| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532 |
| -4352 March 8, 2017 Mr. Bryan Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 | | -4352 March 8, 2017 Mr. Bryan Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 |
| | |
| SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 | |
| - NRC INITIAL LICENSE REEXAMINATION REPORT 05000237/2016302 | | - NRC INITIAL LICENSE REEXAMINATION REPORT 05000237/2016302 |
| ; 05000249/2016302 | | ; 05000249/2016302 |
Line 39: |
Line 37: |
| Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50 | | Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50 |
| -237; 50-249 License Nos. DPR | | -237; 50-249 License Nos. DPR |
| -19; DPR-25 Enclosure s: 1. Operator Licensing Reexamination Report 05000 237/2016302; 05000 249/2 016 30 2 2. Simulation Facility Fidelity Report cc: Distribution via LISTSERV T. Dean, Training Director , Dresden Nuclear Power Station Letter to Bryan from Robert J. Orlikowski dated March 8, 2017 | | -19; DPR-25 Enclosure s: 1. Operator Licensing Reexamination Report 05000 237/2016302; 05000 249/2 016 30 2 2. Simulation Facility Fidelity Report cc: Distribution via LISTSERV T. Dean, Training Director , Dresden Nuclear Power Station Letter to Bryan from Robert J. Orlikowski dated March 8, 2017 SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 |
| | |
| SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3 | |
| - NRC INITIAL LICENSE REEXAMINATION REPORT 05000237/2016302 AND 05000249/2016302 DISTRIBUTION | | - NRC INITIAL LICENSE REEXAMINATION REPORT 05000237/2016302 AND 05000249/2016302 DISTRIBUTION |
| : Jeremy Bowen RidsNrrDorlLpl3 | | : Jeremy Bowen RidsNrrDorlLpl3 |
|
---|
Category:Letter
MONTHYEARIR 05000237/20230042024-02-0202 February 2024 Integrated Inspection Report 05000237/2023004 and 05000249/2023004 IR 05000010/20230012024-01-17017 January 2024 NRC Inspection Report 05000010/2023001 (Drss) ML23354A2812024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0031 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 RS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program SVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans ML23279A0712023-10-0606 October 2023 Response to NRC Dresden Nuclear Power Station, Units 2 and 3 - Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 ML23269A0662023-09-28028 September 2023 Proposed Alternative Request RV-23H Associated with the Sixth 10-Year Inservice Testing Interval ML23265A1322023-09-27027 September 2023 Proposed Alternative Request RV-03 Associated with the Sixth 10-Year Inservice Testing Interval ML23205A1362023-09-20020 September 2023 Proposed Alternative Request RV-02D Associated with the Sixth IST Interval IR 05000237/20230112023-09-0606 September 2023 Comprehensive Engineering Team Inspection Report 05000237/2023011 and 05000249/2023011 RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs IR 05000237/20234022023-08-29029 August 2023 Security Baseline Inspection Report 05000237/2023402 and 05000249/2023402 IR 05000237/20230022023-08-0808 August 2023 Integrated Inspection Report 05000237/2023002 and 05000249/2023002 ML23212A9892023-08-0303 August 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23174A1502023-08-0303 August 2023 Issuance of Amendment Nos. 282 and 275 Control Rod Scram Times ML23193A0052023-07-28028 July 2023 Subsequent License Renewal Application Public Meeting Summary of Pre-Submittal Meeting ML23192A6292023-07-11011 July 2023 Correction Letter - Issuance of Amendment Nos. 281 and 274 Regarding Transition to GNF3 Fuel (EPID L-2022-LLA-0121) (Non-Proprietary) ML23144A3142023-07-0606 July 2023 Issuance of Amendment Nos. 281 and 274 Transition to GNF3 Fuel (EPID L-2022-LLA-0121) - Nonproprietary ML23187A0462023-07-0606 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000237/2023004 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20233012023-05-30030 May 2023 NRC Initial License Examination Report 05000237/2023301; 05000249/2023301 RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23132A0932023-05-17017 May 2023 Information Meeting (Public Open House) with a Question and Answer Session to Discuss NRC 2022 End-Of-Cycle Plant Performance Assessment of Dresden Power Station, Units 2 and 3 RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report IR 05000237/20230012023-05-0404 May 2023 Integrated Inspection Report 05000237/2023001 and 05000249/2023001 SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000237/20234012023-04-26026 April 2023 Cyber Security Inspection Report 05000237/2023401 and 05000249/2023401 ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration IR 05000237/20235012023-04-21021 April 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000237/2023501 and 05000249/2023501 ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 ML23088A2242023-04-0505 April 2023 Regulatory Audit Report Regarding License Amendment Request to Transition to GNF3 Fuel ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 2024-02-02
