ML11115A140: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 04/25/2011
| issue date = 04/25/2011
| title = Acceptance Review of Use of Weld Overlays as an Alternative Repair Technique for Steam Generator Hot Leg Nozzles (N1-I4-CMP-001)
| title = Acceptance Review of Use of Weld Overlays as an Alternative Repair Technique for Steam Generator Hot Leg Nozzles (N1-I4-CMP-001)
| author name = Wiebe J S
| author name = Wiebe J
| author affiliation = NRC/NRR/DORL/LPLII-1
| author affiliation = NRC/NRR/DORL/LPLII-1
| addressee name = Heacock D
| addressee name = Heacock D

Revision as of 21:20, 10 July 2019

Acceptance Review of Use of Weld Overlays as an Alternative Repair Technique for Steam Generator Hot Leg Nozzles (N1-I4-CMP-001)
ML11115A140
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/25/2011
From: Joel Wiebe
Plant Licensing Branch II
To: Heacock D
Virginia Electric & Power Co (VEPCO)
References
Download: ML11115A140 (2)


Text

1 NRR-PMDAPEm Resource From: Wiebe, Joel Sent: Monday, April 25, 2011 1:41 PM To: David.Heacock@dom.com Cc: Tom Shaub

Subject:

North Anna Power Station, Unit No. 1, Accept ance Review of Use of Weld Overlays as an Alternative Repair Technique for Steam G enerator Hot Leg Nozzles (N1-I4-CMP-001)

Dear Mr. Heacock:

By letter dated March 30, 2011, Virginia Electric Power Company submitted a request for authorization to use an alternate repair technique for North Anna Power Station, Unit 1. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-6606.

Joel S. Wiebe, Sr. Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Hearing Identifier: NRR_PMDA Email Number: 11 Mail Envelope Properties (Joel.Wiebe@nrc.gov20110425134000)

Subject:

North Anna Power Station, Unit No. 1, Acceptance Review of Use of Weld Overlays as an Alternative Repair Technique for Steam Generator Hot Leg Nozzles (N1-I4-CMP-001) Sent Date: 4/25/2011 1:40:58 PM Received Date: 4/25/2011 1:40:00 PM From: Wiebe, Joel Created By: Joel.Wiebe@nrc.gov Recipients: "Tom Shaub" <tom.shaub@dom.com> Tracking Status: None "David.Heacock@dom.com" <David.Heacock@dom.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1740 4/25/2011 1:40:00 PM

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: