|
|
Line 2: |
Line 2: |
| | number = ML16258A208 | | | number = ML16258A208 |
| | issue date = 09/14/2016 | | | issue date = 09/14/2016 |
| | title = [External_Sender] South Texas Project Generic Safety Issue 191 Resolution RAI 34 Clarification for September 14, 2016 Public Meeting | | | title = (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI 34 Clarification for September 14, 2016 Public Meeting |
| | author name = Harrison A | | | author name = Harrison A |
| | author affiliation = South Texas Project Nuclear Operating Co | | | author affiliation = South Texas Project Nuclear Operating Co |
Letter Sequence Request |
---|
CAC:MF2400, Control Room Habitability (Approved, Closed) CAC:MF2402, Control Room Habitability (Approved, Closed) |
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML15274A5992015-10-0101 October 2015 10-01-15 Public Phone Call Project stage: Request ML16011A0612016-02-0202 February 2016 Summary of 10/1/15 Meeting with STP Nuclear Operating Company to Discuss Revised Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 at South Texas Project, Units 1 and 2 (CAC MF Project stage: Meeting ML16028A1522016-02-18018 February 2016 1/14/2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Modifications to the Licensee'S Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 Project stage: Meeting ML16088A2432016-04-0101 April 2016 2/18/2016, Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) Project stage: Meeting ML16092A0442016-04-11011 April 2016 Summary of 3/3/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) Project stage: Meeting ML16082A5072016-04-11011 April 2016 Request for Additional Information, Phased Response Requested, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) Project stage: RAI ML16095A0102016-04-13013 April 2016 Summary of November 17-19, 2015 Thermal-Hydraulic Review at Texas A&M University; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC MF2400-MF2409) Project stage: Other ML16092A0852016-04-13013 April 2016 3/17/2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2401-MF2409) Project stage: Meeting ML16096A0652016-04-13013 April 2016 Summary of February 4 and 16, 2016, Regulatory Audit at Westinghouse in Rockville, MD, Boric Acid Precipitation, Exemption and License Amendment Request, Risk-Informed Approach to Resolve Generic Safety Issue 191 Project stage: Other ML16111A0272016-04-18018 April 2016 STP Nuclear Operating Company Slideshow for Public Meeting on April 21, 2016 for GSI-191 Resolution (CAC No. MF2400-01) Project stage: Meeting ML16103A3442016-04-26026 April 2016 Summary of February 24-26, 2016 Audit, Debris Transport Review at Alion Science and Technology Corporation, Albuquerque, Nm; Pilot Submittal and Exemption Request, Risk-Informed Approach to Resolve GSI 191 Project stage: Other ML16032A4032016-04-26026 April 2016 FRN, Draft Environmental Assessment and Finding of No Significant Impact, Revise Licensing Basis as Documented in the UFSAR and Request for Exemptions, Risk-Informed Approach to Address GSI-191 (CAC MF2400-MF2409) Project stage: Draft Other ML16032A3872016-04-26026 April 2016 Draft Environmental Assessment and Finding of No Significant Impact, Revise Licensing Basis as Documented in the UFSAR and Request for Exemptions, Risk-Informed Approach to Address GSI-191 (CAC MF2400-MF2409) Project stage: Draft Other ML16127A4002016-05-11011 May 2016 Audit Summary, Thermal-Hydraulic Review on February 23-25, 2016 at Texas A&M University; Pilot Submittal and Request for Exemptions for a Risk-Informed Approach to Resolve Generic Safety Issue 191 (CAC MF2400-MF2409) Project stage: Other ML16125A2902016-05-26026 May 2016 Request for Additional Information, Risk Review, Exemption and License Amendment Request for a Risk-Informed Approach to Resolve Generic Safety Issue (GSI)-191 (CAC Nos. MF2400-MF2409) Project stage: RAI ML16141B0812016-05-31031 May 2016 Audit