|
---|
Category:Legal-Affidavit
MONTHYEAR1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) ML23020A9442023-01-20020 January 2023 Enclosure 3: Affidavit 2CAN122103, Relief Request ANO2-RR-21-002, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Submittal of Analyses - Affidavits and Calculation Summary Sheet2021-11-19019 November 2021 Relief Request ANO2-RR-21-002, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 - Submittal of Analyses - Affidavits and Calculation Summary Sheet 2CAN102102, Relief Request ANO2-R&R-012: Support the Repair of the Reactor Vessel Closure Head Penetration 462021-10-10010 October 2021 Relief Request ANO2-R&R-012: Support the Repair of the Reactor Vessel Closure Head Penetration 46 0CAN092101, Unit 2 - Revised Proprietary Demarcation in Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping2021-09-14014 September 2021 Unit 2 - Revised Proprietary Demarcation in Response to Request for Additional Information (Follow-up) - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping 0CAN052103, Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency .2021-05-25025 May 2021 Presentation Information for Pre-Submittal Meeting Regarding the Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency . 0CAN022101, Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping2021-02-22022 February 2021 Response to Request for Additional Information - Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of Emergency Cooling Pond Supply Piping 2CAN032001, Response to Request for Additional Information Related to License Amendment Request to Revise the Control Element Assembly Drop Times2020-03-11011 March 2020 Response to Request for Additional Information Related to License Amendment Request to Revise the Control Element Assembly Drop Times 1CAN121601, Arkansas Nuclear One Unit 1, Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan2016-12-21021 December 2016 Arkansas Nuclear One Unit 1, Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan 1CAN121601, Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan2016-12-21021 December 2016 Update to Evaluations Described Response to Request for Additional Information 14(a) Reactor Vessel Internals Aging Management Program Plan 1CAN121502, Evaluations Described Response to Requests for Additional Information 3, 5, 6(a), and 7, Reactor Vessel Internals Aging Management Program Plan2015-12-30030 December 2015 Evaluations Described Response to Requests for Additional Information 3, 5, 6(a), and 7, Reactor Vessel Internals Aging Management Program Plan ML15278A0242015-09-28028 September 2015 Attachment 2, Areva Document ANP-3417NP, Revision 0, MRP-227-A Applicant / Licensee Action Item No. 7 Analysis for Arkansas Nuclear One, Unit 1 (Non-Proprietary), Attachment 3, Affidavit, and Attachment 4, List of Commitments 2CAN051504, Revised Affidavit for Request for Relief ANO2-ISI-0162015-05-19019 May 2015 Revised Affidavit for Request for Relief ANO2-ISI-016 1CAN031504, Arkansas Nuclear One, Unit 1 - Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2015-03-25025 March 2015 Arkansas Nuclear One, Unit 1 - Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits 1CAN031504, Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits2015-03-25025 March 2015 Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits ML15041A0742015-02-0606 February 2015 ANP-3300Q1NP, Rev. 0, Response to Request for Additional Information on Reactor Coolant System Pressure/Temperature and Low Temperature Overpressure Protection System Limits to 54 EFPY for Arkansas Nuclear One, Unit 1, Attachment 2 to 1CAN0 2CAN111402, Unit 2, Revised Affidavit for Request for Relief ANO2-ISI-0162014-11-11011 November 2014 Unit 2, Revised Affidavit for Request for Relief ANO2-ISI-016 2CAN041402, Successive Examination Plans, Request for Relief ANO2-ISI-016. Weld Scan Plans & Preliminary Coverage Estimates, Pdqs Number 783 & Affidavit Enclosed2014-04-15015 April 2014 Successive Examination Plans, Request for Relief ANO2-ISI-016. Weld Scan Plans & Preliminary Coverage Estimates, Pdqs Number 783 & Affidavit Enclosed 0CAN041401, NRC Augmented Inspection Team Follow-up Inspection Report 05000313/2013012 and 05000368/2013012; Preliminary Red and Yellow Findings2014-04-0101 April 2014 NRC Augmented Inspection Team Follow-up Inspection Report 05000313/2013012 and 05000368/2013012; Preliminary Red and Yellow Findings 0CAN071303, Units 1 and 2, Augmented Inspection Team Information Request2013-07-31031 July 2013 Units 1 and 2, Augmented Inspection Team Information Request ML12038A1772012-02-0303 February 2012 Units 1 and 2, HI-STORM 100 Cask System, Thermal Validation Test Using Air Mass Flow Rate ML0935005322009-12-11011 December 2009 Affidavit from Gayle F. Elliot, Manager of Product Licensing for Areva, Np Inc ML0828300342008-08-20020 August 2008 Affidavit of Gayle F. Elliott, for Areva Np Inc., Regarding NRC Presentation of August 2008 ML0627703182006-09-28028 September 2006 Transmittal of Draft Slide Presentation for Nrc/Entergy/Westinghouse Pre-Submittal Meeting (Proprietary/Non-Proprietary) ML0514603882005-05-10010 May 2005 Units 1 and 2, Request for Additional Information Concerning Request for Exemption from Holtec International Certificate of Compliance 2CAN010402, Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection2004-01-16016 January 2004 Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection ML15350A2151985-09-0505 September 1985 Overview Description of Core Operating Limit Supervisory System (Colss)(Rev 00-NP to CEN-312-NP) 2023-06-08
[Table view] Category:Letter type:
MONTHYEAR2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol 2CAN012403, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42024-01-11011 January 2024 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN012401, Registration of Cask Use2024-01-10010 January 2024 Registration of Cask Use 1CAN122301, Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037)2023-12-14014 December 2023 Responses to Request for Additional Information for Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISl-037) 2CAN112302, Submittal of Amendment 31 to Safety Analysis Report2023-11-16016 November 2023 Submittal of Amendment 31 to Safety Analysis Report 0CAN102303, Registration of Cask Use2023-10-24024 October 2023 Registration of Cask Use 0CAN102302, (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 32023-10-11011 October 2023 (ANO) Emergency Plan Revision 49 and Emergency Plan On-Shift Staffing Analysis Revision 3 0CAN102301, Evacuation Time Estimate (ETE) Study2023-10-0404 October 2023 Evacuation Time Estimate (ETE) Study 1CAN092301, Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-09-21021 September 2023 Supplemental Information - Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN092302, Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2023-09-14014 September 2023 Supplement to Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 2CAN092301, Reply to a Notice of Violation2023-09-0808 September 2023 Reply to a Notice of Violation 0CAN092301, Emergency Plan Implementing Procedure Revision2023-09-0505 September 2023 Emergency Plan Implementing Procedure Revision 0CAN082301, Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 03412023-08-17017 August 2023 Units 1 and 2 - Changes to the Quality Assurance Program Approval Form for Radioactive Material Package No. 0341 2CAN082301, Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29)2023-08-10010 August 2023 Inservice Inspection Summary Report for the Arkansas Nuclear One, Unit 2, Twenty-Ninth Refueling Outage (2R29) 0CAN072301, Registration of Cask Use2023-07-18018 July 2023 Registration of Cask Use 1CAN062304, Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2023-06-29029 June 2023 Supplement Related to License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 0CAN062301, Status of Actions to Return to Compliance2023-06-26026 June 2023 Status of Actions to Return to Compliance 0CAN062302, Submittal of Revision 22 of the ANO Fire Hazards Analysis2023-06-20020 June 2023 Submittal of Revision 22 of the ANO Fire Hazards Analysis 1CAN062301, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037)2023-06-0808 June 2023 Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Interval (ANO1-ISI-037) 0CAN052303, Annual 10 CFR 50.46 Report for Calendar Year 20222023-05-24024 May 2023 Annual 10 CFR 50.46 Report for Calendar Year 2022 0CAN052302, Emergency Plan Rev. 482023-05-11011 May 2023 Emergency Plan Rev. 48 0CAN052301, Units 1 and 2 - Annual Radiological Environmental Operating Report for 20222023-05-0909 May 2023 Units 1 and 2 - Annual Radiological Environmental Operating Report for 2022 2CAN052301, Cycle 30 Core Operating Limits Report (COLR)2023-05-0303 May 2023 Cycle 30 Core Operating Limits Report (COLR) 0CAN042302, Annual Occupational Radiation Exposure Report for 20222023-04-27027 April 2023 Annual Occupational Radiation Exposure Report for 2022 0CAN042301, Radioactive Effluent Release Report for 20222023-04-14014 April 2023 Radioactive Effluent Release Report for 2022 2CAN042301, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42023-04-0505 April 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 1CAN032301, License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure2023-03-30030 March 2023 License Amendment Request to Modify the Arkansas Nuclear One, Unit 1, Technical Specification 3.3.1, Reactor Protection System Instrumentation, Turbine Trip Function on Low Control Oil Pressure 2CAN032303, Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Responses to Request for Additional Information Concerning the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032304, Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-03-29029 March 2023 Supplement to the Request for Alternative Regarding the Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 2CAN032305, 03 Post Examination Analysis2023-03-23023 March 2023 03 Post Examination