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000237/20213012021-06-17017 June 2021 NRC Initial License Examination Report 05000237/2021301; 05000249/2021301 IR 05000237/20203012020-08-27027 August 2020 NRC Initial License Examination Report 05000237/2020301; 05000249/2020301 IR 05000237/20193012019-05-29029 May 2019 NRC Initial License Examination Report 05000237/2019301 and 05000249/2019301 IR 05000237/20173012017-09-29029 September 2017 NRC Initial License Examination Report 05000237/2017301; 05000249/2017301 (Rkw) IR 05000237/20163022017-03-0808 March 2017 NRC Initial License Reexamination Report 05000237/2016302; 05000249/2016302 (Jls) IR 05000237/20163012016-09-22022 September 2016 NRC Initial License Examination Report 05000237/2016301; 05000249/2016301 IR 05000237/20153012015-05-21021 May 2015 Er 05000237/2015301; 05000249/2015301; 4/06/2015 - 04/22/2015; Exelon Nuclear Operations, Inc., Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-05-29029 May 2014 (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20133012013-12-17017 December 2013 Er 05000237/13-301; 05000249/13-301; 9/30/2013 - 11/26/2013; Exelon Nuclear Operations, Inc., Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report ML12286A3162012-10-12012 October 2012 Er 05000237-12-301; 05000249-12-301; 08/06/2012 - 08/27/2012; Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report ML1118810982011-10-0404 October 2011 Issuance of Amendments Regarding Revision to Technical Specification to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode IR 05000237/20103012010-04-16016 April 2010 Er 05000237-10-301(DRS), 05000249-10-301(DRS), on 2/8/2010 - 3/17/2010, Exelon Nuclear Generating Company, LLC, Dresden Station, Initial License Examination Report IR 05000237/20093012009-04-18018 April 2009 Er 05000237/2009301(DRS) & 05000249/2009301(DRS), on 03/09/09 - 03/23/09; Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report IR 05000237/20083012008-04-17017 April 2008 Initial License Examination Report 05000237-08-301, 05000249-08-301 on 03/03/2008 - 03/20/2008 IR 05000237/20073012007-06-27027 June 2007 Er 05000237-07-301(DRS); 05000249-07-301(DRS); 04/23/2007-04/30/2007; Dresden Nuclear Power Station; Initial License Examination Report SVPLTR 06-0035, Revised Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations.2006-06-22022 June 2006 Revised Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations. IR 05000237/20043012004-09-20020 September 2004 Er 05000237-04-301, 05000249-04-301; 08/16/04-08/20/04; Dresden Nuclear Power Station, Units 2 & 3; Initial License Examination Report IR 05000237/20023022003-02-10010 February 2003 Er 05000237-02-302(DRS), 05000249-02-302(DRS); Exelon Generation Company, LLC; on 01/21/03; Dresden Nuclear Power Station. Initial License Examination Report 2021-06-17
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
-4352 March 8, 2017 Mr. Bryan Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3
- NRC INITIAL LICENSE REEXAMINATION REPORT 05000237/2016302
- 05000249/2016302
Dear Mr. Hanson:
On March 2, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed the initial operator licensing reexamination process for license re-applicants employed at your Dresden Nuclear Power Station, Units 2 and 3. The enclosed report documents the results of those examination s. An exit meeting was conducted on March 2, 2017, between Mr. Thomas Dean , other members of your staff, and Mr. Jesse Seymour , Chief Operator Licensing Examiner, to review observations noted during the examination process as well as the proposed final grading of the operating reexamination for the license re-applicants.
The NRC examiner administered an initial license reexamination operating test during the wee k of February 27, 2017. Two Senior Reactor Operator re-applicants were administered license reexaminations. The results of the reexaminations were finalized o n March 6, 2017. Two applicants passed all sections of their respective reexaminations
- two were issued senior operator licenses.
The examination and other related examination documentation will be withheld from public disclosure for 24 months per your request
. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding."
