Line 3: |
Line 3: |
| | issue date = 07/23/2012 | | | issue date = 07/23/2012 |
| | title = IR 05000361-12-008, 05000362-12-008; 05/21/ 2012 - 06/8/2012; San Onofre Nuclear Generating Station Biennial Baseline Inspection of the Identification and Resolution of Problems | | | title = IR 05000361-12-008, 05000362-12-008; 05/21/ 2012 - 06/8/2012; San Onofre Nuclear Generating Station Biennial Baseline Inspection of the Identification and Resolution of Problems |
| | author name = Powers D A | | | author name = Powers D |
| | author affiliation = NRC/RGN-IV/DRS | | | author affiliation = NRC/RGN-IV/DRS |
| | addressee name = Dietrich P | | | addressee name = Dietrich P |
Line 9: |
Line 9: |
| | docket = 05000361, 05000362 | | | docket = 05000361, 05000362 |
| | license number = NPF-010, NPF-015 | | | license number = NPF-010, NPF-015 |
| | contact person = vlm/Powers D A | | | contact person = vlm/Powers D |
| | document report number = IR-12-008 | | | document report number = IR-12-008 |
| | document type = Inspection Report, Letter | | | document type = Inspection Report, Letter |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:July 23, 2012 |
| [[Issue date::July 23, 2012]]
| |
|
| |
|
| Mr. Peter Dietrich Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128
| | ==SUBJECT:== |
| | | SAN ONOFRE NUCLEAR GENERATING STATION - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000361/2012008 AND 05000362/2012008 |
| SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000361/2012008 AND 05000362/2012008 | |
|
| |
|
| ==Dear Mr. Dietrich:== | | ==Dear Mr. Dietrich:== |
Line 30: |
Line 28: |
| This inspection was an examination of activities conducted under your license as they relate to problem identification and resolution and compliance with the Commission's rules and regulations and the conditions of your license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. | | This inspection was an examination of activities conducted under your license as they relate to problem identification and resolution and compliance with the Commission's rules and regulations and the conditions of your license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel. |
|
| |
|
| Based on the inspection sample, the inspection team concluded that the implementation of the corrective action program and overall performance related to identifying, evaluating, and resolving problems at San Onofre Nuclear Generating Station was effective. Licensee identified problems were entered into the corrective action program at a low threshold. Problems were effectively prioritized and evaluated commensurate with the safety significance. Corrective actions were effectively implemented in a timely manner commensurate with their importance to safety and addressed the identified causes of problems. Lessons learned from industry-operating experience were effectively reviewed and applied, when appropriate. Audits and self-assessments were effectively used to identify problems and appropriate actions. Finally, the team verified that the licensee had established a safety-conscious work environment where workers felt free to raise safety concerns without fear of retaliation. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | Based on the inspection sample, the inspection team concluded that the implementation of the corrective action program and overall performance related to identifying, evaluating, and resolving problems at San Onofre Nuclear Generating Station was effective. Licensee identified problems were entered into the corrective action program at a low threshold. Problems were effectively prioritized and evaluated commensurate with the safety significance. Corrective actions were effectively implemented in a timely manner commensurate with their importance to safety and addressed the identified causes of problems. Lessons learned from industry-operating experience were effectively reviewed and applied, when appropriate. Audits and self-assessments were effectively used to identify problems and appropriate actions. Finally, the team verified that the licensee had established a safety-conscious work environment where workers felt free to raise safety concerns without fear of retaliation. |
|
| |
|
| Sincerely,/RA/
| | UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| Dr. Dale A. Powers, Acting Chief Technical Support Branch Docket Nos.: 05000361, 05000362 License Nos: NPF-10, NPF-15
| |
|
| |
|
| ===Enclosure:===
| | Sincerely, |
| 1. Inspection Report 05000361/2012008 and 05000362/2012008 w/ | | /RA/ |
| | Dr. Dale A. Powers, Acting Chief Technical Support Branch Docket Nos.: 05000361, 05000362 License Nos: NPF-10, NPF-15 Enclosure: 1. Inspection Report 05000361/2012008 and 05000362/2012008 w/ Attachment: Supplemental Information |
|
| |
|
| ===Attachment:===
| | Electronic Distribution to SONGS |
| Supplemental Information
| |
|
| |
|
| Electronic Distribution to SONGS
| | ML12205A166 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials HAF Publicly Avail. Yes No Sensitive Yes No Sens. Type Initials HAF SRI:DRS/TSB RI:DRS/EB1 RI:DRP/ANO OE:DRS/OB PE:DRP/PBD Acting C:DRS/TSB HAFreeman JDBraisted JRotton DGStrickland DDYou DAPowers /RA/ /E-Mail/ /E-mail/ /E-mail/ Per Telecon /RA/ 7/23/2012 7/23/2012 7/23/2012 7/23/2012 7/23/2012 7/23/2012 C:DRP/PBD Acting C:DRS/TSB RELantz DAPowers /NHT for/ /RA/ 7/23/2012 7/23/2012 |
