ML17069A256: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/13/2017
| issue date = 03/13/2017
| title = Correction to Authorization Page 2 of Amendment No. 192, Issuance of Amendment to Revise Technical Specification Surveillance Requirement 3.8.4.2
| title = Correction to Authorization Page 2 of Amendment No. 192, Issuance of Amendment to Revise Technical Specification Surveillance Requirement 3.8.4.2
| author name = Kuntz R F
| author name = Kuntz R
| author affiliation = NRC/NRR/DORL/LPLIII-1
| author affiliation = NRC/NRR/DORL/LPLIII-1
| addressee name = Gardner P A
| addressee name = Gardner P
| addressee affiliation = Northern States Power Company, Minnesota
| addressee affiliation = Northern States Power Company, Minnesota
| docket = 05000263
| docket = 05000263
| license number = DPR-022
| license number = DPR-022
| contact person = Kuntz R F
| contact person = Kuntz R
| case reference number = CAC MF7576
| case reference number = CAC MF7576
| document type = Letter
| document type = Letter
Line 24: Line 24:


==Dear Mr. Gardner:==
==Dear Mr. Gardner:==
By letter dated February 27, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17013A435) the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 192 to Renewed Facility Operating License No. DPR-22 for the Monticello Nuclear Generating Plant. The amendment consists of changes to the technical specifications (TSs) in response to your application dated April 4, 2016 (ADAMS Accession No. ML 16099A097).
By letter dated February 27, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17013A435) the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 192 to Renewed Facility Operating License No. DPR-22 for the Monticello Nuclear Generating Plant. The amendment consists of changes to the technical specifications (TSs) in response to your application dated April 4, 2016 (ADAMS Accession No. ML16099A097).
The amendment revises TSs surveillance requirement (SR) associated with TS 3.8.4, "DC [direct current] Sources -Operating." Specifically, the amendment revises SR 3.8.4.2 by increasing the 125 Volt DC battery charger test output current to 75 amperes (amps) from the current test level of 50 amps, and removes the second (alternate) method specified to perform the SR. Amendment No. 192 was effective as of February 27, 2017. The application dated April 4, 2016, requested an implementation period of 120 days from the date of issuance.
The amendment revises TSs surveillance requirement (SR) associated with TS 3.8.4, "DC [direct current] Sources -Operating." Specifically, the amendment revises SR 3.8.4.2 by increasing the 125 Volt DC battery charger test output current to 75 amperes (amps) from the current test level of 50 amps, and removes the second (alternate) method specified to perform the SR. Amendment No. 192 was effective as of February 27, 2017. The application dated April 4, 2016, requested an implementation period of 120 days from the date of issuance.
During a conversation between Mr. Rick Loeffler of your staff and the NRC staff it was noted that page 2 of the amendment authorization letter for DPR-22 stated an incorrect implementation period of 30 days. The NRC staff concludes that the error was inadvertently introduced during the preparation of the license amendment.
During a conversation between Mr. Rick Loeffler of your staff and the NRC staff it was noted that page 2 of the amendment authorization letter for DPR-22 stated an incorrect implementation period of 30 days. The NRC staff concludes that the error was inadvertently introduced during the preparation of the license amendment.
Line 39: Line 39:
==SUBJECT:==
==SUBJECT:==
MONTICELLO NUCLEAR GENERATING PLANT-CORRECTION OF AMENDMENT NO. 192, ISSUANCE OF AMENDMENT TO REVISE TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.8.4.2 (CAC NO. MF7576) DATED MARCH 13, 2017 DISTRIBUTION:
MONTICELLO NUCLEAR GENERATING PLANT-CORRECTION OF AMENDMENT NO. 192, ISSUANCE OF AMENDMENT TO REVISE TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.8.4.2 (CAC NO. MF7576) DATED MARCH 13, 2017 DISTRIBUTION:
Public LPL3 R/F RidsAcrs_MailCTR Resource RidsNrrDssStsb Resource RidsNrrDorlLpl3 Resource RidsNrrLASRohrer Resource RidsRgn3MailCenter Resource RidsNrrPMMonticello Resource ADAMS Accession No.: ML 17069A256 OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC NAME RKuntz SRohrer DWrona (KGreen for) DATE 03/13/17 03/13/17 03/13/17 OFFICIAL RECORD COPY DORL/LPL3/PM RKuntz 03/13/17 ENCLOSURE REVISED PAGE 2 OF AUTHORIZATION LETTERS FOR AMENDMENT NO. 192 TO RENEWED OPERATING LICENSE NO. DPR-22 NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263  Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 192, are hereby incorporated in the license. NSPM shall operate the facility in accordance with the Technical Specifications.
Public LPL3 R/F RidsAcrs_MailCTR Resource RidsNrrDssStsb Resource RidsNrrDorlLpl3 Resource RidsNrrLASRohrer Resource RidsRgn3MailCenter Resource RidsNrrPMMonticello Resource ADAMS Accession No.: ML17069A256 OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC NAME RKuntz SRohrer DWrona (KGreen for) DATE 03/13/17 03/13/17 03/13/17 OFFICIAL RECORD COPY DORL/LPL3/PM RKuntz 03/13/17 ENCLOSURE REVISED PAGE 2 OF AUTHORIZATION LETTERS FOR AMENDMENT NO. 192 TO RENEWED OPERATING LICENSE NO. DPR-22 NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263  Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 192, are hereby incorporated in the license. NSPM shall operate the facility in accordance with the Technical Specifications.
: 3. This license amendment is effective as of its date of issuance and shall be implemented within 120 days.  
: 3. This license amendment is effective as of its date of issuance and shall be implemented within 120 days.  