Analysis 1CAN032302, Inspection Summary Report for the Thirtieth Refueling Outage (1R30)2023-03-20020 March 2023 Inspection Summary Report for the Thirtieth Refueling Outage (1R30) 1CAN012301, Responses to Request for Additional Information for Request for Relief ANO1-ISI-0352023-01-30030 January 2023 Responses to Request for Additional Information for Request for Relief ANO1-ISI-035 2CAN012303, U.S. Additional Protocol2023-01-23023 January 2023 U.S. Additional Protocol 2CAN012302, Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 462023-01-20020 January 2023 Relief Request ANO2-RR-23-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 46 1CAN122201, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 42022-12-22022 December 2022 License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4 0CAN122202, Registration of Cask Use2022-12-21021 December 2022 Registration of Cask Use 0CAN122201, Reply to a Notice of Violation; EA-22-0992022-12-0808 December 2022 Reply to a Notice of Violation; EA-22-099 0CAN112201, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002)2022-11-10010 November 2022 Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (ANO-CISI-002) 1CAN102202, Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation2022-10-31031 October 2022 Application to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation 1CAN102203, Cycle 31 Core Operating Limits Report2022-10-24024 October 2022 Cycle 31 Core Operating Limits Report 1CAN102201, Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-10-13013 October 2022 Supplement to Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 0CAN092201, Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-09-29029 September 2022 Supplement to License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN092201, Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-09-0808 September 2022 Supplement to Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 0CAN082201, License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements2022-08-30030 August 2022 License Amendment Request for Approval of Changes to the Emergency Plan Staffing Requirements 1CAN082201, Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period2022-08-24024 August 2022 Request for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fifth 10-Year Interval, First Period 2CAN072201, Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods2022-07-20020 July 2022 Response to Request for Additional Information Requests for Relief from American Society of Mechanical Engineers Section XI Volumetric Examination Requirements - Fourth 10-Year Interval, Second and Third Periods 0CAN072201, Registration of Cask Use2022-07-14014 July 2022 Registration of Cask Use 0CAN062202, Registration of Cask Use2022-06-0909 June 2022 Registration of Cask Use 1CAN062201, Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations2022-06-0202 June 2022 Response to the Request for Additional Information Proposed Technical Specifications 3.4.12 and 3.4.13 Revised Dose Calculations 1CAN052201, Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-0352022-05-31031 May 2022 Request for Relief Related to American Society of Mechanical Engineers (ASME) Code Case N-729-6 Augmented Examination Requirements ANO1-ISI-035 2024-01-17
[Table view] Category:Proprietary Information Review
MONTHYEARML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23066A0472023-04-0505 April 2023 Request for Withholding Information from Public Disclosure ML22305A5632022-11-28028 November 2022 Request for Withholding Information from Public Disclosure ML22070B1282022-03-21021 March 2022 Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 2 ML21298A0582021-10-28028 October 2021 Request for Withholding Information from Public Disclosure ML21195A0392021-09-0202 September 2021 Request for Withholding Proprietary Information from Public Disclosure for X-Energy, LLC Regulatory Engagement Plan Update for the XE-100 Reactor ML21145A0042021-06-28028 June 2021 Request for Withholding Information from Public Disclosure ML20293A1842020-11-0404 November 2020 Request for Withholding Information from Public Disclosure ML17032A3902017-02-16016 February 2017 Request for Withholding Information from Public Disclosure ML16321A0862016-11-29029 November 2016 Request for Withholding Information from Public Disclosure ML16039A0202016-02-16016 February 2016 Request for Withholding Information from Public Disclosure ML15148A2022015-05-29029 May 2015 Request for Withholding Information from Public Disclosure - 4/17/15 Affidavit Executed by N. Wilmshurst, Electric Power Research Institute EPRI Report 1015133 Dated March 2014, Relief Request ANO2-ISI-016 ML15139A0022015-05-20020 May 2015 Request for Withholding Information from Public Disclosure, 1/25/15 Affidavit Executed by G. Elliot, Areva Inc. ANP-3281Q1P, Revision 0, Response to NRC Request for Additional Information on Time-Limited Aging Analysis ML15096A0142015-04-20020 April 2015 Request for Withholding Information from Public Disclosure - 3/26/15 Affidavit Executed by G. Elliott, Areva Inc.; ANP-3300Q3P and Document No. 32-9220706-002 RCS Pressure/Temperature Amendment Request ML15072A0772015-04-0202 April 2015 Request for Withholding Information from Public Disclosure - 2/6/15 Affidavit Executed by G. Elliott, Areva Inc. ANP-3300Q1P, February 2015 Related to RCS Pressure/Temperature License Amendment Request ML15072A0792015-03-26026 March 2015 Request for Withholding Information from Public Disclosure - 3/9/15 Affidavit Executed by A. Meginnis, Areva Inc. ANP-3300Q2P, March 2015 Related to RCS Pressure/Temperature License Amendment Request ML15051A4182015-02-24024 February 2015 Request for Withholding Information from Public Disclosure - 2/9/15 Affidavit Executed by G. Elliott, Areva, Inc., ANP-3383P, Revision 0 ML14303A0262014-10-29029 October 2014 Letter to K. Manzione Holtec International Request for Withholding Information from Public Disclosure (TAC No. L24954) ML14169A5092014-08-0707 August 2014 Request for Withholding Information from Public Disclosure, 3/25/14 Affidavit Executed by G. Elliot, Areva Inc. Regarding Time-Limited Aging Analysis ML13129A3462013-06-12012 June 2013 Request for Withholding Information from Public Disclosure - 10/31/12 Affidavit Executed by J. Gresham, Westinghouse Re Calculation Note CN-MRCDA-12-27, Revision 1 ML12314A0602012-12-11011 December 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 9/4/2012, Executed by Marcos Legaspi Herrera of Structural Integrity Associates, Inc. Re Second RAI Response ML12314A0492012-12-11011 December 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 8/16/12, Executed by J. Gresham of Westinghouse Electric Company LLC, Re CN-MRCDA-12-27 ML1018103372010-07-29029 July 2010 Request for Withholding Information from Public Disclosure ML1018103452010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-18, Revision 0 ML1018103312010-07-29029 July 2010 Request for Withholding Information from Public Disclosure ML1018102332010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-57, Revision 0 ML1018102262010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-17, Revision 0 ML1018102242010-07-29029 July 2010 Request for Withholding Information from Public Disclosure, 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-16, Revision 0, TAC No. ME3678 ML1018102182010-07-29029 July 2010 Request for Withholding Information from Public Disclosure, 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-15, Revision 0, TAC No. ME3678 ML1012604132010-05-13013 May 2010 Request for Withholding Information from Public Disclosure - Affidavit Executed by Gayle Elliott, Areva Np Inc. on April 9, 2010 ML1010406012010-05-13013 May 2010 Request for Withholding Information from Public Disclosure - Affidavit Executed by M. Taylor, Structural Integrity Associates on 4/9/2010 ML0935201042010-01-0505 January 2010 Request for Withholding Information from Public Disclosure - 12/11/2009 Affidavit Executed by G. Elliott, Areva Np Re 12/15/09 Entergy Meeting Slides ML0932004602009-11-23023 November 2009 Request for Withholding Information from Public Disclosure - 8/3/2009 Affidavit Executed by J. Gresham, Westinghouse ML0730502932007-12-0606 December 2007 Request for Withholding Information from Public Disclosure Holtec Report No. HI-2063601 (Tac No. MD4994) ML0725702582007-11-0505 November 2007 Entergy Operations, Inc. Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 2, Re LAR to Support Partial Rerack/Revised Loading Patterns, Spent Fuel Pool ML0717603002007-07-0909 July 2007 Entergy Operations, Inc. Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 2 (Tac No. MD4994) ML0711400242007-05-0101 May 2007 (Ano), Unit 2 - Request for Withholding Information from Public Disclosure ML0629100182006-10-31031 October 2006 Request for Withholding Information from Public Disclosure ML0528002642005-09-26026 September 2005 Holtec International, Request for Withholding Information from Public Disclosure for ANO, Unit 2 ML0509605752005-04-0606 April 2005 Framatome Anp, Request for Withholding Information from Public Disclosure for Ano. Unit 2 ML0418902682004-07-0606 July 2004 7/6/04, ANO1 - Framatome Anp (Fanp), Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 1 ML0404904952004-02-11011 February 2004 Westinghouse Electric Company, Withholding from Public Disclosure, Wesdyne Reports WDI-TJ-001-02-P, Revision 3, WDI-TJ-012-03-P, Revision 2, WDI-TJ-006-03-P, Revision 3 2CAN010402, Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection2004-01-16016 January 2004 Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection ML0327700102003-10-0202 October 2003 Proprietary Information Review, Material Properties and Modeling Methods Used in ANO Unit 2 Welding Residual Stress Analyses ML0217602842002-07-11011 July 2002 Withholding from Public Disclosure, Wesdyne Report WDI-TJ-007-02-P, (TACs MB4524 & MB4525) 2023-07-12
[Table view] |
Text
Ent-r y. Operations, Inc.
