plant Operations, Thirty-Third Annual Report on the Safety ML23325A1292023-11-27027 November 2023 ISFSI Tribal Letter to Coastal Band of Chumash ML23320A1502023-11-17017 November 2023 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, & Opportunity for Hearing (Exigent Circumstances) (EPID L-2023-LLA-0155) - LTR DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System ML23296A0982023-11-15015 November 2023 Notification and Request for Consultation Regarding Pacific Gas and Electric Diablo Canyon Independent Spent Fuel Storage Installation Material License Renewal Request (Docket Number: 72-26) DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System ML23293A1052023-11-14014 November 2023 Receipt and Availability of License Renewal Application IR 05000275/20230032023-11-13013 November 2023 Integrated Inspection Report 05000275/2023003 and 05000323/2023003 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application ML23318A2102023-10-31031 October 2023 Independent Safety Committee; Thirty-Third Annual Report on the Safety of Diablo Canyon Nuclear Power Plant Operations DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System IR 05000275/20240152023-10-10010 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (050002752024015 and 050003232024015) 2024-02-09
[Table view] Category:Proprietary Information Review
MONTHYEARDCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure ML16113A2512016-05-0505 May 2016 Request for Withholding Information from Public Disclosure, 3/12/14 and 4/9/14 Affidavits Executed by B. Herschthal, Invensys/Schneider Electric Five Proprietary Documents ML16112A4052016-04-28028 April 2016 Request for Withholding Information from Public Disclosure, 4/25/13 Affidavit Executed by S. Roberts, CS Innovations, Five Proprietary Documents ML16113A0092016-04-28028 April 2016 Request for Withholding Information from Public Disclosure, 12/20/12 and 2/26/13 Affidavits Executed by R. Shaffer, Invensys Operations Management Six Proprietary Documents ML16110A4032016-04-28028 April 2016 Request for Withholding Information from Public Disclosure, 1/30/13, 1/30/13, and 1/28/13 Affidavits Executed by J. Gresham, Westinghouse WCAP-17696-P, WCAP-17706-P, and LTR-RAM-I-13-002-P ML16056A5272016-03-0707 March 2016 Request for Withholding Information from Public Disclosure, 2/11/16 Affidavit Executed by B. Haynes, Invensys/Schneider Electric; 17 Proprietary Documents ML16032A4222016-02-24024 February 2016 Request for Withholding Information from Public Disclosure, 10/27/15 Affidavit Executed by J. Gresham, Westinghouse Electric Company; 17 Proprietary Documents ML16033A0282016-02-24024 February 2016 Request for Withholding Information from Public Disclosure, 1/5/16 Affidavit Executed by J. Gresham, Westinghouse Electric Company; 1 Proprietary Document (Letter from Vendor) ML15257A2482015-09-18018 September 2015 Request for Withholding Information from Public Disclosure - 7/29/15 Affidavit Executed by J. Gresham, Westinghouse Information to Support Relief Request from Inspection Requirements for Main Steam Nozzle Inner Radius ML15201A0742015-08-25025 August 2015 Request for Withholding Information from Public Disclosure - 6/25/15 Affidavit Executed by H. Sepp, Westinghouse Electric Company LLC, Licensee'S 7/8/15 Responses to Request for Additional Information ML15044A2772015-03-0909 March 2015 Request for Withholding Information from Public Disclosure, 1/15/15 Affidavit Executed by J. Gresham, Westinghouse Electric Company; Four Proprietary Documents ML14309A1562014-11-12012 November 2014 Request for Withholding Information from Public Disclosure - 7/29/2014 Affidavit Executed by James Gresham, Westinghouse SFAD-14-79, Attachment 1 ML13295A6242013-11-25025 November 2013 Request for Withholding Information from Public Disclosure, 8/22/13 Affidavit Executed by J. Gresham, Westinghouse Electric Company; Five Proprietary Documents ML13170A1962013-07-11011 July 2013 Request for Withholding Information from Public Disclosure - 3/5/2013 Affidavit Executed by G. Elliott, Areva Np Inc., Regarding Areva Calculations Provided for Relief Request REP-1 U2, Revision 2 ML13028A5052013-02-28028 February 2013 Request for Withholding