| | - 1 - Enclosure OFFICIAL RECORD COPY U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 05000361, 05000362 License: NPF-10, NPF-15 Report: 05000361/2012008 and 05000362/2012008 Licensee: Southern California Edison Facility: San Onofre Nuclear Generating Station Location: 4 miles SE of San Clemente, California Dates: May 21 through June 8, 2012 Team Leader: Harry A. Freeman, Senior Reactor Inspector Inspectors: |
| | Dr. Jonathan D. Braisted, Reactor Inspector Jeff Rotton, Resident Inspector Duane G. Strickland, Operations Engineer David D. You, Project Engineer Approved By: Dr. Dale A. Powers, Acting Chief Technical Support Branch Division of Reactor Safety |
|
| |
|
| ML12205A166 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials HAF Publicly Avail. Yes No Sensitive Yes No Sens. Type Initials HAF SRI:DRS/TSB RI:DRS/EB1 RI:DRP/ANO OE:DRS/OB PE:DRP/PBD Acting C:DRS/TSB HAFreeman JDBraisted JRotton DGStrickland DDYou DAPowers /RA/ /E-Mail/ /E-mail/ /E-mail/ Per Telecon /RA/ 7/23/2012 7/23/2012 7/23/2012 7/23/2012 7/23/2012 7/23/2012 C:DRP/PBD Acting C:DRS/TSB RELantz DAPowers /NHT for/ /RA/ 7/23/2012 7/23/2012 Enclosure OFFICIAL RECORD COPY U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 05000361, 05000362 License: NPF-10, NPF-15 Report: 05000361/2012008 and 05000362/2012008 Licensee: Southern California Edison Facility: San Onofre Nuclear Generating Station Location: 4 miles SE of San Clemente, California Dates: May 21 through June 8, 2012 Team Leader: Harry A. Freeman, Senior Reactor Inspector Inspectors:
| | - 2 - Enclosure |
| Dr. Jonathan D. Braisted, Reactor Inspector Jeff Rotton, Resident Inspector Duane G. Strickland, Operations Engineer David D. You, Project Engineer Approved By: Dr. Dale A. Powers, Acting Chief Technical Support Branch Division of Reactor Safety Enclosure
| |
|
| |
|
| =SUMMARY OF FINDINGS= | | =SUMMARY OF FINDINGS= |
Line 181: |
Line 179: |
|
| |
|
| ===Closed=== | | ===Closed=== |
| : None
| | None |
| ===Discussed=== | | ===Discussed=== |
| None | | None |
|
| |
|
| ==LIST OF DOCUMENTS REVIEWED== | | ==LIST OF DOCUMENTS REVIEWED== |
| ===Procedures===
| |
| : NUMBER TITLE REVISION SO123-IV-3.5 Security Work Hours Management 12 SO123-XV-1.20 Seismic Controls 4 SO123-XV-50 Corrective Action Program 25 SO123-XV-50.CAP-1 Writing Nuclear Notifications for Problem Identification and Resolution
| |
| : SO123-XV-50.CAP-2 SONGS Nuclear Notification Screening 12 SO123-XV-50.CAP-3 Corrective Action Program Evaluations and Action Plans 16 SO123-XV-50.CAP-4 Implementing Corrective Actions
| |
| : SO123-XV-50.CAP-5 Corrective Action Effectiveness
| |
| : SO123-XV-52 Operability Determinations and Functionality Assessments
| |
| : SO123-XV-52.1 Operability Determination and Oversight 4 SO123-XV-6 SONGS Behavorial Observation Program 19 SO123-XV-6.1 SONGS Fatigue Management 4 SO123-XV-6.2 Work Hour Controls 5 SO123-XX-5 Work Clearance Application / Work Clearance Document / Work Authorization Record (WAR)
| |
| : SO123-XX-6 Operator Work Around Program
| |
| : SO123-XXIX-2.16 Nuclear Organization M&CS, Attachment 3, MPR Task Codes
| |
| : SO23-3-3.23 Diesel Generator Monthly and Semi-Annual Testing 59 SO23-ODP-1 Operability Determination Program 1 SO23-XV-4.13 Control of Work and Storage Areas within the Protected Area
| |
| ===Documents===
| |
| : Number Title Revision/Date
| |
| : FSAR 8.2.2.1.1 Availability Considerations for SCE System April 2009
| |
| : SOB-216 System Operating Bulletin No. 216 April 26, 2006
| |
| : Evaluations Number Title Revision/Date
| |
| : ACE 201181704 Operation of the RWST Purification & Recirculation lineup is not supported by SONGS Design Basis September 30, 2010
| |
| : ACE 200638791 Letdown Control Valve 3LV0110B Failed to Limit Letdown Flow During Power Reduction Transient January 26, 2011
| |
| : ACE 201572878 Submerged Perimeter Paging Cables August 26, 2011
| |
| : ACE 201010231 Non-Cited Violation For Less Than Adequate Response To Westinghouse Nuclear Safety Advisory Letter (NSAL) 09-8
| |
| : ACE 201393414 Green NCV - Seasonal Readiness Program April 28, 2011
| |
| : ACE 201448584 Auxiliary Feedwater Pipe Trench Drainage June 14, 2011
| |
| : ACE 201577458 3K006 Speed Swings September 22, 2011
| |
| : ACE 201299452 Missed Tech Spec SDM Surveillance March 9, 2011
| |
| : ACE 201286253 Investigation of U3C15 Transformer Configuration March 4, 2011
| |
| : ACE 200895372 Unplanned Unit 2 Power Reduction to Remove Shells from Condenser Waterboxes December 30, 2010
| |
| : DCE 201165132 HPSI 2FT0321-1 Failed to Fill and Vent During Surveillance January 12, 2011
| |
| : DCE 201606472 Lack of Acceptance Criteria for Safety Injection Tank Leakage in Operations Procedure October 3, 2011
| |
| : DCE 201513478 Feeder Breaker over current trip set at 180 amps - Charging Pump Motors 2(3) P190, 2(3) P191 & 2(3)
| |
| : P192 July 19, 2011
| |
| : DCE 201287222 10
| |
| : CFR 50.59 Issue Resolution (DCE) February 23, 2011
| |
| : DCE 201205222 Potential Non Compliance with Regulatory Guide 1.75 December 22, 2010
| |
| : DCE 201638629 Technical Specification LCO 3.8.1, Condition "A" Not Met October 24, 2011
| |
| : CCE 201396878 Station Management expressed a concern that the Predictive Maintenance (PdM) Watchlist has more vibration identified items on the list than other stations
| |
| : Licensee Event Reports Number Title Revision/Date
| |