Summary, Risk Audit on April 12-13, 2016, at Alumni Center at the University of Texas, Austin, Tx; Pilot Generic Safety Issue 191 Submittal and Exemption Request, and Draft Request for Additional Information Project stage: Draft RAI ML16175A1082016-06-24024 June 2016 Summary of 4/21/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 Project stage: Meeting ML16190A0082016-07-13013 July 2016 Summary of 6/22/2016 Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) Project stage: Meeting ML16194A2342016-07-21021 July 2016 Request for Withholding Information from Public Disclosure - 5/6/16 Affidavit Executed by D. Munoz and M. Rozboril, Alion Science and Technology, Response to Follow-up RAIs 18, 38, and 44 Project stage: RAI ML16242A0102016-08-23023 August 2016 NRR E-mail Capture - (External_Sender) FW: South Texas Project GSI-191 Draft Risk Responses to Questions for Public Meeting on August 29, 2016 Project stage: Request ML16242A0092016-08-25025 August 2016 NRR E-mail Capture - (External_Sender) South Texas Project GSI-191 Draft thermal-hydraulic Responses to Questions for Public Meeting on August 29, 2016 Project stage: Request ML16238A5272016-09-0101 September 2016 Summary of 7/28/16, Public Meeting with STP Nuclear Operating Company to Discuss the License Amendment and Exemption Requests to Use a Risk-Informed Approach to the Resolution of GSI-191 (CAC Nos. MF2400 - MF2409) Project stage: Meeting ML16258A3672016-09-0606 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution SNPB-3-2, Bullet 4 16 -inch Bounding Break Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A1002016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI APLA-3-2 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A1042016-09-12012 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI SNPB-3-13 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A0962016-09-13013 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI SSIB-3-4 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A0982016-09-13013 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI 33 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A2072016-09-14014 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI 37 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16258A2082016-09-14014 September 2016 NRR E-mail Capture - (External_Sender) South Texas Project Generic Safety Issue 191 Resolution RAI 34 Clarification for September 14, 2016 Public Meeting Project stage: Request ML16246A0222016-10-0505 October 2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items Related to Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400 - MF2409) Project stage: Meeting ML16279A3312016-10-27027 October 2016 Summary of Public Meeting with STP Nuclear Operating Company Regarding Open Items, Risk-Informed Generic Safety Issue (GSI) 191 Application and Supplements for South Texas Project, Units 1 and 2 (CAC Nos. MF2400-MF2409) Project stage: Meeting ML16302A4532016-12-12012 December 2016 Closeout of Request for Additional Information Questions That Are No Longer Applicable, Resolution of Generic Safety Issue (GSI) 191 (CAC Nos. MF2400-MF2409) Project stage: RAI ML16351A1502016-12-16016 December 2016 Correction Letter Closeout of Request for Information Questions That Are No Longer Applicable Associated with the Resolution of Generic Safety Issue 191 (CAC Nos. MF2400 - MF2409) Project stage: RAI ML16278A5982017-05-0202 May 2017 Letter, Environmental Assessment and Finding of No Significant Impact, Revise Licensing Basis as Documented in the UFSAR and Request for Exemptions, Risk-Informed Approach to Address GSI-191 (CAC MF2400 to MF2409) Project stage: Other ML16278A5992017-05-0202 May 2017 Environmental Assessment and Finding of No Significant Impact, Revise Licensing Basis as Documented in the UFSAR and Request for Exemptions, Risk-Informed Approach to Address GSI-191 (CAC MF2400 to MF2409) Project stage: Other ML17137A3252017-05-17017 May 2017 Safety Evaluation of LAR by South Texas Project Nuclear Operating Company to Adopt a Risk-Informed Resolution of Generic Safety Issue-191 Project stage: Approval ML17151A8432017-06-16016 June 2017 OEDO-17-00326 - EDO Response to ACRS Chairman, Safety Evaluation of License Amendment Request by STP Nuclear Operating Company to Adopt a Risk-Informed Resolution of Generic Safety Issue-191 Project stage: Approval NRC-2016-0092, South Texas Project, Units 1 and 2 - FRN: Exemption from the Requirements of 10 CFR 50.46 and 10 CFR Part 50, Appendix a, General Design Criteria 35, 38, 41 (CAC Nos. MF2402-MF2409)2017-07-11011 July 2017 South Texas Project, Units 1 and 2 - FRN: Exemption from the Requirements of 10 CFR 50.46 and 10 CFR Part 50, Appendix a, General Design Criteria 35, 38, 41 (CAC Nos. MF2402-MF2409) Project stage: Approval ML17037C8712017-07-11011 July 2017 Letter, Exemption from the Requirements of 10 CFR Part 50, Section 50.46 (CAC Nos. MF2402-MF2409) Project stage: Approval ML17037C8762017-07-11011 July 2017 FRN: Exemption from the Requirements of 10 CFR 50.46 and 10 CFR Part 50, Appendix a, General Design Criteria 35, 38, 41 (CAC Nos. MF2402-MF2409) Project stage: Approval ML17055A5002017-07-11011 July 2017 Enclosure 4 to Amendment Nos. 212 and 198, Resolution of Licensee Comments on Safety Evaluation - Risk-Informed Approach to Resolve Generic Safety Issue 191 Project stage: Approval ML17019A0032017-07-11011 July 2017 Attachment 2 to Safety Evaluation - In-Vessel Thermal-Hydraulic Analysis, Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 Project stage: Approval ML17038A2232017-07-11011 July 2017 Issuance of Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 Project stage: Approval ML17019A0022017-07-11011 July 2017 Safety Evaluation, Enclosure 3 to Amendment Nos. 212 and 198 - Risk-Informed Approach to Resolve Generic Safety Issue 191 Project stage: Approval 2016-05-31
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24086A4212024-06-26026 June 2024 Email to Chris Warren Decision on the Exemption Request for South Texas Project ML24086A4252024-06-24024 June 2024 Email to Chris Warren Availability of Environmental Assessment for the South Texas Project Exemption ML24101A0082024-04-10010 April 2024 NRR E-mail Capture - South Texas Project - Relief Request - 50.55a(z)(2) - Rvh Penetration 75 ML24052A0152024-02-20020 February 2024 NRR E-mail Capture - South Texas Project - Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML24052A0112024-02-16016 February 2024 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications (L-2023-LLE-0046) ML23334A0062023-11-29029 November 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23319A4442023-11-15015 November 2023 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - Proposed Alternative to ASME BPV Code Requirements ML23278A1532023-10-0505 October 2023 NRR E-mail Capture - South Texas Project Request for Additional Information - Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23264A0972023-09-21021 September 2023 NRR E-mail Capture - South Texas Project - Request for Additional Information - License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23255A2862023-09-12012 September 2023 NRR E-mail Capture - South Texas Project Draft Request for Additional Information License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23191A0102023-07-0707 July 2023 NRR E-mail Capture - South Texas Project - Acceptance of Request for Indirect Transfer of Licenses and Conforming Amendments (L-2023-LLM-0004) ML23145A1872023-05-24024 May 2023 July 2023 Emergency Preparedness Program Inspection - Request for Information ML23124A3272023-05-0404 May 2023 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Alternate Source Term Dose Calculation (L-2023-LLA-0047) ML23115A0702023-04-24024 April 2023 NRR E-mail Capture - South Texas Project Units 1 and 