| title = Email from W. Kemper, NRR to D. Rahn, NRR North Anna Seismic Event - Questions Which Would Need to Be Responded to and Evaluated by the NRC Hq Staff
| title = Email from W. Kemper, NRR to D. Rahn, NRR North Anna Seismic Event - Questions Which Would Need to Be Responded to and Evaluated by the NRC Hq Staff
| author name = Kemper W E
| author name = Kemper W
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
| addressee name = Rahn D L
| addressee name = Rahn D
| addressee affiliation = NRC/NRR
| addressee affiliation = NRC/NRR
| docket = 05000338, 05000339
| docket = 05000338, 05000339

Revision as of 04:36, 29 June 2019

Email from W. Kemper, NRR to D. Rahn, NRR North Anna Seismic Event - Questions Which Would Need to Be Responded to and Evaluated by the NRC Hq Staff
ML12038A250
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/15/2011
From: Kemper W
Office of Nuclear Reactor Regulation
To: David Rahn
Office of Nuclear Reactor Regulation
References
FOIA/PA-2011-0357
Download: ML12038A250 (2)


Text

Roquecruz, Carla"/)-.Vi" It,, -ý J, I --. wtI..l I From: Kemper, William I 0 CM-Sent: Thursday, September 15, 2011 1:05 PM To: Rahn, David Cc: Wilson, George; Stattel, Richard; Carte, Norbert

Subject:

RE: North Anna Seismic Event-Questions Which Would need to be responded to and evaluated by the NRC HQ Staff Hi Dave, I have been out of the office for a few days and just saw this message. My recommendation would be to have the licensee verify the RPS and ESFAS channel calibration is within acceptable limits, in addition to a functional checks. This would be equivalent to their refueling calibration surveillance, and perhaps they could satisfy this action by performing calibrations on at least two channels, and if necessary, based on the results of the channels calibrated, calibrate the other two channels of RPS and ESFAS-only if needed. Hope this helps.Thanks, Bill Kemper, EICB/DE/NRR 301-415-0927 (office)(6) icell, From: Rahn, David Sent: Tuesday, September 13, 2011 2:08 PM To: Alvarado, Rossnyev; Chung, Pong; Darbali, Samir; Dittman, Bernard; Mossman, Timothy; Singh, Gursharan; Stattel, Richard; Wyman, Stephen Cc: Carte, Norbert; Kemper, William; Wilson, George

Subject:

North Anna Seismic Event--Questions Which Would need to be responded to and evaluated by the NRC HQ Staff Hi EICB Team: Per our conversation this morning at the branch meeting, please provide a list of questions you believe we would need to follow up on with the licensee from a long-term I&C Design standpoint in order to arrive at a reasonable assurance determination that it is OK to restart one of the units at North Anna. Please keep in mind that there is already an Augmented Inspection Team at North Anna site composed of personnel from our Region II Office, who are looking at issues related to the actions taken by the licensee immediately upon experiencing the earthquake.

Also keep in mind that the Licensee has already informed us that they intend to perform functional testing of all Reactor Trip system and ESFAS system initiation channels prior to start-up.In addition to understanding the earthquake's impact on IC equipment functionality, there are issues we discussed this morning pertaining to the operability of the seismic monitoring equipment, which need to be addressed.

Information in this record was deleted in accordance with tpe Freedom of Information h Act, exemptions

, 1`01A. .,LLI From, IMeena Khanna's meeting announcement for a meeting to be held on Wednesday, Sept 14, 2011 from 1: i tn until.2:00 pm."I request that all of you please try to attend this meeting, as we need to meet to address path forward with regards to this issue. I will bring a copy of the draft action plan and will lay out expectations, guidance, schedules, etc. PIs note that this is a high priority initiative, in that it involves plant restart.We are looking to issue questions starting this week, so I really would like for each branch, if not already done, to pls develop questions regarding short term (prior to plant restart) and long term (post restart) licensee's actions." Thanks, Dave David L. Rahn, P.E.Senior Electronics Engineer, Instrumentation and Controls Branch Mail Stop 09-E3 Division of Engineering Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Office: (301) 415-1315 Fax: (301) 415-2444 2