Entergy pEntergy 0
1448S.R.333
~~~~~~~~~~~~~~~~~~~~~~
AR 72802 Tel 501 858 5000 Proprietary Information Enclosed 2CAN010402 January 16, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Arkansas Nuclear One, Unit 2 Docket No. 50-368 License No. NPF-6 Revisions to WesDyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection
REFERENCES:
I Entergy letter dated August 2, 2003, Response to Request forAdditional Information on Relaxation frorn Performing a Bare Metal Visual Inspection on the ANO-2 Reactor Vessel Head (2CAN080302) 2 Entergy letter dated August 2, 2003, Westinghouse Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection on Arkansas Nuclear One, Unit 2 (2CAN080303)
Dear Sir or Madam:
In Reference 1, Entergy provided non-proprietary versions of three WesDyne technical reports in support of a relaxation to Order EA-03-009 that requests alternative inspections in lieu of bare metal visual inspection on the Arkansas Nuclear One, Unit 2 (ANO-2) reactor vessel head. The proprietary versions of these reports were provided in Reference 2. It was subsequently determined that certain portions of the reports required revision. All changes in the reports either correct inconsistent labeling or remove the proprietary status of some information that was previously designated as proprietary. There are no technical changes to the subject reports. The revised non-proprietary versions of the WesDyne reports are contained in Enclosures 2, 3, and 4. The proprietary versions of these reports are contained in Enclosures 5, 6, and 7. A new Westinghouse affidavit is contained in Enclosure 1 which requests the proprietary information to be withheld from public disclosure in accordance with 10CFR2.790(b)(4).
2CAN01 0402 Page 2 The response to this RAI does not resutt In any new commitments by Entergy. If you have any questions or require additional information, please contact Steve Bennett at 479-858-4626.
Sincerely, Sherrie R Cotton Director, Nuclear Safety Assurance SRC/sab Enclosures
- 1. Westinghouse Affidavit to Request Withholding of Information from Public Disclosure 2: WesDyne Report WDI-TJ-001 NP, Rev 2, Detection of Reactor Head Base Metal Loss from Inside the CRDM (Non-Proprietary) 3: WesDyne Report WDI-TJ-01 2-03-NP, Rev. 2, Tiple Point Inspection using TOFD Ultrasonic Methods (Non-Proprietary) 4: WesDyne Report WDI-TJ-006-03-NP, Rev 3, UT of Interference Fit Samples for Leak Path (Non-Proprietary) 5: WesDyne Report WDI-TJ-001-02-P, Rev 3, Detection of Reactor Head Base Metal Loss from Inside the CRDM (Proprietary) 6: WesDyne Report WDI-TJ-01 2-03-P, Rev. 2, Triple Point Inspection using TOFD Ultrasonic Methods (Proprietary) 7: WesDyne Report WDI-TJ-006-03-P, Rev 3, UT of Interference Fit Samples for Leak Path (Proprietary)
2CAN010402 Page 3 cc: Dr. Bruce Mallet Regional Administrator U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310 London, AR 72847 U. S. Nuclear Regulatory Commission Attn: Mr. Thomas W. Alexion MS 0-7D1 Washington, DC 20555-0001 Mr. Bernard R. Bevill Director Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street Little Rock, AR 72205
Enclosure I 2CAN010402 Westinghouse Affidavit to Request Withholding of Information from Public Disclosure
a estinghouse W Westinghouse Electric Company Nuclear Services P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission Direct tel: (412) 374-5282 Document Control Desk Direct fax: (412) 374-4011 Washington, DC 20555-0001 e-mail: Sepplhaewestinghouse.com Our ref: CAW-03-1725 October 24, 2003 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DISCLOSURE
Subject:
Submittal of WesDyne International LLC Reports
- 1. WDI-TJ-001-02-P, Rev. 3, "Detection of Reactor Head Base Metal Loss from Inside that CRDM Penetration" (Proprietary)
- 2. WDI-TI-006-03-P, Rev. 3, "Ultrasonic Testing of Interference Fit Samples for Leak Path Detection" (Proprietary)
- 3. WDI-TJ-012-03-P, Rev. 2, "Triple Point Inspection using TOFD Ultrasonic Methods" (Proprietary)
Reference:
Letter CARC2-03-33, "Transmittal of Alloy 600 Documentation," October 21, 2003.