Information from Public Disclosure, 11/26/12 Affidavit Executed by S. Roberts, CS Innovations, LLC, Five Proprietary Documents ML13025A3482013-02-28028 February 2013 Request for Withholding Information from Public Disclosure, 11/1/12 Affidavit Executed by R. Shaffer, Invensys Operations Management, Nine Invensys Documents Via 11/27/12 Letters ML12228A4042012-10-10010 October 2012 Request for Withholding Information from Public Disclosure, 7/23/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, for 993754-1-802 R2, 993754-1-813 R1, and 993754-1-906 R1 ML12178A1152012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by J. Gresham, Westinghouse on 1 Proprietary Document ML12177A2312012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by Scott Roberts, CS Innovations, LLC on 10 Proprietary Documents ML12142A1112012-05-24024 May 2012 Request for Withholding Information from Public Disclosure, 4/10/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, Maximum Tsap Scan Time ML1025707772010-10-25025 October 2010 Request for Withholding Information from Public Disclosure - 6/14/2010 Affidavit Executed by J. Gresham, Westinghouse ML1028004462010-10-20020 October 2010 Withholding from Public Disclosure, Diablo Canyon Power Plant Topical Report, Process Protection System Replacement Diversity & Defense-in-Depth Assessment, Revision 1 ML1025605302010-10-0808 October 2010 Request for Withholding Information from Public Disclosure - 8/12/10 Affidavit Executed by J. Becker, PG&E ML1011301762010-05-0505 May 2010 Request for Withholding Information from Public Disclosure ML0733402552007-12-13013 December 2007 Request for Withholding Information from Public Disclosure 2.390 Finding for 8/9/07 Letter (Tac Nos, MD3992 and MD3993) ML0705700132007-03-0101 March 2007 Westinghouse Electric Company Request for Withholding Information from Public Disclosure (CAW-06-2224) ML0609702712006-04-0404 April 2006 Withholding from Public Disclosure, CAW-06-2112, MD0385 & MD0386 ML0508302722005-03-17017 March 2005 Request for Withholding Information from Public Disclosure (Tac. MC5143 and MC5144) ML0432704352004-11-19019 November 2004 Withholding from Public Disclosure, WCAP-14529-P, Revision 0 (CAW-04-1895) ML0432304352004-11-17017 November 2004 Request for Withholding Information from Public Disclosure (CAW-04-1804, CAW-04-1846, and CAW-04-1881) (Tac Nos. MC0893 and MC0894) ML0420201832004-07-19019 July 2004 7/19/04 Diablo Canyon - Requests for Withholding Information from Public Disclosure (CAW-04-1853). (Tacs. MC1210 and MC1211) ML0411702852004-04-26026 April 2004 Diablo Canyon, Request for Withholding Information from Public Disclosure (CAW-03-1747) ML0411200492004-04-19019 April 2004 4/19/04, Request for Withholding Information from Public Disclosure (CAW-03-1741) ML0333809922003-12-0202 December 2003 Request for Withholding Information from Public Disclosure (CAW-03-1680) (Tac. MC1210 and MC1211) ML0330203802003-10-28028 October 2003 Request for Withholding Information from Public Disclosure, WCAP-11082, Revision 6, (CAW-03-1609) (Tac Nos. MC0893 and MC0894) ML0300804142003-01-0808 January 2003 Withholding from Public Disclosure, WCAP-15113, RCS Flow Measurement Using Elbow Tap Methodology, MB6760 & MB6761 2023-07-27
[Table view] |
Text
November 17, 2004 Mr. James A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company P.O. Box 355 Pittsburgh, PA 15230-0355
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (CAW-04-1804, CAW-04-1846, AND CAW-04-1881) (TAC NOS. MC0893 AND MC0894)
Dear Mr. Gresham:
By letters dated April 23, 2004, June 4, 1004, and August 30, 2004, Pacific Gas and Electric Company submitted affidavits dated March 19, 2004, and June 1, 2004, respectively, executed by you, and August 26, 2004, respectively, executed by J. S. Galembush, Supervisory Engineer, Regulatory Compliance and Plant Licensing, requesting that information in the three documents all entitled, "PG&E Response to NRC Request for Additional Information Regarding License Amendment Request 03-12, Revision to Technical Specifications 3.3.1, 'RTS Instrumentation,' and 3.3.2, 'ESFAS Instrumentation'," be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390.