| : LER 3-2011-001 Missed Tech Spec SDM Surveillance March 26, 2011
| |
| : LER
| |
| : 2-2011-002 Dual Unit Automatic Trip on High Pressurizer Pressure Due to Grid Disturbance November 1, 2011
| |
| ===Condition Reports===
| |
| (Nuclear Notifications)
| |
| : 200721702
| |
| : 201328970
| |
| : 201434892
| |
| : 200638791
| |
| : 200950125
| |
| : 200973110
| |
| : 201092448
| |
| : 201122128
| |
| : 200982045
| |
| : 201940544
| |
| : 200987250
| |
| : 201577458
| |
| : 200758654
| |
| : 201373487
| |
| : 201577458
| |
| : 201025656
| |
| : 201799576
| |
| : 200961547
| |
| : 201877320
| |
| : 201878037
| |
| : 201042361
| |
| : 200804979
| |
| : 201835752
| |
| : 200728657
| |
| : 200926776
| |
| : 201047182
| |
| : 201047271
| |
| : 201116874
| |
| : 201057387
| |
| : 201061165
| |
| : 201061263
| |
| : 201063349
| |
| : 201063427
| |
| : 201065812
| |
| : 201077154
| |
| : 201133936
| |
| : 201135761
| |
| : 201443248
| |
| : 201620253
| |
| : 201287222
| |
| : 201135193
| |
| : 201959463
| |
| : 201866244
| |
| : 201448263
| |
| : 201482168
| |
| : 201138580
| |
| : 201126784
| |
| : 201048764
| |
| : 201149023
| |
| : 201163962
| |
| : 201165132
| |
| : 201205222
| |
| : 201097446
| |
| : 201111679
| |
| : 201262583
| |
| : 201181704
| |
| : 201698531
| |
| : 201464957
| |
| : 201285132
| |
| : 201711294
| |
| : 201217134
| |
| : 201988274
| |
| : 201999587
| |
| : 201258909
| |
| : 201287222
| |
| : 201232148
| |
| : 201296462
| |
| : 201212408
| |
| : 201199502
| |
| : 201299452
| |
| : 201239894
| |
| : 201160468
| |
| : 201175804
| |
| : 201185545
| |
| : 201176656
| |
| : 201284984
| |
| : 201284985
| |
| : 201279128
| |
| : 201241361
| |
| : 201072135
| |
| : 201284984
| |
| : 201284995
| |
| : 201284996
| |
| : 201284998
| |
| : 201296030
| |
| : 201317588
| |
| : 201465833
| |
| : 201367899
| |
| : 201355227
| |
| : 201467430
| |
| : 201325253
| |
| : 201279485
| |
| : 201396878
| |
| : 201410862
| |
| : 201338280
| |
| : 201393414
| |
| : 201448584
| |
| : 201016397
| |
| : 201446365
| |
| : 201599886
| |
| : 201442557
| |
| : 200989773
| |
| : 200977799
| |
| : 200974336
| |
| : 201010231
| |
| : 201462415
| |
| : 201498537
| |
| : 201506537
| |
| : 201506773
| |
| : 201506833
| |
| : 201467427
| |
| : 201466804
| |
| : 201477474
| |
| : 201469828
| |
| : 201467456
| |
| : 201480132
| |
| : 201495805
| |
| : 201492854
| |
| : 201487786
| |
| : 201596350
| |
| : 201506967
| |
| : 201510949
| |
| : 201512809
| |
| : 201535312
| |
| : 201572508
| |
| : 201507023
| |
| : 201892141
| |
| : 201892202
| |
| : 201892229
| |
| : 201892260
| |
| : 201513478
| |
| : 201266158
| |
| : 201764816
| |
| : 201728636
| |
| : 201274638
| |
| : 201546570
| |
| : 201550186
| |
| : 200887620
| |
| : 200869281
| |
| : 200887620
| |
| : 201572509
| |
| : 201033114
| |
| : 201033877
| |
| : 201572878
| |
| : 201606472
| |
| : 201593960
| |
| : 201805547
| |
| : 201799576
| |
| : 200871332
| |
| : 201823099
| |
| : 201604492
| |
| : 201651125
| |
| : 201669264
| |
| : 201638629
| |
| : 201562417
| |
| : 201636269
| |
| : 201638778
| |
| : 200954931
| |
| : 200959837
| |
| : 201656251
| |
| : 201640603
| |
| : 201638778
| |
| : 201323150
| |
| : 201405633
| |
| : 201405699
| |
| : 201644782
| |
| : 201591467
| |
| : 201581508
| |
| : 201508799
| |
| : 201412330
| |
| : 201669106
| |
| : 201711298
| |
| : 201711300
| |
| : 201711302
| |
| : 201711345
| |
| : 201679460
| |
| : 201673712
| |
| : 201664813
| |
| : 201656194
| |
| : 201607886
| |
| : 201682420
| |
| : 201552631
| |
| : 201659899
| |
| : 201698503
| |
| : 201747816
| |
| : 201711414
| |
| : 201711416
| |
| : 201676620
| |
| : 201713505
| |
| : 201654799
| |
| : 201818132
| |
| : 201899920
| |
| : 201215659
| |
| : 201234602
| |
| : 201247150
| |
| : 201851396
| |
| : 201997889
| |
| : 201929367
| |
| : 201933207
| |
| : 201933330
| |
| : 201878081
| |
| : 201891422
| |
| : 201891970
| |
| : 201879865
| |
| : 200738558
| |
| : 201892308
| |
| : 201892321
| |
| : 201892917
| |
| : 201893215
| |
| : 201893255
| |
| : 201893320
| |
| : 201894231
| |
| : 201896597
| |
| : 201897284
| |
| : 201897607
| |
| : 201899714
| |
| : 201901194
| |
| : 201901320
| |
| : 201902865
| |
| : 201902866
| |
| : 201903430
| |
| : 201903685
| |
| : 201905286
| |
| : 201905435
| |
| : 201905485
| |
| : 201906004
| |
| : 201908724
| |
| : 201908729
| |
| : 201909974
| |
| : 201912811
| |
| : 201917249
| |
| : 201917788
| |
| : 201922598
| |
| : 201928355
| |
| : 201921217
| |
| : 201933622
| |
| : 201934801
| |
| : 201937233
| |
| : 201937443
| |
| : 201938956
| |
| : 201940692
| |
| : 201942615
| |
| : 201945249
| |
| : 201945264
| |
| : 201946368
| |
| : 201949784
| |
| : 201949913
| |
| : 201980894
| |
| : 201967249
| |
| : 201958287
| |
| : Information Request January 26, 2012 Biennial Problem Identification and Resolution Inspection - San Onofre Nuclear Generating Station Inspection Report 2012008
| |
| : This inspection will cover the period from June 1, 2010, to March 25, 2012.
| |
| : All requested information should be limited to this period unless otherwise specified.
| |
| : To the extent possible, the requested information should be provided electronically in Adobe PDF or Microsoft Office format.
| |
| : Lists of documents should be provided in Microsoft Excel or a similar sortable format.
| |
| : A supplemental information request will likely be sent during the week of March 19, 2012.
