Category:Letter
MONTHYEARML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 2024-09-09
[Table view] Category:Proprietary Information Review
MONTHYEARDCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure ML16113A2512016-05-0505 May 2016 Request for Withholding Information from Public Disclosure, 3/12/14 and 4/9/14 Affidavits Executed by B. Herschthal, Invensys/Schneider Electric Five Proprietary Documents ML16112A4052016-04-28028 April 2016 Request for Withholding Information from Public Disclosure, 4/25/13 Affidavit Executed by S. Roberts, CS Innovations, Five Proprietary Documents ML16113A0092016-04-28028 April 2016 Request for Withholding Information from Public Disclosure, 12/20/12 and 2/26/13 Affidavits Executed by R. Shaffer, Invensys Operations Management Six Proprietary Documents ML16110A4032016-04-28028 April 2016 Request for Withholding Information from Public Disclosure, 1/30/13, 1/30/13, and 1/28/13 Affidavits Executed by J. Gresham, Westinghouse WCAP-17696-P, WCAP-17706-P, and LTR-RAM-I-13-002-P ML16056A5272016-03-0707 March 2016 Request for Withholding Information from Public Disclosure, 2/11/16 Affidavit Executed by B. Haynes, Invensys/Schneider Electric; 17 Proprietary Documents ML16032A4222016-02-24024 February 2016 Request for Withholding Information from Public Disclosure, 10/27/15 Affidavit Executed by J. Gresham, Westinghouse Electric Company; 17 Proprietary Documents ML16033A0282016-02-24024 February 2016 Request for Withholding Information from Public Disclosure, 1/5/16 Affidavit Executed by J. Gresham, Westinghouse Electric Company; 1 Proprietary Document (Letter from Vendor) ML15257A2482015-09-18018 September 2015 Request for Withholding Information from Public Disclosure - 7/29/15 Affidavit Executed by J. Gresham, Westinghouse Information to Support Relief Request from Inspection Requirements for Main Steam Nozzle Inner Radius ML15201A0742015-08-25025 August 2015 Request for Withholding Information from Public Disclosure - 6/25/15 Affidavit Executed by H. Sepp, Westinghouse Electric Company LLC, Licensee'S 7/8/15 Responses to Request for Additional Information ML15044A2772015-03-0909 March 2015 Request for Withholding Information from Public Disclosure, 1/15/15 Affidavit Executed by J. Gresham, Westinghouse Electric Company; Four Proprietary Documents ML14309A1562014-11-12012 November 2014 Request for Withholding Information from Public Disclosure - 7/29/2014 Affidavit Executed by James Gresham, Westinghouse SFAD-14-79, Attachment 1 ML13295A6242013-11-25025 November 2013 Request for Withholding Information from Public Disclosure, 8/22/13 Affidavit Executed by J. Gresham, Westinghouse Electric Company; Five Proprietary Documents ML13170A1962013-07-11011 July 2013 Request for Withholding Information from Public Disclosure - 3/5/2013 Affidavit Executed by G. Elliott, Areva Np Inc., Regarding Areva Calculations Provided for Relief Request REP-1 U2, Revision 2 ML13028A5052013-02-28028 February 2013 Request for Withholding Information from Public Disclosure, 11/26/12 Affidavit Executed by S. Roberts, CS Innovations, LLC, Five Proprietary Documents ML13025A3482013-02-28028 February 2013 Request for Withholding Information from Public Disclosure, 11/1/12 Affidavit Executed by R. Shaffer, Invensys Operations Management, Nine Invensys Documents Via 11/27/12 Letters ML12228A4042012-10-10010 October 2012 Request for Withholding Information from Public Disclosure, 7/23/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, for 993754-1-802 R2, 993754-1-813 R1, and 993754-1-906 R1 ML12178A1152012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by J. Gresham, Westinghouse on 1 Proprietary Document ML12177A2312012-07-24024 July 2012 Request for Withholding Information from Public Disclosure, 5/29/2012 Affidavit Executed by Scott Roberts, CS Innovations, LLC on 10 Proprietary Documents ML12142A1112012-05-24024 May 2012 Request for Withholding Information from Public Disclosure, 4/10/2012 Affidavit Executed by R. Shaffer, Invensys Operations Management, Maximum Tsap Scan Time ML1025707772010-10-25025 October 2010 Request for Withholding Information from Public Disclosure - 6/14/2010 Affidavit Executed by J. Gresham, Westinghouse ML1028004462010-10-20020 October 2010 Withholding from Public Disclosure, Diablo Canyon Power Plant Topical Report, Process Protection System Replacement Diversity & Defense-in-Depth Assessment, Revision 1 ML1025605302010-10-0808 October 2010 Request for Withholding Information from Public Disclosure - 8/12/10 Affidavit Executed by J. Becker, PG&E ML1011301762010-05-0505 May 2010 Request for Withholding Information from Public Disclosure ML0733402552007-12-13013 December 2007 Request for Withholding Information from Public Disclosure 2.390 Finding for 8/9/07 Letter (Tac Nos, MD3992 and MD3993) ML0705700132007-03-0101 March 2007 Westinghouse Electric Company Request for Withholding Information from Public Disclosure (CAW-06-2224) ML0609702712006-04-0404 April 2006 Withholding from Public Disclosure, CAW-06-2112, MD0385 & MD0386 ML0508302722005-03-17017 March 2005 Request for Withholding Information from Public Disclosure (Tac. MC5143 and MC5144) ML0432704352004-11-19019 November 2004 Withholding from Public Disclosure, WCAP-14529-P, Revision 0 (CAW-04-1895) ML0432304352004-11-17017 November 2004 Request for Withholding Information from Public Disclosure (CAW-04-1804, CAW-04-1846, and CAW-04-1881) (Tac Nos. MC0893 and MC0894) ML0420201832004-07-19019 July 2004 7/19/04 Diablo Canyon - Requests for Withholding Information from Public Disclosure (CAW-04-1853). (Tacs. MC1210 and MC1211) ML0411702852004-04-26026 April 2004 Diablo Canyon, Request for Withholding Information from Public Disclosure (CAW-03-1747) ML0411200492004-04-19019 April 2004 4/19/04, Request for Withholding Information from Public Disclosure (CAW-03-1741) ML0333809922003-12-0202 December 2003 Request for Withholding Information from Public Disclosure (CAW-03-1680) (Tac. MC1210 and MC1211) ML0330203802003-10-28028 October 2003 Request for Withholding Information from Public Disclosure, WCAP-11082, Revision 6, (CAW-03-1609) (Tac Nos. MC0893 and MC0894) ML0300804142003-01-0808 January 2003 Withholding from Public Disclosure, WCAP-15113, RCS Flow Measurement Using Elbow Tap Methodology, MB6760 & MB6761 2023-07-27
[Table view] |