2 - Audit Plan - Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ML23096A1592023-04-0606 April 2023 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code ML23065A0912023-03-0303 March 2023 NRR E-mail Capture - South Texas Project - Draft Supplemental Information Request - Proposed Alternative to the Requirements of the ASME Code ML23003A8082022-11-28028 November 2022 NRR E-mail Capture - Texas Commission on Environmental Quality (TCEQ) Review/Comment Regarding the Draft Environmental Assessment for the South Texas Project Alternate Disposal Request (L-2021-LLL-0022)) ML22249A0692022-09-0606 September 2022 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-554, Revise Reactor Coolant Leakage Requirements (L-2002-LLA-0113) ML22206A0142022-07-20020 July 2022 NRR E-mail Capture - South Texas Project - Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0502022-07-0707 July 2022 NRR E-mail Capture - South Texas Project - Updated Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22194A0492022-06-0808 June 2022 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 10 CFR 20.2002 Alternate Disposal Request ML22123A3272022-05-0303 May 2022 STP EP Exercise Inspection July 2022 RFI ML22115A2632022-04-19019 April 2022 Email Response to David Lochbaum Regarding Interim Configuration of Holtec HI-STORE FW Spent Fuel Multipurpose Canister at South Texas Project Energy Generating Station ML22105A5642022-04-0505 April 2022 Request for Information for Problem Identification and Resolution at STP Nuclear Operating Company ML21344A0072021-12-0909 December 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Alternative Disposal Request ML21305B8022021-11-0101 November 2021 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Inservice Inspection Impracticality ML21257A2262021-09-14014 September 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (L-2021-LLA-0151) ML21160A1522021-06-0909 June 2021 Request for Information NRC Inspection 2021-003 Public Radiation Safety ML21133A2372021-05-0505 May 2021 Request for Additional Information: STP EP Exercise Inspection - July 2021 ML21117A3242021-04-22022 April 2021 NRR E-mail Capture - (External_Sender) STP Questions About Eplan Amendment SE ML21103A0072021-04-12012 April 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Add a Note to TS 3.6.3 and to Remove the TS Index (L-2021-LLA-0041) ML21058A0002021-02-26026 February 2021 NRR E-mail Capture - South Texas Units 1 and 2 - License Amendment Request to Revise Moderator Temperature Coefficient SRs - Audit Plan and Setup of Online Document Access (L-2021-LLA-0004) ML21049A2652021-02-16016 February 2021 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Moderator Temperature Coefficient Surveillance Requirements (L-2021-LLA-0004) ML21039A8902021-02-0808 February 2021 NRR E-mail Capture - South Texas Project - Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML21029A3312021-01-29029 January 2021 NRR E-mail Capture - South Texas Project - Draft Request for Additional Information - 1RE22 Inspection Summary Report for Steam Generator Tubing ML20244A0222020-08-28028 August 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil. (L-2020-LLA-0172) ML20135H1982020-05-14014 May 2020 NRR E-mail Capture - South Texas Unit 1 - License Amendment Request to Revise Safety Injection System Accumulator Pressure - Audit Plan and Setup of Online Reference Portal ML20125A3312020-05-0404 May 2020 NRR E-mail Capture - South Texas Project - Acceptance of License Amendment Request to Revise the Emergency Plan (L-2020-LLA-0057) ML20111A0052020-04-17017 April 2020 NRR E-mail Capture - South Texas Project - Request for Additional Information - Proposed Alternative to ASME OM Code 2012 Edition - Relief Request PRR-01 ML20050E1192020-02-19019 February 2020 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Actions - Proposed Alternatives to ASME OM Code Requirements (EPID: L 