| |
| : Please provide the following no later than February 17, 2012:
| |
| : 1. Document Lists Note: for these summary lists, please include the document/reference number, the document title or a description of the issue, initiation date, and current status.
| |
| : Please include long text descriptions of the issues.
| |
| a. Summary list of all corrective action documents related to significant conditions adverse to quality that were opened, closed, or evaluated during the period
| |
| b. Summary list of all corrective action documents related to conditions adverse to quality that were opened or closed during the period
| |
| c. Summary lists of all corrective action documents which were upgraded or downgraded in priority/significance during the period
| |
| d. Summary list of all corrective action documents that subsume or "roll up" one or more smaller issues for the period
| |
| e. Summary lists of operator workarounds, engineering review requests and/or operability evaluations, temporary modifications, and control room and safety system deficiencies opened, closed, or evaluated during the period
| |
| f. Summary list of plant safety issues raised or addressed by the Employee Concerns Program (or equivalent)
| |
| g. Summary list of all Apparent Cause Evaluations completed during the period
| |
| h. Summary list of all Root Cause Evaluations planned or in progress but not complete at the end of the period
| |
| : 2. Full Documents, with Attachments
| |
| a. Root Cause Evaluations completed during the period
| |
| b. Quality assurance audits performed during the period
| |
| c. All audits/surveillances performed during the period of the Corrective Action Program, of individual corrective actions, and of cause evaluations
| |
| d. Corrective action activity reports, functional area self-assessments, and non-NRC third party assessments completed during the period (do not include INPO assessments)
| |
| e. Corrective action documents generated during the period for the following:
| |
| i. NCV's and Violations issued to San Onofre
| |
|
| |
| ii. LER's issued by San Onofre
| |
| f. Corrective action documents generated for the following, if they were determined to be applicable to San Onofre (for those that were evaluated but determined not to be applicable, provide a summary list):
| |
| i. NRC Information Notices, Bulletins, and Generic Letters issued or evaluated during the period
| |
|
| |
| ii. Part 21 reports issued or evaluated during the period iii. Vendor safety information letters (or equivalent) issued or evaluated during the period iv. Other external events and/or Operating Experience evaluated for applicability during the period
| |
| g. Corrective action documents generated for the following:
| |
| i. Emergency planning drills and tabletop exercises performed during the period ii. Maintenance preventable functional failures which occurred or were evaluated during the period iii. Adverse trends in equipment, processes, procedures, or programs which were evaluated during the period iv. Action items generated or addressed by plant safety review committees during the period
| |
| : 3. Logs and Reports
| |
| a. Corrective action performance trending/tracking information generated during the period and broken down by functional organization
| |
| b. Corrective action effectiveness review reports generated during the period
| |
| c. Current system health reports or similar information
| |
| d. Radiation protection event logs during the period
| |
| e. Security event logs and security incidents during the period (sensitive information can be provided by hard copy during first week on site)
| |
| f. Employee Concern Program (or equivalent) logs (sensitive information can be provided by hard copy during first week on site)
| |
| g. List of Training deficiencies, requests for training improvements, and simulator deficiencies for the period
| |
| : 4. Procedures
| |
| a. Corrective action program procedures, to include initiation and evaluation procedures, operability determination procedures, apparent and root cause evaluation/determination procedures, and any other procedures which implement the corrective action program at San Onofre
| |
| b. Quality Assurance program procedures
| |
| c. Employee Concerns Program (or equivalent) procedures
| |
| d. Procedures which implement/maintain a Safety-Conscious Work Environment
| |
| : 5. Other a. List of risk significant components and systems
| |
|
| |
| b. Organization charts for plant staff and long-term/permanent contractors Note: "Corrective action documents" refers to condition reports, notifications, action requests, cause evaluations, and/or other similar documents, as applicable to San Onofre.
| |
| : As it becomes available, but no later than February 17, 2012, this information should be uploaded on the Certrec IMS website.
| |
| : When these documents have been compiled (and by February 17, 2012), please download these documents onto a CD or DVD and sent it via overnight carrier to:
| |
|
| |
|
| - 10 - Attachment Harry Freeman U.S. NRC Region
| |
| : IV 1600 E. Lamar Blvd. Arlington,
| |
| : TX 76011-4511
| |
| : Please note that the NRC is not able to accept electronic documents on thumb drives or other similar digital media.
| |
| : However, CDs and DVDs are acceptable.
| |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 IR 05000361/20240032024-05-20020 May 2024 – NRC Inspection Report 050-00361/2024-003 and 050-00362/2024-003 IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 IR 05000361/20220052022-11-17017 November 2022 – NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 IR 05000206/20214022022-03-24024 March 2022 Notice of Violation, NRC Inspection Report 05000206/2021402, 05000361/2021402, 05000362/2021402, and 07200041/2021401; and Investigation Report 4-2021-004- Public- Cover Letter IR 05000361/20220012022-03-14014 March 2022 NRC Inspection Report 05000361/2022-001; 05000362/2022-001 IR 05000361/20210042021-12-0303 December 2021 NRC Inspection Report 05000361/2021-004 and 05000362/2021-004 IR 05000361/20210032021-09-22022 September 2021 NRC Inspection Report 05000361/2021-003 and 05000362/2021-003 ML21200A0622021-07-20020 July 2021 Security Baseline Inspection Report 05000206/2021402, 05000361/2021402, 05000362/2021402, and 07200041/2021402 IR 05000361/20210022021-07-0606 July 2021 NRC Inspection Report 05000361/2021002 and 05000362/2021002 IR 05000361/20210012021-03-0303 March 2021 NRC Inspection Report 05000361/2021001 and 05000362/2021001 IR 05000361/20200042020-12-18018 December 2020 NRC Inspection Report 05000361/2020-004 and 05000362/2020-004 IR 05000361/20200032020-10-22022 October 2020 NRC Inspection Report 05000361/2020003 and 05000362/2020003 IR 05000206/20200072020-09-14014 September 2020 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2020007; 05000361/2020007; 05000362/2020007; and 07200041/2020003 IR 05000361/20204012020-08-0505 August 2020 Security Baseline Inspection Report 05000361/2020401 and 05000362/2020401 IR 05000206/20200062020-08-0404 August 2020 Southern California Edison Company, San Onofre Nuclear Generating Station Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2020006; 05000361/2020006; 05000362/2020006; and 07200041/2020002 IR 05000206/20200022020-07-20020 July 2020 NRC Inspection Report 05000206/2020-002, 05000361/2020-002, and 05000362/2020-002 IR 05000206/20200052020-04-28028 April 2020 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2020005; 05000361/2020005; 05000362/2020005; and 07200041/2020001 IR 05000361/20200012020-02-25025 February 2020 NRC Inspection Report 05000361/2020-001 and 05000362/2020-001 IR 05000206/20190042020-02-20020 February 2020 Independent Spent Fuel Storage Installation (ISFSI) - NRC Inspection Report 05000206/2019 004; 05000361/2019 007; 05000362/2019 007; and 07200054/2019-002 IR 05000361/20190062019-12-0909 December 2019 NRC Inspection Report 05000361/2019006 and 05000362/2019006 IR 05000206/20190032019-11-22022 November 2019 Independent Spent Fuel Storage Installation (ISFSI) Inspection Report 050-00206/2019-003, 050 00361/2019-005, 050-00362/2019-005, 072 00041/2019-001 IR 05000361/20190042019-09-25025 September 2019 NRC Inspection Report 05000361/2019-004 and 05000362/2019-004 IR 05000361/20194012019-08-0505 August 2019 Physical Security Inspection Report 05000361/2019401 and 05000362/2019401 IR 05000361/20190032019-07-15015 July 2019 Southern California Edison Company; San Onofre Nuclear Generating Station - NRC Inspection Report 05000361/2019-003 and 05000362/2019-003 IR 05000206/20180062019-07-0909 July 2019 EA-18-155; Southern California Edison Company; San Onofre Nuclear Generating Station; NRC Supplemental Inspection Report 050-00206/2018-006, 050-00361/2018-006, 050-00362/2018-006, 072-00041/2018-002 IR 05000206/20190022019-05-30030 May 2019 NRC Inspection Report 05000206/2019002, 05000361/2019002, and 05000362/2019002 IR 05000361/20180052019-03-25025 March 2019 Notice of Violation and Proposed Imposition of Civil Penalty and NRC Special Inspection Report 050-00206/2018-005, 050-00361/2018-005, 050-00362/2018-005, 072-00041/2018-001 IR 05000206/20190012019-03-18018 March 2019 NRC Inspection Report 05000206/2019001, 05000361/2019001, and 05000362/2019001 IR 05000206/20180042019-02-21021 February 2019 NRC Inspection Report 05000206/2018-004, 05000361/2018-004, and 05000362/2018-004 ML18341A1722018-12-19019 December 2018 Errata for San Onofre Nuclear Generating Station - NRC Special Inspection Report 05000206-2018-005, 05000361-2018-005, 05000362-2018-005, 07200041-2018-001 and Notice of Violation ML18332A3572018-11-28028 November 2018 EA-18-155, Southern California Edison Company; San Onofre Nuclear Generating Station - NRC Special Inspection Report 050-00206/2018-005, 050-00361/2018-005, 050-00362/2018-005, 072-00041/2018-001 and Notice of Violation IR 05000361/20180032018-11-19019 November 2018 Southern California Edison Company; San Onofre Nuclear Generating Station - NRC Inspection Report 05000361/2018-003 and 05000362/2018-003 IR 05000206/20170032018-08-24024 August 2018 NRC Inspection Report 05000206/2017-003, 05000361/2017-003, 05000362/2017-003, and 07200041/2017-001 IR 05000361/20180022018-08-10010 August 2018 NRC Inspection Report 05000361/2018002 and 05000362/2018002 IR 05000361/20184122018-07-16016 July 2018 Security Inspection Report 05000361/2018412 and 05000362/2018412 2024-08-09
[Table view] Category:Letter
MONTHYEARIR 05000361/20240052024-10-0404 October 2024 NRC Inspection Report 05000361/2024005 and 05000362/2024005 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 07200041/20244012024-08-16016 August 2024 San Onofe Nuclear Generating Station, Security Baseline Inspection Report 07200041/2024401 IR 05000361/20240042024-08-0909 August 2024 NRC Inspection Report 05000361/2024004 and 05000362/2024004 ML24191A2472024-07-0202 July 2024 (Songs), Units 1, 2, and 3, and the Independent Spent Fuel Storage Installation - Revision to the ISFSI-Only Emergency Plan and Associated Changes to Emergency Plan Implementing Procedures ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24141A0802024-05-15015 May 2024 (Songs), Units 1, 2 and 3 and Independent Spent Fuel Storage Installation - 2023 Annual Radiological Environmental Operating Report IR 05000361/20240022024-04-0101 April 2024 – NRC Inspection Report 050-00361/2024-002 and 050-00362/2024-002 ML24094A0642024-03-27027 March 2024 Independent Spent Fuel Storage Installation, Decommissioning Funding Status Report 2023 ML24065A0152024-02-28028 February 2024 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation 2023 ML24044A0812024-02-14014 February 2024 LTR-24-0008: NRC Response to Paul Blanch Email Safety of Spent Nuclear Fuel at SONGS ISFSI IR 05000361/20240012024-02-13013 February 2024 NRC Inspection Report 050-00361/2024-001 and 050-00362/2024-001 (1) ML24037A0542024-01-30030 January 2024 (Songs), Units 2 and 3, Submittal of Annual Corporate Financial Reports ML24022A1492024-01-17017 January 2024 Independent Spent Fuel Storage Installation, Revision 4 to the Physical Security Plan ML24017A2432024-01-15015 January 2024 LTR-24-0008 Paul Blanch, E-mails Request for Formal Response to Requests for Meeting to Discuss Safety Issues with NRC Staff IR 05000361/20230062023-11-29029 November 2023 NRC Inspection Report 05000361/2023-006 and 05000362/2023-006 ML23333A0682023-11-22022 November 2023 (SONGS) Units 1, 2, 3 and Independent Spent Fuel Storage Installation - Notification of Change in Nuclear Officer IR 05000361/20230052023-10-11011 October 2023 NRC Inspection Report 05000361/2023005 and 05000362/2023005 ML23276A5942023-09-28028 