Revision as of 16:46, 19 June 2019

Correction to Authorization Page 2 of Amendment No. 192, Issuance of Amendment to Revise Technical Specification Surveillance Requirement 3.8.4.2
ML17069A256
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/13/2017
From: Robert Kuntz
Plant Licensing Branch III
To: Gardner P
Northern States Power Company, Minnesota
Kuntz R
References
CAC MF7576
Download: ML17069A256 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. Peter A. Gardner Site Vice President Monticello Nuclear Generating Plant March 13, 2017 Northern States Power Company -Minnesota (NSPM) 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT-CORRECTION OF AMENDMENT NO. 192, ISSUANCE OF AMENDMENT TO REVISE TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.8.4.2 (CAC NO. MF7576)

Dear Mr. Gardner:

By letter dated February 27, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17013A435) the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 192 to Renewed Facility Operating License No. DPR-22 for the Monticello Nuclear Generating Plant. The amendment consists of changes to the technical specifications (TSs) in response to your application dated April 4, 2016 (ADAMS Accession No. ML16099A097).

The amendment revises TSs surveillance requirement (SR) associated with TS 3.8.4, "DC [direct current] Sources -Operating." Specifically, the amendment revises SR 3.8.4.2 by increasing the 125 Volt DC battery charger test output current to 75 amperes (amps) from the current test level of 50 amps, and removes the second (alternate) method specified to perform the SR. Amendment No. 192 was effective as of February 27, 2017. The application dated April 4, 2016, requested an implementation period of 120 days from the date of issuance.

During a conversation between Mr. Rick Loeffler of your staff and the NRC staff it was noted that page 2 of the amendment authorization letter for DPR-22 stated an incorrect implementation period of 30 days. The NRC staff concludes that the error was inadvertently introduced during the preparation of the license amendment.

To correct the error, a revised copy of page 2 of the amendment authorization letter for DPR-22 is enclosed.

Please replace page 2 of the amendment authorization letter for DPR-22 that was issued by letter dated February 27, 2017, with the enclosed page. These administrative errors do not affect the NRC staffs overall conclusions associated with approval of Amendment No. 192. The changes are within the scope of the application as originally noticed in the Federal Register on June 7, 2016 (81 FR 36621 ).

P. Gardner If you have any questions, please call me at 301-415-3733 or via e-mail at Robert.Kuntz@nrc.gov.

Docket No. 50-263

Enclosure:

Sincerely, /-/7 / -,/ '--/ // Robert/-Kuntz, Project Manager Plant/(icensing Bra c

  • Ill Division of Operating eactor Licensing Office of Nuclear Reactor Regulation Revised Page 2 of Amendment Authorization Letter for DPR-22 cc: ListServ P. Gardner

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT-CORRECTION OF AMENDMENT NO. 192, ISSUANCE OF AMENDMENT TO REVISE TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.8.4.2 (CAC NO. MF7576) DATED MARCH 13, 2017 DISTRIBUTION:

Public LPL3 R/F RidsAcrs_MailCTR Resource RidsNrrDssStsb Resource RidsNrrDorlLpl3 Resource RidsNrrLASRohrer Resource RidsRgn3MailCenter Resource RidsNrrPMMonticello Resource ADAMS Accession No.: ML17069A256 OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC NAME RKuntz SRohrer DWrona (KGreen for) DATE 03/13/17 03/13/17 03/13/17 OFFICIAL RECORD COPY DORL/LPL3/PM RKuntz 03/13/17 ENCLOSURE REVISED PAGE 2 OF AUTHORIZATION LETTERS FOR AMENDMENT NO. 192 TO RENEWED OPERATING LICENSE NO. DPR-22 NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263 Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 192, are hereby incorporated in the license. NSPM shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance and shall be implemented within 120 days.

Attachment:

Changes to the Renewed Operating License No. DPR-22 and Technical Specifications FOR THE NUCLEAR REGULATORY COMMISSION lant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Date of Issuance:

February 27, 2017