2020-LLR-0007 to L-2020-LLR-0010) ML19344A0092019-12-0909 December 2019 NRR E-mail Capture - South Texas Project - Acceptance of Requested Licensing Action - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping ML19309F1412019-11-0404 November 2019 Supplemental Information Request - Proposed Alternative to ASME Code Requirements for the Repair of Essential Cooling Water System Class 3 Buried Piping (EPID L 2019-LLR-0096) (Draft) ML19291A0332019-10-17017 October 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding Request to Delete E Bar Definition ML19165A1032019-06-14014 June 2019 NRR E-mail Capture - Draft RAI for STP TS 3.8.1.1 Sbdg SR Change ML19162A1162019-05-22022 May 2019 NRR E-mail Capture - Acceptance Review Results: STP License Amendment Request Regarding TSTF-529 ML19095A6562019-04-0404 April 2019 NRR E-mail Capture - (External_Sender) Handout for 4/10/19 Meeting to Discuss a Proposed Request for South Texas Project, Units 1 and 2, Regarding Repair of Piping Using Carbon Fiber Repair Methods ML19081A1512019-03-21021 March 2019 NRR E-mail Capture - Draft Round 2 RAI - Sbdg Voltage and Frequency LAR (L-2018-LLA-0078) ML19078A3792019-03-19019 March 2019 NRR E-mail Capture - Acceptance Review Results: STP RR-ENG-3-23 (L-2018-LLR-0021) ML18292A7272018-10-19019 October 2018 NRR E-mail Capture - Acceptance Review Results: TSTF-522 (L-2018-LLA-0271) ML18283B9522018-10-10010 October 2018 NRR E-mail Capture - Final RAI - South Texas Standby DG TS Change (L-2018-LLA-0078) 2024-06-26
[Table view] |
Text
1 NRR-PMDAPEm Resource From:Harrison Albon <awharrison@STPEGS.COM>
Sent: Wednesday, September 14, 2016 10:17 AM To: Regner, Lisa; Klos, John
Subject:
[External_Sender] DRAFT Supplemental Re sponse to SSIB Follow up to RAI 34 Attachments:
Supplement F2009 RAI-34 (002).pdf Lisa, John, Here is draft supplemental response to Follow up SSIB 34 for Steve Smith and our public call today.
Wayne Harrison STP Licensing (979)292-6413 Hearing Identifier: NRR_PMDA Email Number: 3061 Mail Envelope Properties (526e43adcf214610b6f14e934678d060)
Subject:
[External_Sender] DRAFT Supplemental Response to SSIB Follow up to RAI 34 Sent Date: 9/14/2016 10:16:57 AM Received Date: 9/14/2016 10:17:03 AM From: Harrison Albon Created By: awharrison@STPEGS.COM Recipients: "Regner, Lisa" <Lisa.Regner@nrc.gov>
Tracking Status: None "Klos, John" <John.Klos@nrc.gov>
Tracking Status: None Post Office: CMBXEXCH03.CORP.STPEGS.NET
Files Size Date & Time MESSAGE 168 9/14/2016 10:17:03 AM Supplement F2009 RAI-34 (002).pdf 360524 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
DRAFT Supplemental Response to SSIB Follow up to RAI 34 This supplemental response was written to provide further clarification and analysis to support follow up to RAI-34 response (2016). Follow-up to RAI-34 provided analysis of degasification for bounding temperature conditions from STP
's design basis accident analysis [1]. For all analyzed temperatures above 212 F overpressure was credited to prevent boiling in the pool or a calculated void fraction of less than 2%. This overpressure credit was intended to be applied in accordance with RG 1.82 [2], which states that additional pressure credit should not be taken above what is needed to prevent a failing NPSH value; where boiling conditions and a void fraction >2% were treated as NPSH failure. This previous degasification analysis in the follow-up RAI-34 response, however, did not directly analyze the effect of the calculated void fraction on net positive suction head required (NPSHR) and calculated net positive suction head margin (NPSHM). This supplemental response provides NPSHM, as well as comparison to head loss, analysis to support the follow-up RAI-34 analysis. Additionally this supplement provides results for a best estimate LBLOCA temperature case. Results from the follow-up to RAI-34 analysis are provided below for convenience in Table 1; including an additional Case "1N" representing a best estimate LBLOCA evaluation with cool water conditions. Table 1: Results from 2016 Follow-Up to RAI-34 Analysis Case # Temperature at Sump [°F]