September 2023 And Independent Spent Fuel Storage Installation - Supplement to Decommissioning Funding Status Reports ML23268A0922023-09-20020 September 2023 Generation Station, Units 1, 2 and 3, and the Independent Spent Fuel Storage Facility (ISFSI) - Re-Registration of Dry Fuel Storage Casks for Amended Certificate of Compliance No. 1040 IR 05000361/20230012023-09-13013 September 2023 NRC Inspection Report 05000361 2023-001 and 05000362 2023-004 ML23240A5372023-08-18018 August 2023 Confirmatory Survey Activities Summary and Results for the Unit 2 and 3 Intake Structures at the San Onofre Nuclear Generating Station San Clemente CA ML23129A1802023-06-14014 June 2023 Cover Letter to State of CA on Draft EA Regarding San Onofre ISFSI Updated DFPs IR 05000361/20230032023-05-31031 May 2023 NRC Inspection Report 05000361/2023003 and 05000362/2023003 IR 05000361/20230022023-05-23023 May 2023 NRC Inspection Report 05000361/2023-002 and 05000362/2023-002 ML23137A1032023-05-11011 May 2023 (Songs), Units 1, 2 and 3, and Independent Spent Fuel Storage Installation - 2022 Annual Radiological Environmental Operating Report ML23123A0932023-04-28028 April 2023 (Songs), Units 1, 2 and 3, Submittal of Annual Radioactive Effluent Release Report - 2022 ML23230A0882023-04-10010 April 2023 Independent Spent Fuel Storage Installation - Decommissioning Quality Assurance Plan ML23094A1272023-03-29029 March 2023 Independent Spent Fuel Storage Installation - 10 CFR 50.82(a)(8)(v and VII) and 10 CFR 72.30(c) Decommissioning Funding Status Report 2021 ML23094A1332023-03-29029 March 2023 Nuclear Property Insurance ML23062A1172023-02-28028 February 2023 Generation Station Units 1, 2 and 3, Annual Radioactive Effluent Release Report for Independent Spent Fuel Storage Installation - 2022 ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23059A2812023-02-22022 February 2023 (Songs), Units 1, 2 and 3, 2022 Annual Turtle Incidental Take Report ML23046A3792023-02-22022 February 2023 NRC Inspection Report 050-00361/2023-001 and 050-00362/2023-001 ML23045A2022023-02-0909 February 2023 Submittal of Annual Corporate Financial Reports for San Onofre Nuclear Generating Station (SONGS) Units 2 and 3 for Fy Ending June 30, 2022 ML22287A1352023-01-0505 January 2023 Issuance of Exemption from Title 10 of the Code of Federal Regulations Part 72.106(B), Independent Spent Fuel Storage Installation Controlled Area Boundary (L-2021-LLE-0056) ML22348A0622023-01-0404 January 2023 NRC to SCE, Transmittal of the National Marine Fisheries Services December 12, 2022, Letter of Concurrence for Decommissioning of San Onofre Nuclear Generating Statiion, Units 2 and 3 IR 05000206/20220062022-12-15015 December 2022 NRC Inspection Report 05000206/2022006, 05000361/2022-006, and 05000362/2022-006 ML22347A2122022-12-12012 December 2022 NMFS to NRC, Endangered Species Act Section 7(a)(2) Concurrence Letter for Decommissioning of the San Onofre Nuclear Generating Station ML22340A6652022-12-0505 December 2022 Letter from John Fassell, Chief; Re., State of California Department of Public Health Review and Comments on SONGS Draft Environmental Assessment ML22333A8192022-11-21021 November 2022 Submittal of San Onofre Nuclear Generating Station, Units 2 and 3, Defueled Safety Analysis Report, Revised November 2022 IR 05000361/20220052022-11-17017 November 2022 – NRC Inspection Report 05000361/2022-005 and 05000362/2022-005 ML22301A1462022-10-20020 October 2022 Report of Violations of the National Pollutant Discharge Elimination System Permit San Onofre Nuclear Generating Station (Songs), Units 2 and 3 ML22277A0162022-09-29029 September 2022 Independent Spent Fuel Storage Installation Response to Request for Additional Information Regarding Request for Exemption from 10 CFR 72.106(b) IR 05000361/20220042022-09-26026 September 2022 NRC Inspection Report 05000361/2022-004 and 05000362/2022-004 ML22238A0552022-08-29029 August 2022 U.S. Nuclear Regulatory Commissions Analysis of Southern California Edisons Decommissioning Funding Status Report for San Onofre Nuclear Generating Station, Units 1, 2, and 3 ML22234A1602022-07-31031 July 2022 Final Report Per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 18CLVS431 ML22207B8612022-07-26026 July 2022 NRC (Public) Inspection Report 05000361/2022003; 05000362/2022003 IR 05000361/20220032022-07-26026 July 2022 NRC Inspection Report (Public) 05000361-2022003 and 05000362-2022003 (002) IR 05000361/20220022022-05-12012 May 2022 NRC Inspection Report 05000361/2022-002 and 05000362/2022-002 2024-09-18
[Table view] |
Text
July 23, 2012
SUBJECT:
SAN ONOFRE NUCLEAR GENERATING STATION - NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION REPORT 05000361/2012008 AND 05000362/2012008
Dear Mr. Dietrich:
On June 8, 2012, the U.S. Nuclear Regulatory Commission completed a Problem Identification and Resolution biennial inspection at your San Onofre Nuclear Generating Station. The enclosed inspection report documents the inspection results that were discussed with you and other members of your staff.
This inspection was an examination of activities conducted under your license as they relate to problem identification and resolution and compliance with the Commission's rules and regulations and the conditions of your license. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.
Based on the inspection sample, the inspection team concluded that the implementation of the corrective action program and overall performance related to identifying, evaluating, and resolving problems at San Onofre Nuclear Generating Station was effective. Licensee identified problems were entered into the corrective action program at a low threshold. Problems were effectively prioritized and evaluated commensurate with the safety significance. Corrective actions were effectively implemented in a timely manner commensurate with their importance to safety and addressed the identified causes of problems. Lessons learned from industry-operating experience were effectively reviewed and applied, when appropriate. Audits and self-assessments were effectively used to identify problems and appropriate actions. Finally, the team verified that the licensee had established a safety-conscious work environment where workers felt free to raise safety concerns without fear of retaliation.
UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 EAST LAMAR BLVDARLINGTON, TEXAS 76011-4511 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Dr. Dale A. Powers, Acting Chief Technical Support Branch Docket Nos.: 05000361, 05000362 License Nos: NPF-10, NPF-15 Enclosure: 1. Inspection Report 05000361/2012008 and 05000362/2012008 w/ Attachment: Supplemental Information
Electronic Distribution to SONGS
ML12205A166 SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials HAF Publicly Avail. Yes No Sensitive Yes No Sens. Type Initials HAF SRI:DRS/TSB RI:DRS/EB1 RI:DRP/ANO OE:DRS/OB PE:DRP/PBD Acting C:DRS/TSB HAFreeman JDBraisted JRotton DGStrickland DDYou DAPowers /RA/ /E-Mail/ /E-mail/ /E-mail/ Per Telecon /RA/ 7/23/2012 7/23/2012 7/23/2012 7/23/2012 7/23/2012 7/23/2012 C:DRP/PBD Acting C:DRS/TSB RELantz DAPowers /NHT for/ /RA/ 7/23/2012 7/23/2012
- 1 - Enclosure OFFICIAL RECORD COPY U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 05000361, 05000362 License: NPF-10, NPF-15 Report: 05000361/2012008 and 05000362/2012008 Licensee: Southern California Edison Facility: San Onofre Nuclear Generating Station Location: 4 miles SE of San Clemente, California Dates: May 21 through June 8, 2012 Team Leader: Harry A. Freeman, Senior Reactor Inspector Inspectors:
Dr. Jonathan D. Braisted, Reactor Inspector Jeff Rotton, Resident Inspector Duane G. Strickland, Operations Engineer David D. You, Project Engineer Approved By: Dr. Dale A. Powers, Acting Chief Technical Support Branch Division of Reactor Safety
- 2 - Enclosure
SUMMARY OF FINDINGS
IR 05000361/2012008 and 05000362/2012008; May 21, 2012 - June 8, 2012; San Onofre Nuclear Generating Station "Biennial Baseline Inspection of the Identification and Resolution of Problems."
The team inspection was performed by a senior reactor inspector, a reactor inspector, an operations engineer, a resident inspector, and a project engineer. No findings of significance were identified during this inspection.
Identification and Resolution of Problems The team reviewed approximately 250 condition reports, work orders, engineering evaluations, root and apparent cause evaluations, and other supporting documentation to determine if problems were being properly identified, characterized, and entered into the corrective action program for evaluation and resolution. The team reviewed a sample of system health reports, self-assessments, trending reports and metrics, and various other documents related to the corrective action program.
On the basis of the activities selected for review, the team concluded that implementation of the problem and identification process and the corrective action program at the San Onofre Nuclear Generating Station was effective. The licensee had a very low threshold for identifying problems and entering them in the corrective action program as evidenced by a high number of nuclear notifications generated (roughly 45,000) per year. Items were screened and prioritized in a timely manner using established criteria and were evaluated commensurate with their safety significance. The team concluded the licensee's overall implementation of actions to correct issues and prevent recurrence of issues was effective. The licensee reviewed operating experience for applicability to station activities. Audits and self-assessments were determined to be performed at an appropriate level to identify deficiencies. On the basis of focus group and individual interviews conducted during the inspection, the team concluded that the safety-conscious work environment had significantly improved since the last biennial inspection and that workers felt free to raise nuclear safety concerns via various methods without fear of retaliation.
The licensee appropriately evaluated industry-operating experience for relevance to the facility and had entered applicable items in the corrective action program. The licensee used industry-operating experience when performing root cause and apparent cause evaluations. The licensee performed effective quality assurance audits and self-assessments, as demonstrated by self identification of poor corrective action program performance and identification of ineffective corrective actions.
A. NRC-Identified and Self-Revealing Findings
No findings of significance were identified.
B. Licensee-Identified Violations
None
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA2 Problem Identification and Resolution
The team based the following conclusions on the sample of corrective action documents that were initiated in the assessment period, which ranged from June 18, 2010, to the end of the on-site portion of this inspection on June 8, 2012.
.1 Assessment of the Corrective Action Program Effectiveness
a. Inspection Scope
The team reviewed approximately 250 nuclear notifications including associated root cause, apparent cause, and direct cause evaluations, from approximately 94,000 that had been issued between June 18, 2010, and June 8, 2012, to determine if problems were being properly identified, characterized, and entered into the corrective action program for evaluation and resolution. The team reviewed a sample of system health reports, operability determinations, self-assessments, trending reports and metrics, and various other documents related to the corrective action program. The team evaluated the licensee's efforts in establishing the scope of problems by reviewing selected logs, work requests, self-assessment results, audits, system health reports, action plans, and results from surveillance tests and preventive maintenance tasks. The team reviewed work requests and attended the licensee's daily action review committee pre-screening and the management review committee meetings to assess the reporting threshold, prioritization efforts, and significance determination process, as well as observing the interfaces with the operability assessment and work control processes, when applicable. The team's review included verifying the licensee considered the full extent of cause and extent of condition for problems, as well as how the licensee assessed generic implications and previous occurrences. The team assessed the timeliness and effectiveness of corrective actions, completed or planned, and looked for additional examples of similar problems.
The team also reviewed corrective action documents that addressed past NRC-identified violations to ensure that the corrective action addressed the issues as described in the inspection reports. The inspectors reviewed a sample of corrective actions closed to other corrective action documents to ensure that corrective actions were appropriate and timely.
The team considered risk insights from both the NRC's and San Onofre Nuclear Generating Station risk assessments to focus the sample selection and plant tours on risk significant systems and components. The team selected the following risk significant systems: safety and non-safety related inverters and battery chargers, and emergency core cooling systems pumps.
The samples reviewed by the team focused on, but were not limited to, these systems. The team also expanded their review to include five years of evaluations involving the inverters and battery chargers to determine whether problems were being effectively addressed. The team conducted a walkdown of these systems to assess whether problems were identified and entered into the corrective action program.
b.
Assessments 1. Assessment - Effectiveness of Problem Identification
The team concluded that the licensee identified issues and adverse conditions in accordance with the licensee's corrective action program guidance and NRC requirements. The team noted that licensee personnel had a very low threshold for entering issues into nuclear notification system (corrective action program) as evidenced by the more than 94 thousand notifications issued during the two year review cycle. The team did not identify any deficiencies in the area of problem identification for the samples reviewed.
