MONTHYEARSVPLTR 23-0037, Core Operating Limits Report for Cycle 292023-11-29029 November 2023 Core Operating Limits Report for Cycle 29 SVPLTR 23-0021, Registration of Use of Casks to Store Spent Fuel2023-06-20020 June 2023 Registration of Use of Casks to Store Spent Fuel SVPLTR 23-0018, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) SVPLTR 23-0014, Annual Dose Report for 20222023-04-15015 April 2023 Annual Dose Report for 2022 SVPLTR 23-0004, Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities2023-02-10010 February 2023 Owner'S Activity Report Submittal Dresden Nuclear Power Station 6500 North Dresden Road Morris, Il 60450 Fifth 10-Year Interval 2022 Refueling Outage Activities SVPLTR 22-0037, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2022-09-0707 September 2022 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 22-0024, Registration of Use of Casks to Store Spent Fuel2022-06-16016 June 2022 Registration of Use of Casks to Store Spent Fuel SVPLTR 22-0016, Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds2022-06-0808 June 2022 Unit 3, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 2 and Unit 3 Shroud Vertical Welds SVPLTR 22-0017, Registration of Use of Casks to Store Spent Fuel2022-05-25025 May 2022 Registration of Use of Casks to Store Spent Fuel SVPLTR 21-0061, Core Operating Limits Report for Dresden Unit 2 Cycle 282021-11-19019 November 2021 Core Operating Limits Report for Dresden Unit 2 Cycle 28 SVPLTR 21-0057, Submittal of 10 CFR 72.48 Evaluation Summary Report2021-10-15015 October 2021 Submittal of 10 CFR 72.48 Evaluation Summary Report SVPLTR 21-0030, Registration of Use of Casks to Store Spent Fuel2021-06-0202 June 2021 Registration of Use of Casks to Store Spent Fuel SVPLTR 21-0028, 2020 Annual Radiological Environmental Operating Report2021-05-0606 May 2021 2020 Annual Radiological Environmental Operating Report SVPLTR 21-0027, Radioactive Effluent Release Report and Offsite Dose Calculation Manual2021-04-22022 April 2021 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 21-0005, Submittal of Analytical Evaluation of Isolation Condenser Nozzle to Shell Weld Flaw Indications (ISI Weld 3/2/1302A-12/12-8)2021-01-29029 January 2021 Submittal of Analytical Evaluation of Isolation Condenser Nozzle to Shell Weld Flaw Indications (ISI Weld 3/2/1302A-12/12-8) SVPLTR 20-0053, Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld2020-10-15015 October 2020 Deviation from BWR Vessel and Internals Project (BWRVIP) Guideline - Inspection of Unit 3 Top Guide Rim Weld SVPLTR 20-0045, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2020-09-0101 September 2020 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 20-0037, Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-0532020-07-0202 July 2020 Response to Apparent Violation in NRC Inspection Report 05000237/2020012 and 05000249/2020012; EA-20-053 SVPLTR 20-0027, Registration of Use of Casks to Store Spent Fuel2020-05-14014 May 2020 Registration of Use of Casks to Store Spent Fuel SVPLTR 20-0014, Submittal of 2019 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2020-04-21021 April 2020 Submittal of 2019 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 20-0010, Fifth 10-Year Interval 2019 Refueling Outage Activities2020-02-13013 February 2020 Fifth 10-Year Interval 2019 Refueling Outage Activities SVPLTR 19-0049, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2019-09-10010 September 2019 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 19-0031, Registration of Use of Casks to Store Spent Fuel2019-06-14014 June 2019 Registration of Use of Casks to Store Spent Fuel SVPLTR 19-0020, Submittal of 2018 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2019-04-19019 April 2019 Submittal of 2018 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 19-0005, Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities2019-02-0808 February 2019 Owner'S Activity Report Submittal Fifth 10-Year Interval 2018 Refueling Outage Activities SVPLTR 18-0025, Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2018-08-15015 August 2018 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 18-0020, Corrected 2017 Radioactive Effluent Release Report2018-06-28028 June 2018 Corrected 2017 Radioactive Effluent Release Report SVPLTR 18-0018, Registration of Use of Casks to Store Spent Fuel2018-06-14014 June 2018 Registration of Use of Casks to Store Spent Fuel SVPLTR 18-0012, Submittal of 2017 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2018-04-24024 April 2018 Submittal of 2017 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 18-0007, Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revisions 17 and 182018-03-0101 March 2018 Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, Revisions 17 and 18 SVPLTR 17-0033, Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December2017-08-29029 August 2017 Submittal of Corrected 2016 Radioactive Effluent Release Report for January Through December SVPLTR 17-0026, Registration of Use of Casks to Store Spent Fuel2017-06-0606 June 2017 Registration of Use of Casks to Store Spent Fuel SVPLTR 17-0017, Submittal of 2016 Radioactive Effluent Release Report2017-04-26026 April 2017 Submittal of 2016 Radioactive Effluent Release Report SVPLTR 16-0027, 2016 Dresden Nuclear Station Initial License Examination Proposed Exam Files - Licensee Letter Transmitting the Proposed Examination/Test to the NRC2016-12-0101 December 2016 2016 Dresden Nuclear Station Initial License Examination Proposed Exam Files - Licensee Letter Transmitting the Proposed Examination/Test to the NRC SVPLTR 16-0061, Core Operating Limits Report for Unit 3 Cycle 252016-11-21021 November 2016 Core Operating Limits Report for Unit 3 Cycle 25 SVPLTR 16-0018, Transmittal of 2015 Radioactive Effluent Release Report and Offsite Dose Calculation Manual2016-04-25025 April 2016 Transmittal of 2015 Radioactive Effluent Release Report and Offsite Dose Calculation Manual SVPLTR 16-0017, Submittal of Post Accident Monitoring Report Instrumentation2016-04-0808 April 2016 Submittal of Post Accident Monitoring Report Instrumentation SVPLTR 16-0001, Cyber-Security Ms 1 Thru 7 Inspection 2014 405; Notification of Completion of Corrective Actions2016-01-21021 January 2016 Cyber-Security Ms 1 Thru 7 Inspection 2014 405; Notification of Completion of Corrective Actions SVPLTR 15-0070, Core Operating Limits Report for Cycle 24A2015-12-15015 December 2015 Core Operating Limits Report for Cycle 24A SVPLTR 15-0065, Core Operating Limits Report for Cycle 252015-11-16016 November 2015 Core Operating Limits Report for Cycle 25 SVPLTR 15-0059, Core Operating Limits Report, Cycle 242015-10-25025 October 2015 Core Operating Limits Report, Cycle 24 SVPLTR 15-0056, 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report2015-09-0404 September 2015 1, 2 and 3 - Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report SVPLTR 15-0055, Notification of Readiness for NRC 95001 Inspection2015-08-25025 August 2015 Notification of Readiness for NRC 95001 Inspection SVPLTR 15-0052, Response to Preliminary White Finding2015-08-14014 August 2015 Response to Preliminary White Finding SVPLTR 15-0046, ISFSI - Registration of Use of Casks to Store Spent Fuel2015-07-17017 July 2015 ISFSI - Registration of Use of Casks to Store Spent Fuel SVPLTR 15-0043, Registration of Use of Casks to Store Spent Fuel2015-06-12012 June 2015 Registration of Use of Casks to Store Spent Fuel SVPLTR 15-0034, 2014 Annual Radiological Environmental Operating Report2015-05-14014 May 2015 2014 Annual Radiological Environmental Operating Report SVPLTR 15-0020, Written Position on Preliminary White Finding Discussed in NRC Inspection Report 05000237/2014005; 05000249/20140052015-03-0202 March 2015 Written Position on Preliminary White Finding Discussed in NRC Inspection Report 05000237/2014005; 05000249/2014005 SVPLTR 15-0014, Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities2015-02-11011 February 2015 Owner'S Activity Report Submittal Fifth 10-Year Interval 2014 Refueling Outage Activities 2023-06-20
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000237/20213012021-06-17017 June 2021 NRC Initial License Examination Report 05000237/2021301; 05000249/2021301 IR 05000237/20203012020-08-27027 August 2020 NRC Initial License Examination Report 05000237/2020301; 05000249/2020301 IR 05000237/20193012019-05-29029 May 2019 NRC Initial License Examination Report 05000237/2019301 and 05000249/2019301 IR 05000237/20173012017-09-29029 September 2017 NRC Initial License Examination Report 05000237/2017301; 05000249/2017301 (Rkw) IR 05000237/20163022017-03-0808 March 2017 NRC Initial License Reexamination Report 05000237/2016302; 05000249/2016302 (Jls) IR 05000237/20163012016-09-22022 September 2016 NRC Initial License Examination Report 05000237/2016301; 05000249/2016301 IR 05000237/20153012015-05-21021 May 2015 Er 05000237/2015301; 05000249/2015301; 4/06/2015 - 04/22/2015; Exelon Nuclear Operations, Inc., Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations2014-05-29029 May 2014 (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20133012013-12-17017 December 2013 Er 05000237/13-301; 05000249/13-301; 9/30/2013 - 11/26/2013; Exelon Nuclear Operations, Inc., Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report ML12286A3162012-10-12012 October 2012 Er 05000237-12-301; 05000249-12-301; 08/06/2012 - 08/27/2012; Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report ML1118810982011-10-0404 October 2011 Issuance of Amendments Regarding Revision to Technical Specification to Eliminate Main Steam Isolation Valve Closure and Low Condenser Vacuum Scram Functions During Startup Mode IR 05000237/20103012010-04-16016 April 2010 Er 05000237-10-301(DRS), 05000249-10-301(DRS), on 2/8/2010 - 3/17/2010, Exelon Nuclear Generating Company, LLC, Dresden Station, Initial License Examination Report IR 05000237/20093012009-04-18018 April 2009 Er 05000237/2009301(DRS) & 05000249/2009301(DRS), on 03/09/09 - 03/23/09; Dresden Nuclear Power Station, Units 2 and 3; Initial License Examination Report IR 05000237/20083012008-04-17017 April 2008 Initial License Examination Report 05000237-08-301, 05000249-08-301 on 03/03/2008 - 03/20/2008 IR 05000237/20073012007-06-27027 June 2007 Er 05000237-07-301(DRS); 05000249-07-301(DRS); 04/23/2007-04/30/2007; Dresden Nuclear Power Station; Initial License Examination Report SVPLTR 06-0035, Revised Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations.2006-06-22022 June 2006 Revised Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations. IR 05000237/20043012004-09-20020 September 2004 Er 05000237-04-301, 05000249-04-301; 08/16/04-08/20/04; Dresden Nuclear Power Station, Units 2 & 3; Initial License Examination Report IR 05000237/20023022003-02-10010 February 2003 Er 05000237-02-302(DRS), 05000249-02-302(DRS); Exelon Generation Company, LLC; on 01/21/03; Dresden Nuclear Power Station. Initial License Examination Report 2021-06-17
[Table view] |
Text
"
Exelon Generation Company, LLC www.exeloncorp.com Exelen.