Sincerely,
/RA/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket Nos. 50
-237; 50-249 License Nos. DPR
-19; DPR-25 Enclosure s: 1. Operator Licensing Reexamination Report 05000 237/2016302; 05000 249/2 016 30 2 2. Simulation Facility Fidelity Report cc: Distribution via LISTSERV T. Dean, Training Director , Dresden Nuclear Power Station Letter to Bryan from Robert J. Orlikowski dated March 8, 2017 SUBJECT: DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3
- NRC INITIAL LICENSE REEXAMINATION REPORT 05000237/2016302 AND 05000249/2016302 DISTRIBUTION
- Jeremy Bowen RidsNrrDorlLpl3
-2 Resource RidsNrrPMDresden Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Nancy Salgado Colleen Schmidt ADAMS Accession Number: ML17067A464 OFFICE RIII RIII RIII RIII NAME JSeymour:jw ROrlikowski DATE 03/07/17 03/08/17 OFFICIAL RECORD COPY Enclosure 1 U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Docket No s: 05000237; 05000249 License N o s: DPR-19; DPR-25 Report No:
05000 237/2 016 302; 05000 249/2 016 30 2 Licensee: Exelon Generation Company, LLC Facilit y: Dresden Nuclear Power Station, Units 2 and 3 Location: Morris , IL Dates: March 1 - March 2, 2017 Inspector:
J. Seymour , Operations Engineer
- Chief Examiner Approved by:
R. Orlikowski, Chief Operations Branch Division of Reactor Safety 2
SUMMARY
Examination Report 05000 237/2 016 302; 05000249/2 016 30 2; 0 3/01/2017 - 0 3/02/2017; Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 2 and 3
- Initial License Reexamination Report.
The announced initial operator licensing reexamination was conducted by regional U.S. Nuclear Regulatory Commission examiners in accordance with the guidance of NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. Examination Summary Two of two re-applicants passed all sections of their respective reexaminations. Two applicants were issued senior operator licenses
. (Section 4OA5.1).
3
REPORT DETAILS
4OA5 Other Activities
.1 Initial Licensing Examinations
a. Examination Scope
The U.S. Nuclear Regulatory Commission (NRC) examiner and members of the facility licensee's staff used the guidance prescribed in NUREG
-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, to develop, validate, administer, and grade the operating test. Members of the facility licensee's staff prepared the outline and developed the operating test. The NRC examiner validated the proposed examination during the week o f February 27, 2017, with the assistance of members of the facility licensee's staff. During the on-site validation, the examiner audited one license re-applicatio n for accuracy. The NRC examiner
, with the assistance of members of the facility licensee's staff, administered the operating test, consisting of job performance measures (JPMs), during the period o f March 1, 2017
, through March 2, 2017
.
b. Findings
- (1) Operating Test The NRC examiner determined that the operating test, as originally proposed by the licensee, was within the range of acceptability expected for a proposed examination.
Examination changes agreed upon between the NRC and the facility were made according to NUREG
-1021, Revision 10. Changes made to the operating test
, documented in a document titled, "Operating Test Comments," as well as the final as administered JPMs, are available electronically in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Document Access and Management System
.
The NRC examiner completed operating test grading o n March 6, 2017.
- (2) Examination Result s Two re-applicants at the Senior Reactor Operator level were administered operating tests. Two re-applicants passed all portions of their reexaminations and were issued their respective operating licenses on March 6, 2017.
.2 Examination Security
a. Scope
The NRC examiner reviewed and observed the licensee's implementation of examination security requirements during the examination validation and administration to assure compliance with Title 10 of the Code of Federal Regulations, Section 55.49, "Integrity of Examinations and Tests.
" The examiners used the guidelines provided in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors
," to determine acceptability of the licensee
's examination security activities.
b. Findings
No findings were identified.
4OA6 Management Meetings
.1 Exit Meeting
The chief examiner conducted an exit meeting to present observations and findings on March 2, 2017, with T. Dean, Training Director
. The examiner asked the licensee whether any of the material used to develop or administer the examination should be considered proprietary.
Proprietary or sensitive information identified during the examination or exit meeting will be handled in accordance with the applicable requirements
. ATTACHMENT:
SUPPLEMENTAL INFORMATION
SUPPLEMENTAL INFORMATION KEY POINTS OF CONTAC
T Licensee
- T. Dean, Training Director
- P. Hansett, Work Control Director
- R. Bauman, Shift Operations Superintendent
- B. Pigg, Shift Manager
- D. Thomas, Manager Operations Training
- C. Kolotka, Training Manager
- W. Cope, Senior Ops Training Instructor
- D. Walker, Senior Regulatory Specialist
- A. Rehn, Regulatory Engineer
U.S. Nuclear Regulatory
Commission
- G. Roach, Senior Resident Inspector
- J. Seymour, Operations Engineer
- Chief Examiner
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None LIST OF ACRONYMS USE
D JPM Job Performance Measure
NRC U.S. Nuclear Regulatory Commission
SIMULATION FACILITY
FIDELITY REPORT Facility Licensee:
Dresden Nuclear Power Station, Units 2 and 3
Facility Docket No:
50-237; 50-249 Operating Tests Administered:
March 1, 2017
- March 2, 2017
The following documents observations made by the NRC examination team during the initial operator license examination. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of non
-compliance with
CFR 55.45(b). These observations do not affect NRC certification or approval of the simulation facility other than to provide information which may be used in future evaluations.
No licensee action is required in response to these observations.
During the conduct of the
simulator portion of the operating tests, the following items were observed: ITEM DESCRIPTION
None None