2.
Assessment - Effectiveness of Prioritization and Evaluation of Issues The team concluded that the licensee in general effectively prioritized and evaluated conditions adverse to quality. The team found that even with the high number of notifications initiated on a daily basis, licensee's daily action review committee pre-screening and the management review committees effectively assessed each condition adverse to quality. The team reviewed a number of notifications that involved operability reviews to assess the quality, timeliness, and prioritization of operability assessments. In general, both immediate and prompt operability assessments reviewed were adequately completed in a timely manner.
3.
Assessment - Effectiveness of Corrective Action Program Overall, the team concluded that the licensee had an effective corrective action program where conditions adverse to quality were promptly identified, prioritized, evaluated, and corrected in a timely manner commensurate to safety significance.
The team identified two adverse trends indicative of the program's effectiveness that were resolved by the licensee over the inspection period. The first trend involved a large number of deficiencies identified for failure to adequately control contractors. The licensee initiated process changes in the Fall of 2011 that reduced the number of errors significantly. The second trend involved work hour rule violations. Again, the licensee initiated process changes and significantly reduced the number of violations and eliminated repetition of minimum days off violations.
.2 Assessment of the Use of Operating Experience
a. Inspection Scope
The team examined the licensee's program for reviewing industry-operating experience, including reviewing the governing procedure and self-assessments.
A sample size of 14 operating experience notifications that had been issued during the assessment period were reviewed to assess whether the licensee had appropriately evaluated the notifications for relevance to the facility. The team then examined whether the licensee has entered those items into its corrective action program and assigned actions to address the issues. The team reviewed a sample of root cause evaluations and corrective action documents to verify if the licensee had appropriately included industry-operating experience.
b.
Assessment Overall, the team determined that the licensee was adequately evaluating industry-operating experience for relevance to the facility. Corrective action documents considered operating experience in the cause and resolution evaluations. The licensee had entered applicable items in the corrective action program in accordance with station procedures. Both internal and external operating experience was being incorporated into lessons learned for training and pre-job briefs.
.3 Assessment of Self-Assessments and Audits
a. Inspection Scope
The team reviewed a sample of licensee self-assessments, surveillances, and audits to assess whether the licensee was regularly identifying performance trends and effectively addressing them. The team reviewed audit reports to assess the effectiveness of assessments in specific areas. The team evaluated the use of self- and third party assessments, the role of the quality assurance department, and the role of the performance improvement group related to licensee performance. The specific self-assessment documents reviewed are listed in the Attachment.
b. Assessment The team concluded that the licensee had an effective self-assessment and audit process. Licensee management was involved with developing tactical self-assessments. The team determined self-assessments were self-critical and thorough enough to identify deficiencies.
.4 Assessment of Safety-Conscious Work Environment
a. Inspection Scope
The inspection team conducted six focus group interviews with typically ten individuals per group. The focus groups consisted of workers from the nuclear boiler and condenser, design engineering, health physics, instrumentation and controls, project management, and operations organizations. Individuals were randomly selected by the NRC to assure representative outcomes for the interviews. The inspection team also conducted individual interviews. The interviewees represented various functional organizations and ranged across contractor, staff, and supervisor levels. The team conducted these interviews to assess whether conditions existed that would challenge the establishment of a safety-conscious work environment at San Onofre Nuclear Generating Station.
b. Assessment The inspection team concluded that the licensee had established a safety-conscious work environment where individuals felt free to raise safety concerns both to the licensee and to the NRC without fear of retaliation. Responses to questions and topics during the focus group sessions did not reveal any sense that safety was not the highest priority. All organizations indicated that the work environment had changed significantly from just over two years ago when the NRC identified a challenged safety-conscious work environment and issued a chilling effects letter. On the basis of focus group and individual interviews conducted during the inspection, the team concluded that the safety-conscious work environment had significantly improved since the last biennial inspection and that workers felt free to raise nuclear safety concerns via various methods without fear of retaliation.
4OA6 Meetings
Exit Meeting Summary
On June 8, 2012, the team presented the inspection results to Mr. Peter Dietrich, Senior Vice President and Chief Nuclear Officer, and other members of the licensee staff. The licensee staff acknowledged the issues presented. The inspectors asked the licensee staff whether any materials examined during the inspection should be considered proprietary. No proprietary information was identified.
4OA7 Licensee-Identified Violations
None ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- P. Dietrich - CNO D. Bauder - VP, Station Manager T. McCool - Plant Manager
- R. Corbett - Director, Performance Improvement
- R. St. Onge - Director, Regulatory Affairs
- D. Yarbrough - Director, Operations
- J. Madigan - Director, Nuclear Safety Culture
- B. Sholler - Director, Maintenance
- B. Winn - Director, Finance Management
- E. Avella - Director, Project Management Organization
- J. Pyles - Director, IT/BI
- R. Davis - Director, Nuclear Training
- T. Gallaher - Manager, CAP
- L. Mosher - Manager, Corporate Communications
- K. Johnson - Manager, Design Engineering
- O. Thomsen - Manager, Nuclear Fuels
- M. Stevens - Nuclear Engineer, Inspections
- J. Demlow - Supervisor, Chemistry
- R. McWey - Manager, Project Oversight
- M. DeMarco - Liaison, SDG&E
- A. Martinez - Manager, Self-Assessments
- L. Kelly - Manager, Compliance
- M. Cuarenta - Technical Specialist, CAP
- J. Bashore - Contractor C. Cates - Manager, Site Recovery
- D. Abell - CAPCO Program Owner C. Hurn - ARC/MRC Program Owner D. Piper - Technical Specialist, Security
- L. Murriel - Manager, Business Administration
- M. Pawlaczyk - Technical Specialist, Inspections
NRC personnel
- D. Powers - Acting Chief, Technical Support Branch G. Warnick - Senior Resident Inspector J. Reynoso - Resident Inspector
LIST OF ITEMS
OPENED, CLOSED AND DISCUSSED
Opened
None
Opened and Closed
None
Closed
None
Discussed
None
LIST OF DOCUMENTS REVIEWED