|
|
Line 3: |
Line 3: |
| | issue date = 04/02/2015 | | | issue date = 04/02/2015 |
| | title = Request for Withholding Information from Public Disclosure - 2/6/15 Affidavit Executed by G. Elliott, Areva Inc. ANP-3300Q1P, February 2015 Related to RCS Pressure/Temperature License Amendment Request | | | title = Request for Withholding Information from Public Disclosure - 2/6/15 Affidavit Executed by G. Elliott, Areva Inc. ANP-3300Q1P, February 2015 Related to RCS Pressure/Temperature License Amendment Request |
| | author name = George A E | | | author name = George A |
| | author affiliation = NRC/NRR/DORL/LPLIV-1 | | | author affiliation = NRC/NRR/DORL/LPLIV-1 |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000313 | | | docket = 05000313 |
| | license number = DPR-051 | | | license number = DPR-051 |
| | contact person = George A E | | | contact person = George A |
| | case reference number = TAC MF5292 | | | case reference number = TAC MF5292 |
| | document type = Letter, Proprietary Information Review | | | document type = Letter, Proprietary Information Review |
Line 24: |
Line 24: |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| By letter dated February 6, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15041A073), Entergy Operations, Inc. (the licensee) submitted supplemental information regarding a license amendment request to update the reactor coolant system pressure and temperature limits at Arkansas Nuclear One, Unit 1. The information included an affidavit executed by Gayle F. Elliott, AREVA Inc. (AREVA), February 6, 2015, requesting that information contained in the following document be withheld from public disclosure pursuant to the Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: ANP-330001 P, "Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1," dated February 2015. A nonproprietary copy of this document has been added to the U.S. Nuclear Regulatory Commission (NRC) Library at ADAMS Accession No. ML 15041A074. | | By letter dated February 6, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15041A073), Entergy Operations, Inc. (the licensee) submitted supplemental information regarding a license amendment request to update the reactor coolant system pressure and temperature limits at Arkansas Nuclear One, Unit 1. The information included an affidavit executed by Gayle F. Elliott, AREVA Inc. (AREVA), February 6, 2015, requesting that information contained in the following document be withheld from public disclosure pursuant to the Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: ANP-330001 P, "Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1," dated February 2015. A nonproprietary copy of this document has been added to the U.S. Nuclear Regulatory Commission (NRC) Library at ADAMS Accession No. ML15041A074. |
| The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA. (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability. (e) The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA. We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA. (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability. (e) The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA. We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. | | Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. |
Line 38: |
Line 38: |
| If you have any questions regarding this matter, I may be reached at 301-415-1081. | | If you have any questions regarding this matter, I may be reached at 301-415-1081. |
| Docket No. 50-313 cc: Gayle F. Elliott Manager Product Licensing AREVA Inc. 3315 Old Forest Road Lynchburg, VA 24501 Additional distribution via Listserv DISTRIBUTION: | | Docket No. 50-313 cc: Gayle F. Elliott Manager Product Licensing AREVA Inc. 3315 Old Forest Road Lynchburg, VA 24501 Additional distribution via Listserv DISTRIBUTION: |
| Sincerely, IRA! Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEvib Resource RidsNrrDorllpl4-1 Resource RidsNrrDssSrxb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMANO Resource RidsRgn4MailCenter Resource ADAMS Accession No ML 15072A077 OFFICE NRR/DORULPL4-1 | | Sincerely, IRA! Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEvib Resource RidsNrrDorllpl4-1 Resource RidsNrrDssSrxb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMANO Resource RidsRgn4MailCenter Resource ADAMS Accession No ML15072A077 OFFICE NRR/DORULPL4-1 |
| /PM NRR/DORL/LPL4-1/LA NRR/DE/EVIB/BC NAME A George JBurkhardt SRosenberg DATE 3/26/15 3/13/15 3/26/15 OFFICE NRR/DSS/SRXB/BC NRR/DORL/LPL4-1/BC N RR/DORL/LPL4-1 | | /PM NRR/DORL/LPL4-1/LA NRR/DE/EVIB/BC NAME A George JBurkhardt SRosenberg DATE 3/26/15 3/13/15 3/26/15 OFFICE NRR/DSS/SRXB/BC NRR/DORL/LPL4-1/BC N RR/DORL/LPL4-1 |