Head Loss (ft)
Accident Analysis Containment Pressure (psia) PContainment Analyzed Pressure (psia)
Pressure value used to yield non-boiling pool conditions / unchallenged conditions Pressure value used to yield passing void fraction (<=0.02) PContainment (psia) Void Fraction PContainment (psia) Void Fraction **1 269.8 0.497 43.3 *41.9 0.000 **2 273.6 0.488 44.9 *44.5 0.000 3 266.9 3.757 45.6 *41.3 0.020 4 213.6 4.946 29.0 *17.5 0.019 5 144.0 7.994 18.3 14.7 0.004 6 144.0 1.071 18.3 14.7 0.000 7 121.0 9.8780 16.9 14.7 0.006 1N 190 5.716 ~16 14.7 0.007 *Smallest pressure above saturation pressure credited to achieve passing degasification scenarios **No debris bed head loss is used for these cases
- only clean strainer head loss is considered. These cases occur less than 5 minutes after the start of recirculation so there will be less than a third of a full sump pool volume turnover. Chemical debris is not expected at this early time post-LOCA. Thus there will not be sufficient debris accumulated on thestrainer to have an impact on head loss at the time of this case. The best estimate case (Case 1N) utilized temperature and pressure from MELCOR-RELAP 5 sump temperature sensitivity analysis [3] modelling a DEGB break on a 27.5" CL. The highest temperature achieved after the initiation of recirculation was found to be 190F, and this single case is evaluated as bounding of the nominal temperature analysis. Results for this case will be provided along with the Follow-up to RAI-34 cases throughout this supplement.
DRAFT Supplemental Response to SSIB Follow up to RAI 34 NPSHM for a given pump can be calculated by taking the difference between the available head of water (NPSHA), adjusted by major and minor flow losses in system piping, and the NPSHR; defined by the pump manufacturer with testing corresponding to the centerline of the pump impeller or calculated with flow rate and geometry at the pump inlet nozzle depending on which case is limiting. The vertical pumps installed at STP, are limited by NPSHM calculated at the pump inlet nozzle in the design basis NPSH calculation [3], however adjustments of NPSHR for air ingestion, following RG 1.82, are made to the impeller centerline test defined NPSHR value. Therefore calculation of adjusted NPSHR, and resultant NPSHM in this supplemental evaluation will be based on the test specified NPSHR value at the pump impeller centerline. The use of NPSHR found from the empirical examination of pump performance at the impeller centerline should not be confused with the calculation vertical datum. Because design basis analysis used a vertical datum at the pump inlet nozzles, all hydraulic head values in this supplemental evaluation will also be referenced from the elevation at the pump inlet nozzle. The equation for NPSHM is provided below for reference. Equation 1 Values of NPSHA and NPSHR from the NPSHm design basis [3] evaluation were used as inputs for this evaluation and are provided below in Table 2 below. Table 2: NPSHR and NPSHA Values from Design Basis Calculation Pump NPSHR Pump Impeller (ft). NPSHA 2015 Calc (ft) T>212 F NPSHA 2015 Calc (ft) T=190 F NPSHA 2015 Calc (ft) T<171 F LHSI 13 7.5 20.1 27.9 HHSI 11 7.4 20.2 28 CS 12 7.2 19.8 27.6 To perform the NPSHM and head loss difference evaluation, first NPSHR from Table 2 was adjusted by the calculated void fraction (Table 1above) from the follow-up to RAI-34 response utilizing the adjustment provided in RG 1.82 Rev. 4 [2] shown in the equation below; where is the void fraction applied as the percentage value and not as a fraction. Equation 2 Adjusted (RG 1.82) NPSHR values utilizing the void fractions calculated in Follow-Up RAI-34 are given in Table 3 below. .
