ML17261A165: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 01/22/1980
| issue date = 01/22/1980
| title = LER 79-025/03L-0:on 791223,containment Entry Was Made But Personnel Air Lock Not Tested Until 791226,exceeding 48-h Tech Spec Requirement.Caused by Existing Procedural Inadequacy
| title = LER 79-025/03L-0:on 791223,containment Entry Was Made But Personnel Air Lock Not Tested Until 791226,exceeding 48-h Tech Spec Requirement.Caused by Existing Procedural Inadequacy
| author name = PECK C H
| author name = Peck C
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  

Revision as of 03:17, 19 June 2019

LER 79-025/03L-0:on 791223,containment Entry Was Made But Personnel Air Lock Not Tested Until 791226,exceeding 48-h Tech Spec Requirement.Caused by Existing Procedural Inadequacy
ML17261A165
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/22/1980
From: Peck C
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17249A507 List:
References
LER-79-025-03L, LER-79-25-3L, NUDOCS 8001280246
Download: ML17261A165 (2)


Text

NRC FisIsssM 366 I7.77 I U.S.NUCLEAR REGULATORY COMMISSION t 79-015/03L-0 LICENSEE EV ENT REPORT'~O 7 8 CON'T ,"~O'1, 7 8 ,'~0'Qi (PLEASE P 6 0-0 0 0 0 0-0 0 Qs4 1 1 1 1 ps~ps 25 26 LICENSE TYPE 30 57 CAT 58 air lock was not tested until 12/26/79~This exceeded the 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> re uirement of CONTROL BLOCK: AINT OR TYPE ALL REQUIRED INFORMATION)

I NY RE G1Q20 9 LICENSEE CODE 14 15 LICENSE NUMBER~LQB 0 5 0 0 0 2 4 4 7 1 2 2 3 7 9 8 0 1 2 2 8 0 Qg 60 61 DOCKET NUMBER'8 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES QIO An at power containment entry was made on 12/23/79 but the containment personnel Tech.Spec.4.4.2.4.The test on 12/26/79 was acceptable.

'~OS~O7 80 7 8 9 g personnel air lock is open.A new procedure in check off form requires this notifica-SYSTEM CAUSE CAUSE COMP.VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE~SA Q1>D Qa~ZQ>>R E N E T R Q4~AQ>>~Z Qis 7 8 9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LERiRO EVENT YEAR REPORT NO.CODE TYPE NO.Q17 REPORT~79~~Q2 5~m~03~E~~0 21 22 23 24 26 27 28 29 30 31 32 ACTION FUTURE EFFECT SHUTDOWN ATI'ACHMENT NPRDP PRIME COMP.COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB.SUPPLIER MANUFACTURER Qlll~~ping gpss~Z p>>0 0 0 0~N pss gpss~A pss C 3 1 0 p;33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o The existing procedure does not re uire notification of test and results ersonnel when 2 tion.3~l4 7 8 9 FACILITY STATUS%POWER OTHER STATUS QSO E 1 0 0 NA s Qs~Qs 7 8 9 10 12 13 44 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNT OF ACTIVITY 6~Z Q33~2Q34 NA 7 8 9 10 11 44 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q3g~00 0 P'~ZP'8 9 11 12 13 PERSONNEL INJURIES METHOD OF DISCOVERY DISCOVERY DESCRIPTION Q32 Q31 Review of plant activities 45 46 LOCATION OF RELEASE Q3 NA 45 80 80 80 80 7 8 9 11 12 LOSS OF OR DAMAGE TO FACILITY 43 TYPE DESCRIPTION

[ii~]Z Qss NA 7 8 9 10 PUBLICITY ISSUED DESCRIPTION Q~2~~NQ44 NA 8 9 io NRC USE ONLY 80 80 NAME OF PREPARER Carl H.Peck 68 69 80 ss PHQNE.716/546-2700, ext.291-205 0