The proprietary information for which withholding is being requested in the above-referenced report is further identified in Affidavit CAW-03-1725 signed by the owner of the proprietary information, Westinghouse Electric Company LLC. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.790 of the Commission's regulations.
Accordingly, this letter authorizes the utilization of the accompanying affidavit by Entergy Nuclear South.
Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-03-1725 and should be addressed to the undersigned.
Very truly yours, J. aembshActing
. Manager Regulatory Compliance and Plant Licensing Enclosures cc: J. Dyer D. Holland B. Benney E. Peyton A BNFL Group company
CAW-03-1725 bcc: H. A. Sepp (ECE 4-7A) IL R. Bastien, IL, IA (Nivelles, Belgium)
C. Brinknan, IL, IA (Westinghouse Electric Co., 12300 Twinbrook Parkway, Suite 330, Rockville, MD 20852)
RCPL Administrative Aide (ECE 4-7A) IL, IA (letter and affidavit only)
A BNFL Group company
CAW-03-1725 AFFIDAVIT COMMONWEALTH OF PENNSYLVANIA:
ss COUNTY OF ALLEGHENY:
Before me, the undersigned authority, personally appeared J. S. Galembush, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Company LLC ("Westinghouse"), and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, information, and belief:
J. S. Galembush, Acting Manager Regulatory Compliance and Plant Licensing Sworn to and subscribed before me this of g ,2003 2,~~c Notary Public
~~~~~gu4 ~~~~Sew 8tW=LFiAdNftayPmub 0fdoE~q*s w&Uq~y29,2007 Mfmnber Pennsyvanla Assodafio OrMo~ees
2 CAW-03-1725 (1) I am Acting Manager, Regulatory Compliance and Plant Licensing, in Nuclear Services, Westinghouse Electric Company LLC ("Westinghouse"), and as such, I have been specifically delegated the function of reviewing the proprietary information sought to be withheld from public disclosure in connection with nuclear power plant licensing and rule making proceedings, and am authorized to apply for its withholding on behalf of the Westinghouse Electric Company LLC.
(2) I am making this Affidavit in conformance with the provisions of 10 CFR Section 2.790 of the Commission's regulations and in conjunction with the Westinghouse application for withholding accompanying this Affidavit.
(3) I have personal knowledge of the criteria and procedures utilized by the Westinghouse Electric Company LLC in designating information as a trade secret, privileged or as confidential commercial or financial information.
(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.790 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the information sought to be withheld from public disclosure should be withheld.
(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghouse.
(ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public. Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilizes a system to determine when and whether to hold certain types of information in confidence. The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.
Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential competitive advantage, as follows:
(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of
3 CAW-03-1725 Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.
(c) Its use by a competitor would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.
(d) It reveals cost or price information, production capacities, budget levels, or commercial strategies of Westinghouse, its customers or suppliers.
(e) It reveals aspects of past, present, or future Westinghouse or customer funded development plans and programs of potential commercial value to Westinghouse.
(f) It contains patentable ideas, for which patent protection may be desirable.
There are sound policy reasons behind the Westinghouse system which include the following:
(a) The use of such information by Westinghouse gives Westinghouse a competitive advantage over its competitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position.
(b) It is information that is marketable in many ways. The extent to which such information is available to competitors diminishes the Westinghouse ability to sell products and services involving the use of the information.
