IR 05000237/2017406: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 5: Line 5:
| author name = Cameron J
| author name = Cameron J
| author affiliation = NRC/RGN-III/DRP/B4
| author affiliation = NRC/RGN-III/DRP/B4
| addressee name = Hanson B C
| addressee name = Hanson B
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000237, 05000249
| docket = 05000237, 05000249
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:July 19, 2017
-4352 July 19, 2017 Mr. Bryan Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville , IL 60555 SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3-NRC MATERIAL CONTROL AND ACCOUNTING PROGR AM INSPECTION REPORT 05000237/201 7406; 05000249/201 7406
 
==SUBJECT:==
DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3-NRC MATERIAL CONTROL AND ACCOUNTING PROGR AM INSPECTION REPORT 05000237/201 7406; 05000249/201 7406


==Dear Mr. Hanson:==
==Dear Mr. Hanson:==
Line 30: Line 32:
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Enclosure contains Sensitive Unclassified Non
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, the enclosed report contains Security
-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security
-Related Information, please mark your entire response "Security
-Related Information
-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,
Sincerely,

Revision as of 11:21, 19 June 2019

NRC Material Control and Accounting Program Inspection Report 05000237/2017406; 05000249/2017406
ML17202G452
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 07/19/2017
From: Jamnes Cameron
Reactor Projects Region 3 Branch 4
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2017406
Download: ML17202G452 (4)


Text

July 19, 2017

SUBJECT:

DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3-NRC MATERIAL CONTROL AND ACCOUNTING PROGR AM INSPECTION REPORT 05000237/201 7406; 05000249/201 7406

Dear Mr. Hanson:

On June 23, 201 7, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Dresden Nuclear Power Station, Units 2 and 3 and the NRC inspectors discussed the results of this inspection with Mr. J. Washko , Plant Manager, and other members of your staff.

The results of this inspection are documented in the enclosed report.

The NRC inspector s did not identify any findings or violations of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/ Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos.

50-237; 50-249 License Nos.

NPF-19; NPF-25 Non public Enclosure:

IR 05000237/2017406; 05000249/2017406 cc: L. Antos, Security Director, Dresden J. Klinger, State Liaison Officer, Illinois Emergency Management Agency c c w/o encl: Distribution via LISTSERV