| /PM NAME CJackson MMarkley (Flyon for) A George DATE 3/31/15 4/1/15 4/2/15 OFFICIAL RECORD COPY}} | | /PM NAME CJackson MMarkley (Flyon for) A George DATE 3/31/15 4/1/15 4/2/15 OFFICIAL RECORD COPY}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEAR1CAN031403, Request for Exemption from Certain 10 CFR 50.61 and 10 CFR 50, Appendix G Requirements2014-03-20020 March 2014 Request for Exemption from Certain 10 CFR 50.61 and 10 CFR 50, Appendix G Requirements Project stage: Request 1CAN111401, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2014-11-21021 November 2014 License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Project stage: Request ML14330A2502014-11-30030 November 2014 Attachment 4 to 1CAN111401, ANP-3300, Revision 1, Pressure-Temperature Limits at 54 Efpy. Project stage: Request ML14345A6442014-12-11011 December 2014 NRR E-mail Capture - Acceptance Review Results - ANO-1 License Amendment Request to Revise the P/T and LTOP Limits - MF5292 Project stage: Acceptance Review ML15021A4282015-01-21021 January 2015 NRR E-mail Capture - Requests for Additional Information - ANO-1 P/T and LTOP Limits LAR to Extend P/T Curves to 54 EFPY - TAC No. MF5292 Project stage: RAI 1CAN021502, Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2015-02-0606 February 2015 Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Project stage: Response to RAI ML15041A0742015-02-0606 February 2015 ANP-3300Q1NP, Rev. 0, Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1, Attachment 2 to 1CAN0 Project stage: Response to RAI ML15065A0842015-03-0404 March 2015 NRR E-mail Capture - Request for Additional Information (2nd Round) - Arkansas Nuclear One, Unit 1 - LAR to Revise Pressure-Temperature Limits to 54 EFPY - TAC No. MF5292 Project stage: RAI 1CAN031503, Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Arkansas Nuclear One, Unit 12015-03-10010 March 2015 Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Arkansas Nuclear One, Unit 1 Project stage: Response to RAI ML15097A0052015-03-20020 March 2015 NRR E-mail Capture - Arkansas Nuclear One, Unit No. 1, Request for Additional Information (Second Round) - License Amendment Request Project stage: RAI ML15086A0242015-03-25025 March 2015 ANP-3300Q3NP, Revision 0 to Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1 (Non-Proprietary Project stage: Response to RAI ML15072A0792015-03-26026 March 2015 Request for Withholding Information from Public Disclosure - 3/9/15 Affidavit Executed by A. Meginnis, Areva Inc. ANP-3300Q2P, March 2015 Related to RCS Pressure/Temperature License Amendment Request Project stage: Withholding Request Acceptance ML15071A0552015-03-31031 March 2015 ANP-3300Q2NP, Revision 0, Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1. Project stage: Response to RAI ML15072A0772015-04-0202 April 2015 Request for Withholding Information from Public Disclosure - 2/6/15 Affidavit Executed by G. Elliott, Areva Inc. ANP-3300Q1P, February 2015 Related to RCS Pressure/Temperature License Amendment Request Project stage: Withholding Request Acceptance ML15093A0062015-04-0202 April 2015 NRR E-mail Capture - Requests for Additional Information - 4th Round - ANO-1 P/T and LTOP Limits Update to 54 EFPY License Amendment Request - MF5292 Project stage: RAI 1CAN041502, Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2015-04-0707 April 2015 Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Project stage: Response to RAI ML15096A0142015-04-20020 April 2015 Request for Withholding Information from Public Disclosure - 3/26/15 Affidavit Executed by G. Elliott, Areva Inc.; ANP-3300Q3P and Document No. 32-9220706-002 RCS Pressure/Temperature Amendment Request Project stage: Withholding Request Acceptance ML15096A3242015-04-24024 April 2015 Issuance of Amendment No. 254, Revise Technical Specifications to Update Reactor Coolant System Pressure and Temperature and Low Temperature Overpressure Protection System Limits Project stage: Approval 2015-03-20
[Table View] |
|
---|
Category:Letter
MONTHYEARML24295A1202024-10-21021 October 2024 Relief Request ANO2-RR-24-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 71 ML24185A2602024-10-0404 October 2024 Issuance of Amendment No. 335 to Revise Typographical Errors in Technical Specifications IR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification 05000313/LER-2024-001, Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications2024-07-0101 July 2024 Source Range Nuclear Instrument Failure Resulting in Condition Prohibited by Technical Specifications ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) IR 05000313/20244042024-04-0808 April 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000313/2024404 and 05000368/2024404) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 – Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23324A0172023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV 2024-09-09