DRAFT Supplemental Response to SSIB Follow up to RAI 34 Table 3: Void Fraction Adjusted NPSH Values Case # Void Fraction LHSI NPSHR Pump CL (ft) HHSI NPSHR Pump CL (ft) CS NPSHR Pump CL (ft) LHSI NPSHRAdj @ Pump CL (ft)
HHSI NPSHRAdj @ Pump CL (ft)
CS NPSHRAdj @ Pump CL(ft) 1 0.000 13 11 12 13.00 11.00 12.00 2 0.000 13 11 12 13.00 11.00 12.00 3 0.020 13 11 12 26.00 22.00 24.00 4 0.019 13 11 12 25.35 21.45 23.40 5 0.004 13 11 12 15.89 13.45 14.67 *6 0.000 13 11 12 13.00 11.00 12.00 7 0.006 13 11 12 16.68 14.11 15.40 1N 0.007 13 11 12 17.55 14.85 16.20
- Case 6 is a half full flow condition however full flow NPHSR values were used in this evaluation.
Next void adjusted NPSHR values, representing adjustment to tested values at the center line of the pump impeller, were related to the datum at the vertical pump inlet datum; which is 15-feet above the centerline of the pump impeller. This relation subtracts 15-feet from the adjusted NPSHR value to account for the 15-feet of water head gained by relating values to the pump inlet datum. Results of this NPSHR relation as well as NPSHM calculated using Equation 1 are provided below in Table 4; noting that NPSHA is related to case temperatures using the rules in Table 2. Table 4: Follow-Up to RAI-34 Void Adjusted NPSHM Case
- Void Fraction LHSI NPSHRAdj @ Pump Inlet (ft) HHSI NPSHRAdj @ Pump Inlet (ft) CS NPSHRAdj @ Pump Inlet (ft) Void Adjusted NPSHM LHSI (ft)
Void Adjusted NPSHM HHSI (ft)
Void Adjusted NPSHM CS (ft) 1 0.000 -2.00 -4.00 -3.00 9.5 11.4 10.2 2 0.000 -2.00 -4.00 -3.00 9.5 11.4 10.2 3 0.020 11.00 7.00 9.00 -3.5 0.4 -1.8 4 0.019 10.35 6.45 8.40 -2.9 1.0 -1.2 5 0.004 0.60 -1.80 -0.60 27.3 29.8 28.2 6 0.000 -2.00 -4.00 -3.00 29.9 32.0 30.6 7 0.006 1.90 -0.70 0.60 26.0 28.7 27.0 1N 0.007 2.55 -0.15 1.20 17.6 20.4 18.6 Utilizing the void adjusted NPSHM (Table 4) values the difference between adjusted NPSHM and head loss (Table 1) is now evaluated.
DRAFT Supplemental Response to SSIB Follow up to RAI 34 Table 5: Head Loss Differences for Follow-up tor RAI-34 Cases Case # Temp (F) Head Loss (ft)
Void Adjusted NPSHM LHSI (ft)
Void Adjusted NPSHM HHSI (ft)
Void Adjusted NPSHM CS (ft) LHSI Difference [NPSHM-HL] (ft) HHSI Difference [NPSHM-HL] (ft) CS Difference [NPSHM-HL] (ft) 1 269.8 0.497 9.5 11.4 10.2 9.0 10.9 9.7 2 273.6 0.488 9.5 11.4 10.2 9.0 10.9 9.7 3 266.9 3.757 -3.5 0.4 -1.8 -7.3 -3.4 -5.6 4 213.6 4.946 -2.9 1.0 -1.2 -7.8 -4.0 -6.1 5 144 7.994 27.3 29.8 28.2 19.3 21.8 20.2 6 144 1.071 29.9 32.0 30.6 28.8 30.9 29.5 7 121 9.878 26.0 28.7 27.0 16.1 18.8 17.1 1N 190 5.716 17.6 18.6 13.9 11.8 14.6 12.9 Of the head loss difference [NPSHM-HL] values calculated above further analysis is only needed for cases 3 and 4 (highlighted yellow) which yielded negative head loss differences when considering the void fractions calculated in follow-up RAI-34. For these cases (3 and 4) the void fraction was decreased in (0.001) increments, while updating NPSHR adjustments as performed in Table 3 and Table 4, until positive head loss difference was realized. This iteration yielded void fraction 0.008 and 0.006 for Case3 and 4 respectively, which were the first void fraction values found by decreasing in 0.001 increments to yield a positive head loss difference value. Results of this iteration are shown in Table 6 which follow the same calculation methodology used for Table 3 through Table 5. Table 6: Results of Incremental Void Fraction Iteration for Positive HLoss Difference Case # Temp (F) Head Loss (ft) Analyzed Pressure (psia) Void Fraction LHSI Difference [NPSHM-HL] (ft) HHSI Difference [NPSHM-HL] (ft) CS Difference [NPSHM-HL] (ft) 3 266.9 3.757 *?? 