Request for Withholding Information from Public Disclosure
ML23066A047
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/05/2023
From: Thomas Wengert
Plant Licensing Branch IV
To:
Entergy Operations
Wengert T
References
EPID L-2023-LLR-0000
Download: ML23066A047 (4)


Text

April 5, 2023

ANO Site Vice President Arkansas Nuclear One Entergy Operations, Inc.

1448 S.R. 333 Russellville, AR 72802

SUBJECT:

ARKANSAS NUCLEAR ONE, UNIT 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISC LOSURE (EPID L-2023-LLR-0000)

Dear Sir or Madam:

By letter dated January 20, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23020A940), you submitt ed an affidavit dated December 15, 2022, executed by Gayle Elliott from Framatome, Inc. (Framatome), requesting that the information from the following documents, contained in enclosure 1 of the letter dated January 20, 2023, be withheld from public disclosure pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR):

Enclosure 1, Attachment 1, Calculation Summary Sheet 32-9352239-001, IDTB [Inside Diameter Temper Bead] Weld Anomaly Assessment at CEDM

[Control Element Drive Mechanism] Nozzle No. 46 at ANO-2 [Arkansas Nuclear One, Unit 2], December 2022

Enclosure 1, Attachment 2, Calculation Summary Sheet 32-9352384-001, ANO-2 RVCH [Reactor Vessel Closure Head] CEDM Penetration No. 46 IDTB Repair As-Left J-Groove Weld Analysis, December 2022

Enclosure 1, Attachment 3, Engineering Information Record 51-9338948-001, Corrosion Evaluation of ANO-2 RVCH CEDM IDTB Weld Nozzle Penetration Repair, November 2021

Enclosure 1, Attachment 4, Engineering Information Record 51-9352242-000, ANO-2 CEDM Penetration 46 Modification Assessment Summary, December 2022

Enclosure 1, Attachment 5, Calculation Summary Sheet 32-9348826-002, ASME [American Society of Mechanical Engineers] Section III Stress & Fatigue Analysis for ANO-2 CEDM Half Nozzle Repair (Penetration 46),

December 2022

Enclosure 1, (Extract from) Technical Report ANP-4023, Revision 0, Arkansas Nuclear One, Unit 2 Relief Request for Half-Nozzle Repair of RVCH Penetration

  1. 46, December 2022 (full report submitted in Enclosure 1 by supplemental letter dated March 29, 2023 (ML23088A214)).

A non-proprietary version of enclosure 1, contained in enclosure 2 of the letter dated January 20, 2023, and Technical Report ANP-4023, Revision 0, contained in enclosure 2 of the letter dated March 29, 2023, have been placed in the U.S. Nuclear Regulatory Commissions (NRCs) Public Document Room and added to the NRC Library in ADAMS at the above referenced Accession Nos. ML23020A940 and ML23088A214, respectively.

The Framatome affidavit stated, in part, that t he information should be considered exempt from mandatory public disclosure for the following reasons:

6. (c) The information includes test data or analytical techniques concerning a process, methodology, or component, the application of which results in a competitive advantage for Framatome.
6. (d) The information reveals certain distinguishing aspects of a process, methodology, or component, the exclusive use of which provides a competitive advantage for Framatome in product optimization or marketability.
6. (e) The information is vital to a competitive advantage held by Framatome, would be helpful to competitors to Framatome, and would likely cause substantial harm to the competitive position of Framatome.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all revi ew situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-4037 or by email at Thomas.Wengert@nrc.gov.

Sincerely,

/RA/

Thomas J. Wengert, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Docket No. 50-368

cc: Gayle Elliott Licensing and Regulatory Affairs Framatome Inc.

3315 Old Forest Road Lynchburg, VA 24501

Listserv

ML23066A047 *by email OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DNRL/NPHP/BC*

NAME TWengert PBlechman MMitchell DATE 4/5/2023 4/4/2023 3/10/2023 OFFICE NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*

NAME JDixon-Herrity TWengert DATE 4/5/2023 4/5/2023