(c) Use by our competitor would put Westinghouse at a competitive disadvantage by reducing his expenditure of resources at our expense.
4 CAW-03-1725 (d) Each component of proprietary information pertinent to a particular competitive advantage is potentially as valuable as the total competitive advantage. If competitors acquire components of proprietary information, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive advantage.
(e) Unrestricted disclosure would jeopardize the position of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition of those countries.
(f) The Westinghouse capacity to invest corporate assets in research and development depends upon the success in obtaining and maintaining a competitive advantage.
(iii) The information is being transmitted to the Commission in confidence and, under the provisions of 10 CFR Section 2.790, it is to be received in confidence by the Commission.
(iv) The information sought to be protected is not available in public sources or available information has not been previously employed in the same original manner or method to the best of our knowledge and belief.
(v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in WDI-TJ-001 P, Rev. 3, "Detection of Reactor Head Base Metal Loss from Inside that CRDM Penetration" (Proprietary), dated 9/12/03 and WDI-TJ-006-03-P, Rev. 3, "Ultrasonic Testing of Interference Fit Samples for Leak Path Detection" (Proprietary), dated 8/14/03, WDI-TJ-012-03-P, Rev. 2, "Triple Point Inspection using TOFD Ultrasonic Methods" (Proprietary), dated 9/23/03 and being transmitted by Entergy Nuclear South letter and Application for Withholding Proprietary Information from Public Disclosure, to the Document Control Desk. The proprietary information as submitted for use by Westinghouse Electric Company LLC for ANO Unit 2 and Waterford Unit 3 is expected to be applicable for other licensee submittals in response to certain NRC requirements for justification of non-destructive examination techniques.
5 CAW-03-1725 This information is part of that which will enable Westinghouse to:
(a) Detect metal loss of the reactor head.
(b) Test interference fit samples for leak path detection.
(c) Detection of PWSCC-type indications.
Further this information has substantial commercial value as follows:
(a) Westinghouse plans to sell the use of similar information to its customers for purposes of reactor head inspection.
(b) Westinghouse can sell support and defense of inspection results.
(c) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
Public disclosure of this proprietary information is likely to cause substantial harm to the competitive position of Westinghouse because it would enhance the ability of competitors to provide similar examinations and licensing defense services for commercial power reactors without commensurate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC requirements for licensing documentation without purchasing the right to use the information.
The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.
In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended.
Further the deponent sayeth not.
PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary and/or non-proprietary versions of documents furnished to the NRC in connection with requests for generic and/or plant-specific review and approval.
In order to conform to the requirements of 10 CFR 2.790 of the Commission's regulations concerning the protection of proprietary information so submitted to the NRC, the information which is proprietary in the proprietary versions is contained within brackets, and where the proprietary information has been deleted in the non-proprietary versions, only the brackets remain (the information that was contained within the brackets in the proprietary versions having been deleted). The justification for claiming the information so designated as proprietary is indicated in both versions by means of lower case letters (a) through (e) located as a superscript immediately following the brackets enclosing each item of information being identified as proprietary or in the margin opposite such information. These lower case letters refer to the types of information Westinghouse customarily holds in confidence identified in Sections (4)(ii)(a) through (4Xii)(f) of the affidavit accompanying this transmittal pursuant to 10 CFR 2.790(b)( 1).
COPYRIGHT NOTICE The reports transmitted herewith each bear a Westinghouse copyright notice. The NRC is permitted to make the number of copies of the information contained in these reports which are necessary for its internal use in connection with generic and plant-specific reviews and approvals as well as the issuance, denial, amendment, transfer, renewal, modification, suspension, revocation, or violation of a license, permit, order, or regulation subject to the requirements of 10 CFR 2.790 regarding restrictions on public disclosure to the extent such information has been identified as proprietary by Westinghouse, copyright protection notwithstanding. With respect to the non-proprietary versions of these reports, the NRC is permitted to make the number of copies beyond those necessary for its internal use which are necessary in order to have one copy available for public viewing in the appropriate docket files in the public document room in Washington, DC and in local public document rooms as may be required by NRC regulations if the number of copies submitted is insufficient for this purpose. Copies made by the NRC must include the copyright notice in all instances and the proprietary notice if the original was identified as proprietary.