A nonproprietary copy of the documents was not provided for placement in the Nuclear Regulatory Commission's (NRC's) Public Document Room and for addition to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavits stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public.
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
J. Gresham We have reviewed your applications and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the information in the three documents entitled, "PG&E Response to NRC Request for Additional Information Regarding License Amendment Request 03-12, Revision to Technical Specifications 3.3.1, 'RTS Instrumentation,' and 3.3.2, 'ESFAS Instrumentation'," marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-8439.
Sincerely,
/RA/
Girija Shukla, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 cc: See next page
J. Gresham We have reviewed your applications and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the information in the three documents entitled, "PG&E Response to NRC Request for Additional Information Regarding License Amendment Request 03-12, Revision to Technical Specifications 3.3.1, 'RTS Instrumentation,' and 3.3.2, 'ESFAS Instrumentation'," marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at (301) 415-8439.
Sincerely,
/RA/
Girija Shukla, Project Manager, Section 2 Project Directorate IV Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323 DISTRIBUTION:
PUBLIC cc: See next page PDIV-2 Reading RidsNrrDlpmPdiv (HBerkow)
RidsNrrDlpmPdiv2 (RGramm)
RidsNrrPMGShukla RidsNrrLAEPeyton RidsOgcRp JUhle ADAMS ACCESSION NO.: ML043230435 NRR-084 OFFICE PDIV-2/PM PDIV-2/LA SXRB:SC/B PDIV-2/SC NAME GShukla EPeyton:esp JUhle RGramm DATE 11/16/04 11/15/04 11/16/04 11/17/04 DOCUMENT NAME: E:\Filenet\ML043230435.wpd OFFICIAL RECORD COPY
Diablo Canyon Power Plant, Units 1 and 2 cc:
NRC Resident Inspector Richard F. Locke, Esq.
Diablo Canyon Power Plant Pacific Gas & Electric Company c/o U.S. Nuclear Regulatory Commission P.O. Box 7442 P.O. Box 369 San Francisco, CA 94120 Avila Beach, CA 93424 Mr. David H. Oatley, Vice President Sierra Club San Lucia Chapter and General Manager c/o Henriette Groot Diablo Canyon Power Plant 1000 Montecito Road P.O. Box 56 Cayucos, CA 93430 Avila Beach, CA 93424 Ms. Nancy Culver City Editor San Luis Obispo The Tribune Mothers for Peace 3825 South Higuera Street P.O. Box 164 P.O. Box 112 Pismo Beach, CA 93448 San Luis Obispo, CA 93406-0112 Chairman Mr. Ed Bailey, Chief San Luis Obispo County Board of Radiologic Health Branch Supervisors State Department of Health Services Room 370 P.O. Box 997414 (MS 7610)
County Government Center Sacramento, CA 95899-7414 San Luis Obispo, CA 93408 Mr. James D. Boyd, Commissioner Mr. Truman Burns California Energy Commission Mr. Robert Kinosian 1516 Ninth Street (MS 31)
California Public Utilities Commission Sacramento, CA 95814 505 Van Ness, Room 4102 San Francisco, CA 94102 Mr. James R. Becker, Vice President Diablo Canyon Operations Diablo Canyon Independent Safety and Station Director Committee Diablo Canyon Power Plant ATTN: Robert R. Wellington, Esq. P.O. Box 3 Legal Counsel Avila Beach, CA 93424 857 Cass Street, Suite D Monterey, CA 93940 Mr. Gregory M. Rueger Senior Vice President, Generation and Regional Administrator, Region IV Chief Nuclear Officer U.S. Nuclear Regulatory Commission Pacific Gas and Electric Company Harris Tower & Pavillion Diablo Canyon Power Plant 611 Ryan Plaza Drive, Suite 400 P.O. Box 3 Arlington, TX 76011-8064 Avila Beach, CA 93424