Exe ctea Dresden Nuclear Power Station Nuclear 6500 North Dresden Road Morris, IL60450-9765 June 22, 2006 RIS 2005-19 SVPLTR: 06-0035 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Dresden Nuclear Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-1 9 and DPR-25 NRC Docket Nos. 50-237 and 50-249
Subject:
Revised Response to NRC Regulatory Issue Summary 2005-19 "Preparation and Scheduling of Operator Licensing Examinations"
Reference:
- 1. NRC Regulatory Issue Summary (RIS) 2005-19, "Preparation and Scheduling of Operator Licensing Examinations," dated August 24, 2005.
- 2. Exelon/AmerGen Response to RIS 2005-19 dated September 30, 2005 In Reference 1, the NRC requested licensees to voluntarily submit a response concerning initial operator licensing examination needs, including an estimate of the number of applicants to be examined and intentions regarding the preparation of the examinations. In Reference 2, Exelon Generation Company, LLC (Exelon) and AmerGen Energy Company, LLC (AmerGen) provided the operator licensing examination information for each Exelon and AmerGen facility on a separate NRC Form 536.
The attachment to this letter provides a revised response to RIS 2005-19 for Dresden Nuclear Power Station. The revised response is requesting a change in the dates for the Calendar Years 2008 and 2009 for NRC Initial Operator Lioqnsing Examination schedule. Dresden personnel have spoken with Mr. Del McNeil at the NRC Region III Operator Licensing Branch concerning this change. Mr. McNeil has verbally, agreed to this change, and this letter is to formally document the requested change. The revised Initial Operator Licensing Examination information is provided on the attached NRC Form 536.
If you have any questions or require additional information, please do not hesitate to contact us.
Respectfully, D. Bost Site Vice President Dresden Nuclear Power Station Attachment - Completed NRC Form 536 for Dresden Nuclear Power Station _P00:3
Response to RIS 2005-19 Attachment 10 Page 1 of 1 NRC FORM 636 U.S NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31r2008 (8-2006) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for qperator examinations. Send comments regarding burden OPERATOR LICENSING estimate to the Records and FOIAIPdvacy Services Branch (T-5 F63), U.S.
cRegulatOry Commission, Washingto, DC 20555-0001 or by Internet e-mail to intocollects@nrc.gov, and to the Desk Officer, Office ot Information EXAMINATION DATA and Regulatory Affairs, NEOB-10202, (3160-0131), Office of Management and Budget, Washington, DC 20503. If a means used o impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the Information collection.
FACILITY NRC REGION Dresden Nuclear Power Station, Units 2 and 3 iii Renewed Facility Operating License Nos. DPR-19 and DPR-25 NRC Docket Nos. 50-237 and 50-249 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2006 CY 2007 CY 2008 CY 2009 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS "__
B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2006 CY 2007 CY 2008 CY 2009 NUMBER OF REACTOR 0 4 4 OPERATORS NUMBER OF SENIOR REACTOR 6 7 8 8 OPERATORS-INSTANT NUMBER OF SENIOR REACTOR 1 1 2 2 OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE 2/6/06 - 2/10/06 4/23/07 - 4/27/07 2/11/08 - 2/22/08 2/9/09-- 2/20/09 ALTERNATE DATE 2/13/06 - 2/17/06 4/30/07 - 5/4/07 2/25/08 - 3/07/08 2/23/09-- 3/6/09 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2006 CY 2007 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 12 0 0 0 12 0 CANDIDATES