0.0080 0.5 3.2 1.6 4 213.6 4.946 *?? 0.0060 0.7 3.2 1.7 * ?? denotes that this iteration was performed to find a void fraction that would yield a positive head loss difference. Analyzed pressure is found the next step. In Table 6 the calculated head loss differences including NPSHR adjustment are shown in Columns 6 through 8, increasing the void fraction in Column 5 by 0.001 and redoing calculations would yield a negative number for the head loss difference; ie this is the first positive head loss difference value found with the void fraction incremental iteration. To complete the evaluation the void fraction values for Case 3 and 4 in Table 6 were used as targets, and the CASA Grande degasification model was run by incrementally increasing containment pressure by 0.1 psia until void fraction values equal to or smaller than the respective fractions in Table 6 were found; doing this finds the lowest containment pressure needed to guarantee positive head loss DRAFT Supplemental Response to SSIB Follow up to RAI 34 difference utilizing RG 1.82 adjustments for voiding. Note that all degasification inputs except for the containment pressure and the void fraction found in Table 6 were held constant to their assignments defined in the follow-up to RAI-34 response. Results of this incremental pressure iteration analysis are provided below in Table 7. Table 7: Results for Lowest Containment Pressure to Satisfy Positive HLoss Difference Case # Temp (F) Head Loss (ft) Analyzed Pressure (psia)
Void Fraction LHSI Difference [NPSHM-HL] (ft) HHSI Difference [NPSHM-HL] (ft) CS Difference [NPSHM-HL] (ft) 3 266.9 3.757 42.4 0.0077 0.7 3.4 1.8 4 213.6 4.946 19.8 0.0059 0.7 3.2 1.7 The results of Table 7 were substituted for the original Follow-up to RAI-34 results in Table 5 to form the updated final results (Table 8). Table 8: Updated Final Results - Degasification Implications on Head Loss Difference The results in Table 8 show that positive head loss difference has been achieved for all cases while analyzed pressure remained below DBA accident analysis pressures. In accordance with RG 1.82 only over pressure needed in excess of vapor pressure was credited, and the difference between DBA calculated pressure and analyzed pressure has been tabulated. Case #Temp (F)Head Loss (ft)Design Basis Calc Pressure (psia)Analyzed Pressure (psia)Pressure Difference [DBA-Analyzed] (psia)Void FractionLHSI Difference [NPSHM-HL] (ft)HHSI Difference [NPSHM-HL] (ft)CS Difference [NPSHM-HL] (ft)1269.80.49743.341.91.40.00009.010.99.7 2273.60.48844.944.50.40.00009.010.99.7 3266.93.75745.6242.43.220.00770.73.41.8 4213.64.9462919.89.20.00590.73.21.7 51447.99418.314.73.60.004019.321.820.2 61441.07118.314.73.60.000028.830.929.5 71219.87816.914.72.20.006016.118.817.1 1N1905.716~1614.71.30.00711.814.612.9