Correction to Authorization Page 2 of Amendment No. 192, Issuance of Amendment to Revise Technical Specification Surveillance Requirement 3.8.4.2
ML17069A256
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/13/2017
From: Robert Kuntz
Plant Licensing Branch III
To: Gardner P
Northern States Power Company, Minnesota
Kuntz R
References
CAC MF7576
Download: ML17069A256 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 13, 2017 Mr. Peter A. Gardner Site Vice President Monticello Nuclear Generating Plant Northern States Power Company - Minnesota (NSPM) 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT-CORRECTION OF AMENDMENT NO. 192, ISSUANCE OF AMENDMENT TO REVISE TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.8.4.2 (CAC NO. MF7576)

Dear Mr. Gardner:

By letter dated February 27, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17013A435) the U.S. Nuclear Regulatory Commission (NRC) issued Amendment No. 192 to Renewed Facility Operating License No. DPR-22 for the Monticello Nuclear Generating Plant. The amendment consists of changes to the technical specifications (TSs) in response to your application dated April 4, 2016 (ADAMS Accession No. ML16099A097). The amendment revises TSs surveillance requirement (SR) associated with TS 3.8.4, "DC [direct current] Sources - Operating." Specifically, the amendment revises SR 3.8.4.2 by increasing the 125 Volt DC battery charger test output current to 75 amperes (amps) from the current test level of 50 amps, and removes the second (alternate) method specified to perform the SR.

Amendment No. 192 was effective as of February 27, 2017. The application dated April 4, 2016, requested an implementation period of 120 days from the date of issuance. During a conversation between Mr. Rick Loeffler of your staff and the NRC staff it was noted that page 2 of the amendment authorization letter for DPR-22 stated an incorrect implementation period of 30 days. The NRC staff concludes that the error was inadvertently introduced during the preparation of the license amendment. To correct the error, a revised copy of page 2 of the amendment authorization letter for DPR-22 is enclosed. Please replace page 2 of the amendment authorization letter for DPR-22 that was issued by letter dated February 27, 2017, with the enclosed page.

These administrative errors do not affect the NRC staffs overall conclusions associated with approval of Amendment No. 192. The changes are within the scope of the application as originally noticed in the Federal Register on June 7, 2016 (81 FR 36621 ).

P. Gardner If you have any questions, please call me at 301-415-3733 or via e-mail at Robert.Kuntz@nrc.gov.

Sincerely,

-,/

/

/-/7

//

/

~

Robert/-Kuntz, S~.-mor Project Manager Plant/(icensing Bra c

  • Ill Division of Operating eactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-263

Enclosure:

Revised Page 2 of Amendment Authorization Letter for DPR-22 cc: ListServ

ML17069A256 OFFICE DORL/LPL3/PM DORL/LPL3/LA DORL/LPL3/BC DORL/LPL3/PM NAME RKuntz SRohrer DWrona (KGreen for) RKuntz DATE 03/13/17 03/13/17 03/13/17 03/13/17 ENCLOSURE REVISED PAGE 2 OF AUTHORIZATION LETTERS FOR AMENDMENT NO. 192 TO RENEWED OPERATING LICENSE NO. DPR-22 NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 192, are hereby incorporated in the license. NSPM shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of its date of issuance and shall be implemented within 120 days.

FOR THE NUCLEAR REGULATORY COMMISSION JelS~Yd~

lant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

Attachment:

Changes to the Renewed Operating License No. DPR-22 and Technical Specifications Date of Issuance: February 27, 2017