ML17261A165

From kanterella
Jump to navigation Jump to search
LER 79-025/03L-0:on 791223,containment Entry Was Made But Personnel Air Lock Not Tested Until 791226,exceeding 48-h Tech Spec Requirement.Caused by Existing Procedural Inadequacy
ML17261A165
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/22/1980
From: Peck C
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML17249A507 List:
References
LER-79-025-03L, LER-79-25-3L, NUDOCS 8001280246
Download: ML17261A165 (2)


Text

NRC FisIsssM 366 I7.77 I CONTROL BLOCK:

I t 6 Qi 79-015/03L-0 LICENSEE EV ENT REPORT (PLEASE P AINT OR U. S. NUCLEAR REGULATORY COMMISSION TYPE ALL REQUIRED INFORMATION)

'~O 7 8 9 NY RE LICENSEE CODE G1Q20 14 15 0 0 0 0 0 LICENSE NUMBER 0 - 0 0 25 Qs4 26 1 1 1 LICENSE TYPE 1

30 ps~ps 57 CAT 58 7

CON'T

"~O'1,

'~0' 8

~LQB 60 61 0 5 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES 0 0 0 DOCKET NUMBER 2

'8 4 4 QIO 7

An at power containment entry was made on 12/23/79 but the containment personnel 69 1 2 2 EVENT DATE 3 7 9 74 8

75 0 1 2 REPORT DATE 2 8 0 80 Qg air lock was not tested until 12/26/79 ~ This exceeded the 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> re uirement of Tech. Spec. 4.4.2.4. The test on 12/26/79 was acceptable.

'~OS

~O7 7 8 9 80 SYSTEM CAUSE CAUSE COMP. VALVE CODE CODE SUBCODE COMPONENT CODE SUBCODE SUBCODE g ~SA Q1> D Qa ~ZQ>> R E N E T R Q4 ~AQ>> ~Z Qis 7 8 9 10 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION Q17 LERiRO REPORT ACTION FUTURE EVENT YEAR

~79 21 22 EFFECT

~

23 SHUTDOWN

~Q2 24 REPORT NO.

5 26

~m 27

~03 28 ATI'ACHMENT CODE 29 NPRDP TYPE

~E 30 PRIME COMP.

~

31 NO.

~0 32 COMPONENT TAKEN ACTION ON PLANT METHOD HOURS Q22 SUBMITTED FORM SUB. SUPPLIER MANUFACTURER Qlll ~~ ping gpss ~Z p>> 0 0 0 0 ~N pss gpss ~A pss C 3 1 0 p; 33 34 35 36 37 40 41 42 43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS Q27 o The existing procedure does not re uire notification of test and results ersonnel when personnel air lock is open. A new procedure in check off form requires this notifica-2 tion.

3

~l4 7 8 9 80

~Qs FACILITY METHOD OF STATUS  % POWER OTHER STATUS QSO DISCOVERY DISCOVERY DESCRIPTION Q32 s E Qs 1 0 0 NA Q31 Review of plant activities 7 8 9 10 12 13 44 45 46 80 ACTIVITY CONTENT RELEASED OF RELEASE AMOUNTOF ACTIVITY LOCATION OF RELEASE Q3 6 ~Z Q33 ~2Q34 NA NA 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES NUMBER TYPE DESCRIPTION Q3g

~00 0 P'~ZP' 8 9 11 12 13 80 PERSONNEL INJURIES 7 8 9 11 12 80 LOSS OF OR DAMAGE TO FACILITY 43 TYPE DESCRIPTION

[ii~]

7 8 9 Z Qss 10 NA 80 PUBLICITY

~2 ~

ISSUED

~NQ44 DESCRIPTION Q NA NRC USE ONLY 8 9 io 68 69 80 ss NAME OF PREPARER Carl H. Peck PHQNE. 716/546-2700, ext. 291-205

0