[Table view] Category:Proprietary Information Review
MONTHYEARML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23066A0472023-04-0505 April 2023 Request for Withholding Information from Public Disclosure ML22305A5632022-11-28028 November 2022 Request for Withholding Information from Public Disclosure ML22070B1282022-03-21021 March 2022 Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 2 ML21298A0582021-10-28028 October 2021 Request for Withholding Information from Public Disclosure ML21195A0392021-09-0202 September 2021 Request for Withholding Proprietary Information from Public Disclosure for X-Energy, LLC Regulatory Engagement Plan Update for the XE-100 Reactor ML21145A0042021-06-28028 June 2021 Request for Withholding Information from Public Disclosure ML20293A1842020-11-0404 November 2020 Request for Withholding Information from Public Disclosure ML17032A3902017-02-16016 February 2017 Request for Withholding Information from Public Disclosure ML16321A0862016-11-29029 November 2016 Request for Withholding Information from Public Disclosure ML16039A0202016-02-16016 February 2016 Request for Withholding Information from Public Disclosure ML15148A2022015-05-29029 May 2015 Request for Withholding Information from Public Disclosure - 4/17/15 Affidavit Executed by N. Wilmshurst, Electric Power Research Institute EPRI Report 1015133 Dated March 2014, Relief Request ANO2-ISI-016 ML15139A0022015-05-20020 May 2015 Request for Withholding Information from Public Disclosure, 1/25/15 Affidavit Executed by G. Elliot, Areva Inc. ANP-3281Q1P, Revision 0, Response to NRC Request for Additional Information on Time-Limited Aging Analysis ML15096A0142015-04-20020 April 2015 Request for Withholding Information from Public Disclosure - 3/26/15 Affidavit Executed by G. Elliott, Areva Inc.; ANP-3300Q3P and Document No. 32-9220706-002 RCS Pressure/Temperature Amendment Request ML15072A0772015-04-0202 April 2015 Request for Withholding Information from Public Disclosure - 2/6/15 Affidavit Executed by G. Elliott, Areva Inc. ANP-3300Q1P, February 2015 Related to RCS Pressure/Temperature License Amendment Request ML15072A0792015-03-26026 March 2015 Request for Withholding Information from Public Disclosure - 3/9/15 Affidavit Executed by A. Meginnis, Areva Inc. ANP-3300Q2P, March 2015 Related to RCS Pressure/Temperature License Amendment Request ML15051A4182015-02-24024 February 2015 Request for Withholding Information from Public Disclosure - 2/9/15 Affidavit Executed by G. Elliott, Areva, Inc., ANP-3383P, Revision 0 ML14303A0262014-10-29029 October 2014 Letter to K. Manzione Holtec International Request for Withholding Information from Public Disclosure (TAC No. L24954) ML14169A5092014-08-0707 August 2014 Request for Withholding Information from Public Disclosure, 3/25/14 Affidavit Executed by G. Elliot, Areva Inc. Regarding Time-Limited Aging Analysis ML13129A3462013-06-12012 June 2013 Request for Withholding Information from Public Disclosure - 10/31/12 Affidavit Executed by J. Gresham, Westinghouse Re Calculation Note CN-MRCDA-12-27, Revision 1 ML12314A0492012-12-11011 December 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 8/16/12, Executed by J. Gresham of Westinghouse Electric Company LLC, Re CN-MRCDA-12-27 ML12314A0602012-12-11011 December 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 9/4/2012, Executed by Marcos Legaspi Herrera of Structural Integrity Associates, Inc. Re Second RAI Response ML1018103452010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-18, Revision 0 ML1018103372010-07-29029 July 2010 Request for Withholding Information from Public Disclosure ML1018103312010-07-29029 July 2010 Request for Withholding Information from Public Disclosure ML1018102332010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-57, Revision 0 ML1018102262010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-17, Revision 0 ML1018102242010-07-29029 July 2010 Request for Withholding Information from Public Disclosure, 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-16, Revision 0, TAC No. ME3678 ML1018102182010-07-29029 July 2010 Request for Withholding Information from Public Disclosure, 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-15, Revision 0, TAC No. ME3678 ML1012604132010-05-13013 May 2010 Request for Withholding Information from Public Disclosure - Affidavit Executed by Gayle Elliott, Areva Np Inc. on April 9, 2010 ML1010406012010-05-13013 May 2010 Request for Withholding Information from Public Disclosure - Affidavit Executed by M. Taylor, Structural Integrity Associates on 4/9/2010 ML0935201042010-01-0505 January 2010 Request for Withholding Information from Public Disclosure - 12/11/2009 Affidavit Executed by G. Elliott, Areva Np Re 12/15/09 Entergy Meeting Slides ML0932004602009-11-23023 November 2009 Request for Withholding Information from Public Disclosure - 8/3/2009 Affidavit Executed by J. Gresham, Westinghouse ML0730502932007-12-0606 December 2007 Request for Withholding Information from Public Disclosure Holtec Report No. HI-2063601 (Tac No. MD4994) ML0725702582007-11-0505 November 2007 Entergy Operations, Inc. Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 2, Re LAR to Support Partial Rerack/Revised Loading Patterns, Spent Fuel Pool ML0717603002007-07-0909 July 2007 Entergy Operations, Inc. Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 2 (Tac No. MD4994) ML0711400242007-05-0101 May 2007 (Ano), Unit 2 - Request for Withholding Information from Public Disclosure ML0629100182006-10-31031 October 2006 Request for Withholding Information from Public Disclosure ML0528002642005-09-26026 September 2005 Holtec International, Request for Withholding Information from Public Disclosure for ANO, Unit 2 ML0509605752005-04-0606 April 2005 Framatome Anp, Request for Withholding Information from Public Disclosure for Ano. Unit 2 ML0418902682004-07-0606 July 2004 7/6/04, ANO1 - Framatome Anp (Fanp), Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 1 ML0404904952004-02-11011 February 2004 Westinghouse Electric Company, Withholding from Public Disclosure, Wesdyne Reports WDI-TJ-001-02-P, Revision 3, WDI-TJ-012-03-P, Revision 2, WDI-TJ-006-03-P, Revision 3 2CAN010402, Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection2004-01-16016 January 2004 Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection ML0327700102003-10-0202 October 2003 Proprietary Information Review, Material Properties and Modeling Methods Used in ANO Unit 2 Welding Residual Stress Analyses ML0217602842002-07-11011 July 2002 Withholding from Public Disclosure, Wesdyne Report WDI-TJ-007-02-P, (TACs MB4524 & MB4525) 2023-07-12
[Table view] |
Text
Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 2, 2015
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT NO. 1 -REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. MF5292)
Dear Sir or Madam:
By letter dated February 6, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15041A073), Entergy Operations, Inc. (the licensee) submitted supplemental information regarding a license amendment request to update the reactor coolant system pressure and temperature limits at Arkansas Nuclear One, Unit 1. The information included an affidavit executed by Gayle F. Elliott, AREVA Inc. (AREVA), February 6, 2015, requesting that information contained in the following document be withheld from public disclosure pursuant to the Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: ANP-330001 P, "Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1," dated February 2015. A nonproprietary copy of this document has been added to the U.S. Nuclear Regulatory Commission (NRC) Library at ADAMS Accession No. ML15041A074.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons: (c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for AREVA. (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for AREVA in product optimization or marketability. (e) The information is vital to a competitive advantage held by AREVA, would be helpful to competitors to AREVA, and would likely cause substantial harm to the competitive position of AREVA. We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1081.
Docket No. 50-313 cc: Gayle F. Elliott Manager Product Licensing AREVA Inc. 3315 Old Forest Road Lynchburg, VA 24501 Additional distribution via Listserv Sincerely, Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation We have reviewed your submittal in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.
If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.
In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1081.
Docket No. 50-313 cc: Gayle F. Elliott Manager Product Licensing AREVA Inc. 3315 Old Forest Road Lynchburg, VA 24501 Additional distribution via Listserv DISTRIBUTION:
Sincerely, IRA! Andrea E. George, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation PUBLIC LPL4-1 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEvib Resource RidsNrrDorllpl4-1 Resource RidsNrrDssSrxb Resource RidsNrrLAJBurkhardt Resource RidsNrrPMANO Resource RidsRgn4MailCenter Resource ADAMS Accession No ML15072A077 OFFICE NRR/DORULPL4-1
/PM NRR/DORL/LPL4-1/LA NRR/DE/EVIB/BC NAME A George JBurkhardt SRosenberg DATE 3/26/15 3/13/15 3/26/15 OFFICE NRR/DSS/SRXB/BC NRR/DORL/LPL4-1/BC N RR/DORL/LPL4-1
/PM NAME CJackson MMarkley (Flyon for) A George DATE 3/31/15 4/1/15 4/2/15 OFFICIAL RECORD COPY