ML16264A363: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 9: Line 9:
| docket = 05000489, 05000499
| docket = 05000489, 05000499
| license number = NPF-076, NPF-080
| license number = NPF-076, NPF-080
| contact person = Regner L M
| contact person = Regner L
| case reference number = CAC MF8280, CAC MF8281
| case reference number = CAC MF8280, CAC MF8281
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs
| document type = Meeting Briefing Package/Handouts, Slides and Viewgraphs

Revision as of 22:21, 19 June 2019

09/20/2016 Pre-Application Public Meeting for Proposed License Amendment Request to Revise the Stpegs Emergency Plan Staff Augmentation Times
ML16264A363
Person / Time
Site: South Texas, Perkins  Duke Energy icon.png
Issue date: 09/20/2016
From:
South Texas Association for Responsible Energy
To:
Division of Operating Reactor Licensing
Regner L
References
CAC MF8280, CAC MF8281
Download: ML16264A363 (14)


Text

Pre-Application Public Meeting for Proposed License Amendment Request to Revise theSTPEGS Emergency Plan Staff Augmentation Times September 20, 2016 IntroductionsMike Murray

-Regulatory Affairs ManagerJoe Enoch-Supervisor, Emergency PlanningStephanie Rodgers

-Staff, Emergency PlanningKathleen Van Daalen

-Staff, Licensing 2

Desired OutcomesCommunicate the content of the planned submittalProvide a common understanding of the planned submittal 3

4Proposed ChangesIncreases the STPEGS (STP) Emergency Plan staff augmentation times from 60 and 75 minutes to 90 minutes.-Increases the required augmentation time for Emergency Response Organization members to respond to their facility

-Expands eligible pool of personnel to fill critical Emergency Response Organization positions, adding valuable technical expertise and defense in depth

-Increases Emergency Response Facilities activation timesThe proposed changes considered the guidance of RIS 2016-10 Regulatory ComplianceApplicable Regulatory Documents10 CFR 50.47(b)(2)10 CFR 50.54(q)10 CFR 50.90 NUREG-0654 NUREG-0737RG 1.219RG 1.101RIS 2016-10Referenced in LAR SubmittalPlanning Standard (ERO)Prior Approval (Example 1.219)License Request (required)Guidance (Basis for Plan)STA (Engineering On

-shift)Guidance for Changes (50.54q)Endorsement (NUREG-0654) Expectation (Staff)5 Comparison (RIS

-STP LAR)RIS 2016-10Current License BasisFukushima (FLEX)NUREG-0654 Staffing

-Major Functions

-Technology

-Table B-1, 60-90 MinuteOffsite Agency ImpactSTP Submittal 6May 20, 1993No credit takenStaffing > NUREG

-0654-Identified

-Described-DefinedState/County Concurrence Comparison (RIS

-STP LAR)RIS 2016-10Major Functional TasksNotification and CommunicationEmergency DirectorOff-site Surveys / On

-site (out-of-plant) / In

-Plant SurveysChemistry/Radio

-chemistryTechnical SupportRepair and Corrective ActionsRadiation ProtectionDose AssessmentSTP Submittal 7Details2 Dedicated on

-shift ( RO & NLO)2 Augmented at 90

-minutesDescribes personnel and technologyOn-shift staffedSTA role and technologyIdentified Staffing > NUREG

-0654Staffing and technologyOn-shift staffed Site/Program EnhancementsTechnology

-Access/Dosimetry Controls

-Area Radiation Monitors

-Dose Assessment

-Plant Computer (System status trees)

-Auto Notifications Systems

-Web EOCTraining-Licensed Operator Requalification and Simulator Modeling

-Accredited Programs (Operations, RP, Chemistry, Maintenance, Engineering)Procedures

-Symptom Based

-Initiating Events (EALs NEI 99

-01 Rev. 6)Shift Complement 8

9Staffing ChangesIncreased in 1993 to staffing of 20Currently staffed at 25

-Will remain staffed at 25Operations Staff2-SMs (ED qualified)2-SROs4-ROs4-NLOs1-STA Staffing ComparisonMajor Functional Area NUREG-0654NUREG-0654 On-shift/30/60 minutesCurrent STP Staffing On-shift/60/75 minutesProposed STP Staffing On-shift/90 minutesOperations *1. Shift Sup/Manager2. Shift Foreman/US3. RO4. Plant Operators5. STA 6.Operations Discipline Lead 1.1/0/0 2.1/0/0 3.2/0/0 4.2/0/0 5.1**/0/0 (not counted in On-shift Total) 6.None defined 1.2/0/0 2.2/0/0 3.4/0/0 4.4/0/0 5.1**/0/0 (not counted in On-shift Total)6.0/0/1#1.2/0 2.2/0 3.4/0 4.4/0 5.1**/0 (not counted in On-shift Total)6.0/1#Emergency Direction and Control***

(STA, SS, or Facility Director)1**/0/0 (not counted in On-shift Total)2**/0/0 (not counted in On-shift Total)2**/0 (not counted in On-shift Total)Notification

/Communication1/1/22/0/22/210* Unaffected Unit in operation maintain shift foreman, 1

-RO, 1-NLO**May be provided by shift personnel assigned other functions

      • Assumed by EOF Director when all facilities are manned# Filled by personnel with plant operations experience Major Functional Area NUREG-0654NUREG-0654 On-shift/30/60 minutesCurrent STP Staffing On-shift/60/75 minutesProposed STP Staffing On-shift/90 minutesRadiological AssessmentEmergency DirectorSenior HP Expertise Offsite/Onsite surveysChemistry/Radio

-chem0/0/10/1/0 0/3/32/1/20/0/11/0/0 2/3/41/0/10/11/02**/7 1/1Engineering, Repair and Corrective Actions1. Technical Support STACore Electrical Mechanical2. Repair and Corr. ActionsRad Waste/

MechanicalElectrical/I&CI&C 1.1/0/0 0/1/0 0/0/1 0/0/1 2.1**/0/2 (not counted in On-shift total)1**/1/1 (not counted in On-shift Total)0/1/0 1.1/0/0 0/1/0 0/0/1 0/0/1 2.2**/0/0(not counted in On-shift Total) 1**/0/11**and 1/0/11/0/0 1.1/0 0/1 0/1 0/1 2.2**/0 (not counted in On-shift Total)1**/11**and1/11/0Staffing Comparison (Continued) 11** May be provided by shift personnel assigned other functions Staffing Comparison (Continued)Major Functional Area NUREG-0654NUREG-0654 On-shift/30/60 minutesCurrent STP Staffing On-shift/60/75 minutesProposed STP Staffing On-shift/90 minutesProtective Actions (In Plant) Radiation Protection HP Technicians for:

a.Access Control b.HP Coverage c.Personnel monitor d.Dosimetry 2**/2/2 (not counted in On-shift Total) 2**/4/0 (not counted in On-shift Total) 2**/4 (not counted in On-shift Total)FirefightingPer T/S / Local Support /

0Per T/S / Local Support / Local Support Per T/S / Local SupportRescue First Aid2**/ Local Support(not counted in On

-shift Total) 2**/ Local Support / Local Support2**/ Local SupportSecurity Site Access Control and Personnel AccountabilityPer Security PlanPer Security PlanPer Security PlanTotals10/11/15 = 3625/8/13 = 4625/21 = 4612** May be provided by shift personnel assigned other functions PrecedentPoint Beach Prairie IslandRAIs Reviewed13 Closing RemarksDesired OutcomeSubmittal DateSTP Point of Contact14