Letter Sequence Response to RAI |
|---|
|
|
MONTHYEAR1CAN031403, Request for Exemption from Certain 10 CFR 50.61 and 10 CFR 50, Appendix G Requirements2014-03-20020 March 2014 Request for Exemption from Certain 10 CFR 50.61 and 10 CFR 50, Appendix G Requirements Project stage: Request 1CAN111401, Arkansas Nuclear One, Unit 1, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2014-11-21021 November 2014 Arkansas Nuclear One, Unit 1, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Project stage: Request 1CAN111401, License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2014-11-21021 November 2014 License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Project stage: Request ML14330A2502014-11-30030 November 2014 Attachment 4 to 1CAN111401, ANP-3300, Revision 1, Pressure-Temperature Limits at 54 Efpy Project stage: Request ML14345A6442014-12-11011 December 2014 NRR E-mail Capture - Acceptance Review Results - ANO-1 License Amendment Request to Revise the P/T and LTOP Limits - MF5292 Project stage: Acceptance Review ML15021A4282015-01-21021 January 2015 NRR E-mail Capture - Requests for Additional Information - ANO-1 P/T and LTOP Limits LAR to Extend P/T Curves to 54 EFPY - TAC No. MF5292 Project stage: RAI ML15041A0742015-02-0606 February 2015 ANP-3300Q1NP, Rev. 0, Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1, Attachment 2 to 1CAN0 Project stage: Response to RAI 1CAN021502, Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2015-02-0606 February 2015 Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Project stage: Response to RAI ML15065A0842015-03-0404 March 2015 NRR E-mail Capture - Request for Additional Information (2nd Round) - Arkansas Nuclear One, Unit 1 - LAR to Revise Pressure-Temperature Limits to 54 EFPY - TAC No. MF5292 Project stage: RAI 1CAN031503, Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Arkansas Nuclear One, Unit 12015-03-10010 March 2015 Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Arkansas Nuclear One, Unit 1 Project stage: Response to RAI ML15097A0052015-03-20020 March 2015 NRR E-mail Capture - Arkansas Nuclear One, Unit No. 1, Request for Additional Information (Second Round) - License Amendment Request Project stage: RAI 1CAN031504, Arkansas Nuclear One, Unit 1 - Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2015-03-25025 March 2015 Arkansas Nuclear One, Unit 1 - Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Project stage: Request ML15086A0242015-03-25025 March 2015 ANP-3300Q3NP, Revision 0 to Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1 (Non-Proprietary Project stage: Response to RAI ML15072A0792015-03-26026 March 2015 Request for Withholding Information from Public Disclosure - 3/9/15 Affidavit Executed by A. Meginnis, Areva Inc. ANP-3300Q2P, March 2015 Related to RCS Pressure/Temperature License Amendment Request Project stage: Withholding Request Acceptance ML15071A0552015-03-31031 March 2015 ANP-3300Q2NP, Revision 0, Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1 Project stage: Response to RAI ML15072A0772015-04-0202 April 2015 Request for Withholding Information from Public Disclosure - 2/6/15 Affidavit Executed by G. Elliott, Areva Inc. ANP-3300Q1P, February 2015 Related to RCS Pressure/Temperature License Amendment Request Project stage: Withholding Request Acceptance ML15093A0062015-04-0202 April 2015 NRR E-mail Capture - Requests for Additional Information - 4th Round - ANO-1 P/T and LTOP Limits Update to 54 EFPY License Amendment Request - MF5292 Project stage: RAI 1CAN041502, Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2015-04-0707 April 2015 Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Project stage: Response to RAI ML15096A0142015-04-20020 April 2015 Request for Withholding Information from Public Disclosure - 3/26/15 Affidavit Executed by G. Elliott, Areva Inc.; ANP-3300Q3P and Document No. 32-9220706-002 RCS Pressure/Temperature Amendment Request Project stage: Withholding Request Acceptance ML15096A3242015-04-24024 April 2015 Issuance of Amendment No. 254, Revise Technical Specifications to Update Reactor Coolant System Pressure and Temperature and Low Temperature Overpressure Protection System Limits Project stage: Approval 2015-03-20
[Table View] |
Text
Entergy Operations, Inc.
Entergy 1448 S.R. 333 Russellville, AR 72802 Tel 479-858-3110 Jeremy G. Browning Site Vice President Arkansas Nuclear One 1 CAN021502 February 6, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555
SUBJECT:
Responses to Request for Additional Information Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits Arkansas Nuclear One, Unit 1 Docket No. 50-313 License No. DPR-51
REFERENCES:
1 Entergy letter to NRC, "License Amendment Request Update the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits," dated November 21, 2014 (1 CANI 11401) (ML14330A249) 2 NRC email to Entergy, dated January 21, 2015, "Requests for Additional Information - ANO-1 P/T and LTOP LAR to Extend P/T Curves to 54 EFPY - TAC No. MF5292"
Dear Sir or Madam:
In accordance with the provisions of Title 10 of the Code of Federal Regulations (10 CFR)
Section 50.90, Entergy Operations, Inc. (Entergy) submitted a request for an amendment to the Arkansas Nuclear One, Unit 1 (ANO-1) Technical Specifications (TS) to revise the Reactor Coolant System Pressure and Temperature (P/T) Limits (TS 3.4.3); Pressurizer (TS 3.4.9);
Pressurizer Safety Valves (TS 3.4.10); and Low Temperature Overpressure Protection (LTOP)
System (TS 3.4.11) requirements (Reference 1). The proposed changes would extend the applicability of the limits from 31 Effective Full Power Years (EFPY) to 54 EFPY.
The NRC Staff has reviewed the submittal and developed a request for additional information.
This request was provided via Reference 2. The purpose of this submittal is to provide the requested information. to this letter contains proprietary information - Attachment I is withheld from public disclosure per 10 CFR 2.390.
1 CAN021502 Page 2 of 3 AREVA document ANP-3300Q1 P, Revision 0, "Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1," has been prepared with the responses to the request. The information contained in the AREVA document is considered proprietary to AREVA. Attachment 1 is the proprietary version of the document. A non-proprietary version of the AREVA document is included in Attachment 2. AREVA requests that the proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390. AREVA has provided Entergy with authorization to provide the proprietary information.
An affidavit by the information owner, AREVA, supporting the request for non-disclosure is provided in Attachment 3. Therefore, Entergy requests that Attachment 1 of this submittal be withheld from public disclosure in accordance with 10 CFR 2.390.
With respect to the original Entergy request, the change included in this letter has been evaluated and Entergy has determined that the changes do not invalidate the assessment of the no significant hazards consideration included in the reference letter.
In accordance with 10 CFR 50.91 (b)(1), a copy of this application is being provided to the designated Arkansas state official.
No new commitments have been identified in this letter.
If you have any questions or require additional information, please contact Stephenie Pyle at 479-858-4704.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on February 6, 2015.
Sincerely, JGB/rwc Attachments
- 1.
AREVA document ANP-3300Q1 P, "Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1,"
PROPRIETARY
- 2.
AREVA document ANP-3300Q1 NP, "Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1,"
NON-PROPRIETARY
- 3.
Affidavit Attachment I to this letter contains proprietary information - Attachment I is withheld from public disclosure per 10 CFR 2.390.
1 CAN021502 Page 3 of 3 cc:
Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission, Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 NRC Senior Resident Inspector Arkansas Nuclear One P.O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Ms. Andrea E. George MS O-8B1 One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. Bernard R. Bevill Arkansas Department of Health Radiation Control Section 4815 West Markham Street Slot #30 Little Rock, AR 72205 to this letter contains proprietary information - Attachment I is withheld from public disclosure per 10 CFR 2.390.