ML16124B046

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action Amendment to Revise Battery Charger Surveillance Requirement 3.8.4.2
ML16124B046
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 05/03/2016
From: Robert Kuntz
Plant Licensing Branch III
To: Loeffler R
Northern States Power Company, Minnesota
References
MF7576
Download: ML16124B046 (2)


Text

1 NRR-PMDAPEm Resource From:

Kuntz, Robert Sent:

Tuesday, May 03, 2016 2:39 PM To:

Loeffler, Richard A.

Subject:

MONTICELLO NUCLEAR GENERATING PLANT - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT TO REVISE BATTERY CHARGER SURVEILLANCE REQUIREMENT 3.8.4.2 (CAC NO MF7576)

Mr. Loeffler, By letter dated March 4, 2016, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy submitted a license amendment for Monticello Nuclear Generating Plant. The proposed amendment would revises Specification 3.8.4, "DC Sources - Operating", Surveillance Requirement (SR) 3.8.4.2 to increase the required 125 VDC subsystems battery charger output current and to remove the second method specified to perform the surveillance. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff=s detailed technical review by separate correspondence.

If you have any questions, please contact me.

Robert Kuntz Senior Project Manager (Monticello and Prairie Island)

NRC/NRR/DORL/LPL3-1 (301)415-3733

Hearing Identifier:

NRR_PMDA Email Number:

2817 Mail Envelope Properties (Robert.Kuntz@nrc.gov20160503143800)

Subject:

MONTICELLO NUCLEAR GENERATING PLANT - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT TO REVISE BATTERY CHARGER SURVEILLANCE REQUIREMENT 3.8.4.2 (CAC NO MF7576)

Sent Date:

5/3/2016 2:38:44 PM Received Date:

5/3/2016 2:38:00 PM From:

Kuntz, Robert Created By:

Robert.Kuntz@nrc.gov Recipients:

"Loeffler, Richard A." <Richard.Loeffler@xenuclear.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2530 5/3/2016 2:38:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

1 NRR-PMDAPEm Resource From:

Kuntz, Robert Sent:

Tuesday, May 03, 2016 2:39 PM To:

Loeffler, Richard A.

Subject:

MONTICELLO NUCLEAR GENERATING PLANT - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT TO REVISE BATTERY CHARGER SURVEILLANCE REQUIREMENT 3.8.4.2 (CAC NO MF7576)

Mr. Loeffler, By letter dated March 4, 2016, Northern States Power Company, a Minnesota corporation, doing business as Xcel Energy submitted a license amendment for Monticello Nuclear Generating Plant. The proposed amendment would revises Specification 3.8.4, "DC Sources - Operating", Surveillance Requirement (SR) 3.8.4.2 to increase the required 125 VDC subsystems battery charger output current and to remove the second method specified to perform the surveillance. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staff=s detailed technical review by separate correspondence.

If you have any questions, please contact me.

Robert Kuntz Senior Project Manager (Monticello and Prairie Island)

NRC/NRR/DORL/LPL3-1 (301)415-3733

Hearing Identifier:

NRR_PMDA Email Number:

2817 Mail Envelope Properties (Robert.Kuntz@nrc.gov20160503143800)

Subject:

MONTICELLO NUCLEAR GENERATING PLANT - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: AMENDMENT TO REVISE BATTERY CHARGER SURVEILLANCE REQUIREMENT 3.8.4.2 (CAC NO MF7576)

Sent Date:

5/3/2016 2:38:44 PM Received Date:

5/3/2016 2:38:00 PM From:

Kuntz, Robert Created By:

Robert.Kuntz@nrc.gov Recipients:

"Loeffler, Richard A." <Richard.Loeffler@xenuclear.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2530 5/3/2016 2:38:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: